Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Calais (25 Sep 1944 - 25 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 25 Sep 1944 25 Sep 1944 N 25 aircraft and crews detailed, briefed and took off to blast the Hun out of Calais, precision bombing was called for owning to the close proximity of Allied troops The weather conditions were bad over the target and the Master Bomber ordered all aircraft to return to base with their bombs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Abandoned on instructions of Master Bomber F/O F S Adley (F/Eng)
F/O R A Tapsell (P)
F/O D J K White (Nav)
F/O H Black (A/B)
F/Sgt G E Collinson (W/Op)
Sgt J P Sheridan (MU/AG)
Sgt J McVey (R/AG)

Operation/Target: Calais (26 Sep 1944 - 26 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 26 Sep 1944 26 Sep 1944 N 24 aircraft and crews again detailed, briefed and took off to blast the Hun who are still holding out of Calais. This time the weather was good enough to permit precision bombing which was successfully applied.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 3000 at 12.26hrs. F/O F S Adley (F/Eng)
F/O R A Tapsell (P)
F/O D J K White (Nav)
F/O H Black (A/B)
F/Sgt G E Collinson (W/Op)
Sgt J P Sheridan (MU/AG)
Sgt J McVey (R/AG)

Operation/Target: Calais (27 Sep 1944 - 27 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 27 Sep 1944 27 Sep 1944 N 17 aircraft and crews took off for Calais early this morning once again to bomb the Hun into submission. The weather was good and the bombing results were excellent.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 4500 at 10.11 1/2hrs

Operation/Target: Calais (28 Sep 1944 - 28 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 28 Sep 1944 28 Sep 1944 N 12 aircraft and crews took once off for Calais this morning the target area being very small now owing to pressure by Allied forces precision bombing was called for; the weather over the target area was bad and the Master Bomber ordered all A/C to return to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Abandoned

Operation/Target: Walcheren (03 Oct 1944 - 03 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Walcheren 03 Oct 1944 03 Oct 1944 N 17 aircraft and crews detailed to attack and destroy a sea wall which prevent the sea innundating the low lying areas on the island of Walcheren. The weather was bad, 6/10 cloud over the route and 9/10 cloud over the target. The Master Bomber brought the attack down to 4000 ft to bomb and all aircraft were able to identify visual details of the coastline, many aircraft made several runs to ensure accurate bombing. As our portion of the attack developed the wall was breached and gave way in several places and the water crashing rhough, flooding far and wide across the fields and we hope drowned the enemy defences. Good photographs were obtained. In addition to operational flying, a training programme was carried out which included five "Y" cross country exercises. The final summing up of the operations can be made with the quotation from two communiques - (1) A report brought back by two specially reporting Mosquio aircraft shows that the flooding was extensive. (2) The aircraft carrying the 12000lbs "blockbusters" and scheduled to finished off the job at the end of the attack, all brought them back undropped - they were not needed as the job had already been completed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 3,200 feet at 14.37 1/2 hours

Operation/Target: Saarbrucken (05 Oct 1944 - 06 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Saarbrucken 05 Oct 1944 06 Oct 1944 N 27 aircraft with crew were briefed and took-off at 18.22hrs to attack military objectives in SAARBRUCKEN. "F" (F/Lt Shaw) and "A" (S/Ldr Misselbrock) returned early, the former owing to "Gee" being unserviceable and the latter with the Captain sick. The remainder of the force, after flying through some rather dirty weather over England, found the target area almost clear with only ground base or thin cloud to prevent excellent visibility. The marking was punctual and well placed. In addition to a large and apparently concentrated mass of incendiaries with fires taking a good hold, the chief show piece of the evening was a truely tremendous explosion, so great that every crew unanimously noted the time as 22.46 hours, with a sheet of orange flame many hundreas of feet in the air, and smoke rising to 8000 to 10,000 ft. It would appear that the Hun will have several rounds less to fire at our Allies of the 3rd American Army. Flak was described as being moderate. Enemy night fighters were conspicuous by their absence. Photos taken show a mass of incendiary and fire traps, but unfortunately no ground detail. Visibility deteriorated rapdily at base and the aircraft, all of which returned safely, were diverted to Norfolk. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 16,000 ft at 22.38 hours P/O W P F Daniels (P)
Sgt J G Woodhall (F/Eng)
Sgt R G Roberts (Nav)
Sgt R Wright (A/B)
F/Sgt F R Easton (W/Op)
Sgt A E Baker (MU/AG)
Sgt W F Baker (R/AG)

