Squadron Operations: Summary Information
Overview
Listed below is the information available for operations to this target flown by 550 Squadron.
Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:
- the operation was cancelled before crews were briefed
- the crews have been briefed as to the target, and in some cases the planes may even have been bombed up and the crews on-board at their stations awaiting take-off, before the op has been stood-down
- finally a number of cases where the op was already under way and the planes en-route but for whatever reason the operation was aborted (e.g. the master bomber orders the attack cancelled due to weather conditions at target adversely affecting targeting).
Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.
Servicemen Deployed: Names of the crew in the operation.
Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).
Definitions of the abbreviations used are available: here.
Manageable Lists
The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate.
There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.
Operation/Target: Leuna Oil Plant (14 Jan 1945 - 15 Jan 1945)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Leuna Oil Plant |
14 Jan 1945 |
15 Jan 1945 |
N |
After a week of enforced flying inactivity, the Squadron stood by for operations with 30 crews of which one complete crew was sent to R.A.F. Station, Kirmington and one to R.A.F Station Elsham to make up operationally fit crew members on these stations. F/O Cameron departed from the Squadron on posting to No. 1656 Heavy Conversion Unit, Lindholme, as an instructor. F/O Cameron had completed a very successful tour with the Squadron and was very popular with all members of the Squadron, who regret his going. 27 aircraft took off at approximately 19.00 hours to attach LEUNA synthetic oil plant near Merseberg. "N" (F/O Parsons) proved abortive owing to the unfortunate illness of one of the crew and returned to Carnaby. The remaining 26 "pressed on regardless", led throughout by the indefatigable "F" Fox. The captain F/Lt "Jock" Shaw has at last been compelled to call it a day with a grand total of 42 operations. Higher authority this time refused his application to continue on Ops much to the disappointment of Jock. The weather on route was fairly good but deteriorated at the target to 10/10 cloud. Bombing was by sky-markers and conditions prevented results being observed. Defences were active. None of our aircraft were damaged and returned safely to base. Flying Officers Harris and George completed their first tour of operations without a single abortive. No flying training was carried out. |
Aircraft Deployed |
Servicemen Deployed |
Aircraft Service Number |
Returned or FTR |
Comments |
Crew Details |
NN715
|
Returned |
Primary at 22,000 ft at 00.01 hrs. |
S/L W F Caldow (P) F/L J Cassidy (Nav) F/O S P George (F/Eng) F/O R Sloggett (A/B) F/O D Gear (W/Op) F/O S Squires (MU/AG) F/O J H Marston (R/AG)
|
PB514
|
Returned |
Primary at 20,000 ft at 00.00 hrs. |
F/L G T Pyke (P) Sgt D Hellings (Nav) Sgt D Peters (A/B) Sgt L Adams (W/Op) Sgt D S Eldred (MU/AG) Sgt A T Ellement (R/AG) Sgt H D Davies (F/Eng)
|
NG246
|
Returned |
Primary at 21,500 ft at 00.06 hrs. |
|
NF998
|
Returned |
Primary at 20,000 ft at 00.01 hrs. |
F/O J Harris (P) Sgt G H Simpkins (F/Eng) F/Sgt J W Eppel (Nav) W/O J C Conway (A/B) F/Sgt R G Bickford (W/Op) Sgt W P Waddell (MU/AG) Sgt B S P Barby (R/AG)
|
NG221
|
Returned |
Primary at 21,000 ft at 23.58 hrs. |
F/L D A Shaw (P) F/O F S Adley (F/Eng) P/O R J Moran (Nav) Sgt F E Self (MU/AG) F/Sgt H L Alleyne (MU/AG) F/Sgt G E Collinson (W/Op)
|
PD382
|
Returned |