Operation/Target: Fort Frederick Hendrick (12 Oct 1944 - 12 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Fort Frederick Hendrick 12 Oct 1944 12 Oct 1944 N 28 aircraft and crews were offered for operations but only 12, 11 plus one reserve and one crew detailed to act as the Base reserve aircraft. The crews were briefed to carry out yet another attack on FORT FREDERICK HENDRICK, which despite yesterdays attack was still holding out. All our eleven aircraft returned safely to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 10,000 ft at 08.20hrs P/O W P F Daniels (P)
Sgt J G Woodhall (F/Eng)
Sgt R G Roberts (Nav)
Sgt R Wright (A/B)
F/Sgt F R Easton (W/Op)
Sgt A E Baker (MU/AG)
Sgt W F Baker (R/AG)

Operation/Target: Duisburg (14 Oct 1944 - 14 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 14 Oct 1944 N 25 aircraft and crews were briefed to attack the large steelworks of August Thysson at Duisburg, the world largest inland port. 24 aircraft took off without incident at approx 06.30hrs to make their way through layer cloud which broke before the Rhiner but closed in again over the target and only the crew of "H" (F/O Bond) claim to have bombed the ground markers. "N" (F/S Hopman), "A2" (S/L Gainsford) and "E2" (F/O Stevenson) claim to have bombed their objectives on Navigational aids, the others endeavoured to obey the Master Bombers instruction to bomb any built up area they could see in the vicinity of the target. Several crews reported that the Thyssen works were identified and in flames and one crew reported having observed the demolition of a Rhine bridge. At least one good photograph was obtained by "C2" (F/O John) showing a carpet of bomb bursts on the Steelworks which has been enlarged and forwarded to the C in C for his inspection.
F/O Abrams and F/O Dodds and their crews failed to return from this daylight raid in which approximately 1000 heavy aircraft with fighter cover took part.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 19,000 ft at 08.50hrs P/O W P F Daniels (P)
Sgt J G Woodhall (F/Eng)
Sgt R G Roberts (Nav)
Sgt R Wright (A/B)
F/Sgt F R Easton (W/Op)
Sgt A E Baker (MU/AG)
Sgt W F Baker (R/AG)

Operation/Target: Duisburg (14 Oct 1944 - 15 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 15 Oct 1944 N There was no respite for the Squadron for a further 25 aircraft and crews were required, provided and briefed to attack once again Duisburg the scene of their early morning visit. All our aircraft returned safely from this operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 21,000 ft at 01.30 hrs

Operation/Target: Stuttgart (19 Oct 1944 - 20 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 19 Oct 1944 20 Oct 1944 N Twenty six aircraft with crews were offered and twenty five were accepted, plus one aircraft to act as stand-by in the Base. The crews were briefed and took off at 16.50hrs at attack STUTTGART. Twenty took off at this time and the remaining five at 21.30hrs to attack Stuttgart, in two waves. One aircraft was cancelled at the last moment and one aircraft returned early with engine trouble, so in all only 24 aircraft proceeded to the target, one of which, it is regretted, failed to return. F/L Thomas and crew, who had only been with the Squadron a short time and were on their first operational sortie. Moderately cloudy conditions were encountered en route, but over the target 9/10 thick cloud was present and sky marking had to be resorted to. Six crews found momentary gaps to bomb ground markers. Very few results could be seen, only a vague incendiary and fire glow being visible under the cloud. Flak was reported as slight to moderate with some ineffective searchlights. "A" (F/O Young) received some unpleasant attention and was well peppered by flak receiving damage in the tail plane, fuselage, flaps punctured, hydraulics and bomb container. "K" (F/O Daniels) also found Karlsruhe defences awake and received damage to the port wing, fuselage and a punctured tyre. Both aircraft landed safely at Base without casualty. All photographs show cloud and damage cannot be assessed. In additions to operational flying a training programme consisting of Air to Air firing, Air to Sea firing, practice bombing, Fighter affiliation and "Y" Night cross country exercises were carried out.

[Ed: some of the up and down times (and bomb delivery times at primary target) are wildly different (PB514, JB345, EE139, ME301) from the remainder of the aircraft. In the case of ME301 bomb delivery is only 30mins after take-off and 3 hours earlier than any other aircraft.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 16,000 feet at 20.35 hours P/O W P F Daniels (P)
Sgt J G Woodhall (F/Eng)
Sgt R G Roberts (Nav)
Sgt R Wright (A/B)
F/Sgt F R Easton (W/Op)
Sgt A E Baker (MU/AG)
Sgt W F Baker (R/AG)

Operation/Target: Duren (16 Nov 1944 - 16 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duren 16 Nov 1944 16 Nov 1944 N 26 aircraft and crews took off in the usual Squadron style at approximately 12.30hrs to attack DUREN in close support of the advancing American armies. The weather was hazy over Duren but not unkind to our bomb aimers, who thanks to magnificient marking were able to confirm their visual observations and follow the precise instructions of the Master Bomber. The railway complex at this small town, where the line east of Aachen forks to Dusseldorf and Cologne was the aiming point for our aircraft who contribured to the moderate force. Their bombing photographs and visual reports both point to the exceptionally successfull effort which appears to have been repeated on the Command's simultaneous targets at Julich and Heinsberg. Handicapped by the lack of warning, enemy fighters were again absent. Moderate Flak at the target gave an unlucky break to "M2" (F/O George) which was unable to release its bombs due to damage, which amongst other things severed electrical connections. One of the other things was a punctured tyre, in spite of which the pilot landed his aircraft safely at Base on return with a full bomb load. From a gratifying selection of good bombing prints that of "A2" (F/O Shenker) has been chosen for the C in C's enlargement. Plottings are generally well on the mark.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 10,000 ft at 15.30 F/L D A Shaw (P)

Operation/Target: Wanne-Eikel (18 Nov 1944 - 19 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 18 Nov 1944 19 Nov 1944 N The Squadron dispatched 29 aircraft and crews at approximately 15.30hrs to attack a synthetic oil plant at WANNE-EIKEL west of Gelsenkirchen. Soon after take off the crews encountered cloudy weather over England which however cleared across France; shortly after crossing the Rhine a thin layer of stratus cloud with tops at approximately 8000 ft and similiar conditions prevailed over the target area. Although few crews were able to see ground details, the cloud was thin enough for the markers to show through and for the most part a concentrated supply of them was available. Bombing was reported to have been well concentrated around the markers and very early in the attack a large fire developed which, from the column of black smoke which arose it would seem likely that the oil plant was successfully hit. Numerous orange coloured explosions were seen during the course of the attack two which occured at 19.20 and 19.23 must have been particularly large as some of the crews clearly saw the glow when 40 miles away in the homeward journey. Flak was reported to be only slight to moderate in the target area. There were some fighters seen and a few enemy fighters appeared to be about, but our aircraft had no encounters. With the exception of one, all our aircraft attacked the primary target. "C" (F/O Smith) had trouble with a coolant leak in the port inner engine after feathering it and being able to get above 10000 feet he had to abandon just S.E. of Brussels, jettisoning some of his bombs off the East Coast in the permitted area and landing with the remainder. Owing to the deterioration in the weather only 9 aircraft landed at Base, the remainder landed at Stations in the diversion area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 18,300 ft at 19.08