Primary at 22,000 ft at 00.01 hrs. |
|
NG290
|
Returned |
Primary at 21,000 ft at 00.01 hrs. |
F/O G G H Cowper (P) Sgt R H Whitehead (F/Eng) F/O R M Mills (Nav) F/Sgt C H Baldwin (A/B) F/Sgt S E Willis (W/Op) Sgt S E Morrison (MU/AG) Sgt H R Graham (R/AG)
|
PD321
|
Returned |
Primary at 21,000 ft at 00.01 1/2 hrs. |
|
NG250
|
Returned |
Primary at 19,000 ft at 23.58 1/2 hrs. |
S/L E L Pickles (P) F/O P H Spindler (Nav) F/O T M Evans (A/B) F/O J H Graham (W/Op) P/O L Brooks (MU/AG) F/O G H Pascoe (R/AG) Sgt A R Gow (F/Eng)
|
ME301
|
Returned |
Primary at 20,000 ft at 00.04 hrs. |
P/O K A Smith (P) F/O H R Whitney (A/B) Sgt C Symington (F/Eng) Sgt G Duce (Nav) Sgt R E G Williams (W/Op) Sgt C J Marshall (MU/AG) Sgt H F Longworth (R/AG)
|
ND972
|
Returned |
Primary at 19,000 ft at 00.01 hrs. |
F/O G E Blackler (P) Sgt W R Ross (F/Eng) F/Sgt H P Nichols (Nav) F/Sgt J W Bold (A/B) F/Sgt E Mozley (W/Op) Sgt J Nicholson (MU/AG) Sgt M McCutcheon (R/AG)
|
PB864
|
Returned |
Primary at 20,500 ft at 00.01 hrs. |
F/O J A Beale (P) Sgt Matthews (F/Eng) F/O A F Geen (Nav) F/O G C Glover (A/B) F/Sgt R A Spearing (W/Op) Sgt MacKenzie (MU/AG) F/Sgt J L McKeown (R/AG)
|
NG287
|
Returned |
Primary at 22,000 ft at 23.58 hrs. |
|
PD221
|
Returned |
Primary at 19,000 ft at 00.03 hrs. |
|
PB843
|
Returned |
Abortive - landed Carnaby |
F/L D R Parsons (P) Sgt G E Carter (F/Eng) F/Sgt J Price (Nav) Sgt M W Morrison (A/B) F/Sgt K Robinson (W/Op) Sgt E Dinsley (MU/AG) Sgt J Cooper (R/AG)
|
NG289
|
Returned |
Primary at 22,000 ft at 00.02 hrs. |
|
LM273
|
Returned |
Primary at 19,000 ft at 00.03 hrs. |
F/O D H Grundy (P) W/O E W King (F/Eng) P/O R T Sowter (Nav) W/O R C McLauchlan (A/B) F/Sgt L F Figg (W/Op) Sgt E C Jarvis (MU/AG) Sgt E J MacKenzie (R/AG)
|
NG134
|
Returned |
Primary at 20,000 ft at 23.59 1/2 hrs. |
|
NF931
|
Returned |
Primary at 21,000 ft at 00.01 hrs. |
F/O L G Michie (P) F/O H A Shenker (P) Sgt J Faren (F/Eng) F/Sgt G H Lennox (Nav) F/Sgt L F Johnston (A/B) F/Sgt R J Emmett (W/Op) F/Sgt T A Landers (MU/AG) F/Sgt A Ingram (R/AG)
|
NF932
|
Returned |
Primary at 20,000 ft at 00.00 1/2 hrs. |
F/L E S Allen (P) F/Sgt E T Smith (F/Eng) F/Sgt A B Dennison (Nav) F/Sgt G A Maginley (A/B) F/Sgt R W Lundie (W/Op) Sgt R G Crump (MU/AG) F/O J E Murray-Shirreff (R/AG)
|
ME776
|
Returned |
Primary at 19,000 ft at 23.59 hrs. |
F/O C S George (P) Sgt E E Okines (F/Eng) F/Sgt J D Johnson (Nav) F/Sgt G A Stecker (A/B) F/Sgt T H Jeffs (W/Op) Sgt E W Kilby (MU/AG) Sgt R Challoner (R/AG)
|
NG120
|
Returned |
Primary at 19,000 ft at 00.03 hrs. |
|
LM228
|
Returned |
Primary at 20,000 ft at 00.06 hrs. |
|
NG135
|
Returned |
Primary at 19,000 ft at 00.05 hrs. |
|
PB707
|
Returned |
Primary at 21,000 ft at 00.02 hrs. |
|
NG132
|
Returned |
Primary at 19,000 ft at 23.58 1/2 hrs. |
|
NG243
|
Returned |
Primary at 22,000 ft at 00.07 1/2 hrs. |
|
66/B
|
Returned |
Primary at 21,000 ft at 00.02 hrs (Took off from Kirmington).
[Ed: F/O Liefooghe crew flying aircraft from another Sqdn] |
|
103/O
|
Returned |
Primary at 20500 ft at 00.03 hrs (Took off from Elsham).
[Ed: F/O Rhude crew flying aircraft from another Sqdn] |
|
Summary Statistics
Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:
Aircraft Deployment Statistics
Aircraft deployments |
29 |
MAX Aircraft deployed in single operation |
29 (Leuna Oil Plant, 14 Jan 1945) |
These details were last updated: 21 November 2024
Note
this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added
This note describes the options currently available to produce a smaller,
more manageable list and also describes planned future enhancements to the reporting facility.
Return to the top of the page.