Operation/Target: Aschaffenburg (21 Nov 1944 - 22 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Aschaffenburg 21 Nov 1944 22 Nov 1944 N The Squadron dispatched 26 aircrarft and crews to attack the marshalling yards at ASCHAFFENBURG. The take off at 15.45hrs was good and without incident. Once again the weather denied crews the satisfaction of even seeing the target or assessing results. En route conditions were good, but over France cloud built up and the Master of Ceremonies and his deputy appeared to be going into a "huddle" to decide exactly where the target was. A small break did reveal markers and these were confirmed to be well placed and were bombed. Following aircraft were assisted by a red glow beneath the clouds and several explosions were reported. F/O Stevenson and W/O Hopman with their crews completed there first tour of operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 14,000 ft at 19.17 F/L V B Ansell (P)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
P/O GJ Horsfall (MU/AG)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Freiburg (27 Nov 1944 - 27 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Freiburg 27 Nov 1944 27 Nov 1944 N 31 aircraft and crew were dispatched to attack the town of FREIBURG with its associated rail facilities at approximately 15.45hrs. The target was a small one, only approximately 2 miles by 1 and 1/2 miles, and the attack was entrusted to No. 1 Group to accomplish. With every Squadron putting out it's largest numbers, a new record was accomplished with over 300 aircraft and of these all successfully attacked the primary target, except one which was abortive. 550 Squadron accomplised their best performance to date with 31 aircraft off, 31 attacking the target and 31 aircraft returning to Base. After a smooth take-off and an uneventful journey across Allied held France, our crews found that the P.F.F. had prepared a "bang on" show for them. In spite of considerable thick stratus cloud and base well below, markers were being dropped punctually, and in great profusion while the Master Bomber had his finger "well out" and was giving clear and concise directions with machine gun rapidity. Nearly all our crews bombed on ground markers seen through the haze, although two of them took advantage of sky markers which were also dropped. The cloud base prevented the results from being reported as spectacular as they almost certainly were underneath, but the bombing appeared to be concentrated and a satisfactory fire glow soon developed by the light of which later crews were able to see a large church and streets outlined as the looked obliquely under the large pall of black smoke that soon arose. Flak was light and spasmotic, with no searchlights and none of our aircraft was hit. In fact, what "hit" most of them, was the sight of the lights of the Swiss Town of Basle "Like Piccadilly used to be, I suppose" as one Australian Navigator said, and the misty splendour of the misty Alps in the moonlight.
Postscript message from A.O.C. No. 1 Group: "Last night we operated, in all, 312 aircraft with only one abortive sortie and one aircraft missing. Please give my congratulations to all ranks for this magnificent record, which has never before been approached by any Group. It was a splendid achievement by both air and ground crews. All attacks were highly successful".
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 12,000 ft at 20.05

Operation/Target: Urff Dam (03 Dec 1944 - 03 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Urff Dam 03 Dec 1944 03 Dec 1944 Y 14 aircraft and crew detailed to carry out an attack on URST DAM and took off at approximately 07.30hrs without incident. The weather en-route was bad and over the target visibility was so poor and the weather so bad that the crews returned without dropping their bombs. Flying training programme was also carried out totalling 33.06hrs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Abandoned on instructions of Master Bomber

Operation/Target: Karlsruhe (04 Dec 1944 - 04 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Karlsruhe 04 Dec 1944 04 Dec 1944 N 24 aircraft and crew took off at approximately 16.30hrs to attack the town and railway facilities at KARLRUHE. The crews has an uneventful but rather long trip over Allied Occupied Territory and found the target covered with 9/10th cloud. On approach some crews were able to identify the Red and Green T.I.s below cloud, which were rather scattered. The cloud rapidly moved eastwards and some of the later arrivals were able to identify the town visually. From reports it is gathered that good fires were started in the town, the glow of which could be seen for over 100 miles. Opposition from the ground consisted only of slight flak for the most part bursting well below the aircraft. All our aircraft returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 19,000 feet at 19.35 1/2 hours.

Operation/Target: Merseburg (06 Dec 1944 - 07 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Merseburg 06 Dec 1944 07 Dec 1944 N 30 crews briefed and took their aircraft off at 16.35hrs without incident to attack the synthetic oil plaint at MERSEBERG. The target was the LEUNA chemical works, one of he largest plants in Germnay, covering an area of 1 1/4 sq miles, and employing some 50000 workers in the manufacture of ammonia, fertilisers, chemicals, synthetic oil and other products. Truely a "chemical hot bed". The customary 10/10 cloud again persisted and bombing was carried out on flares. The glow of fires was visible for some distance on the return journey and several explosions were reported. Owing to the density of the cloud photographs proved useless and the report of our P.R.U colleagues are awaited with interest. Flak was reported as being moderate to intense. Little training was carried out owing to the lack of aircraft. From this operation F/L Morris and crew failed to return.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 18,000 ft at 20.47 1/2 hours

Operation/Target: Essen (12 Dec 1944 - 13 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 12 Dec 1944 13 Dec 1944 N 25 aircraft and crews took off without incident at 16.00hrs to attack ESSEN. The journey out proved uneventful and the 10/10 cloud which greets us with almost monotonous regularity was again in evidence. Early crews saw sky markers up aloft, a situation which gave bomb aimers rather a headache, but aircraft arriving later did not have the same problem to solve and were able to bomb in the orthdox fashion. Observed results were confined to a red glow seen reflected on the underside of the clouds and three healthy explosions each of which lighted the sky for appropimately 30 secs. Photographs were unable to throw any light on the subject and so once again we shall have to await the accurate assessment of the result. Flak was light to moderate and later increased in intensity.
In addition to the operations 20.52hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary 18,000 ft at 19.36 F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Ludwigshaven (15 Dec 1944 - 16 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ludwigshaven 15 Dec 1944 16 Dec 1944 N 30 aircraft and crews took off at approximately 14.20 without incident to attack LUDWIGSHAVEN paying particular attention to the chemical works situated on the northern outskirts of the town and extending for approximately 3 miles to the village of Oppan. There was rather more cloud than expected over the route which compelled many crews to fly and to attack from greater heights than intended. The first wave crews were there even before the first pathfinders target indicators, a number of them therefore bombed on navigational aids or on E.T.A. whilst others orbitted thje target until the markers were dropped. A good deal of early bombing was consequently scattered over a wide area as the markers appeared a very good concentration indeed developed. Last crews reports large fires with great volume of smoke. Several photographs brought back confirm the concentration of fires around the markers but ground detail is not good enough to enable their exact location to be plotted. Flak was reported as being considerable, and searchlights very active. The Squadron were to contribute 20 aircraft for this attack. Soon after take off, two aircraft were seen to be having trouble which it was believed might have prevented completion of the sortie, so both reserve aircraft also took off making the Squadron total 30 aircraft, and all of them carried out successful sorties. F/L Pyke "E" had an engine go u/s on the outward route but pressed on regardless to the target and home on three. A/S/L Redmond "R" could not retract one leg of the aircraft undercarriage after take off, he also completed the round trip with a swinging leg.
S/L Redmond on this trip completed his second tour oof operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 18.30hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Ulm (17 Dec 1944 - 18 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ulm 17 Dec 1944 18 Dec 1944 N 29 crews were briefed to attack the rail junction at ULM situated some 100 miles inside the German frontier on the banks of the Danube. Heavy cloud compelled low flying for most of the way, but in the target area there was little more than thin stratus which did not prevent ground markers from being seen through it. The Master Bomber' assessment of the situation however was that the best results were likely to be produced from aiming on the well placed and plentiful sky markers and ordered bombing accordingly. A very good concentration of fire developed, with a number of spectacular explosions occuring among them. Defences were meagre and there were no searchlights active.
S/L Caldow "B" was unlucky - one of the few flak bursts over the target hit one of his aircrafts fuel tanks, which promptly emptied, the tailplane, elevators damaged and one of the aerials shot away which did not interfere with a safe return and landing at Base. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 12,000 ft at 19.37 hrs F/L V B Ansell (P)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Koblenz (22 Dec 1944 - 22 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Koblenz 22 Dec 1944 22 Dec 1944 N 24 crews were briefed to attack the communications centre at KOBLENZ and 20 took off at approximately 15.15 hours in fog which had been with us for days. The visibility at its best was 300 yards. F/Lt Shaw "E" was the first to take to the air and the remainder of the boys decided that if a Scotsman could get off so could they. The 20 aircraft successfully took off, four aircraft were cancelled as the visibility became really impossible. It appears that other stations in the base were not so badly handicapped by weather conditions as was Killingholme, and it is considered that the Squadron did well to get 20 aircraft off the deck. No trouble was experienced on route and all aircraft arrived at the target area with the exception of "H" (F/O Franklyn, J) who had to return from France with a Port Outer Engine unserviceable, and was diverted to R.A.F. Croft. At the target 2/10 to 4/10 thin cloud experienced, the sky marking was a few minutes late, but enough flares were dropped to enable most of the crews to bomb them. Some crews caught momentary glimpses of the two rivers standing out from the snow covered ground and there were opinions that the attack fell slightly south of the aiming point. This is confirmed by photographs brought back. The defences were quiet, flak being described as slight with no searchlights operating. Whilst the aircraft were on their journey, visibility at Base had deteriorated still further and all our aircraft were diverted to Woodbridge and all landed safely. "K" got down at Mildenhall and "Q" at Langham. Flying through the twin flame lanes of the fog dispersal apparatus one Australian gunner was heard to say that it was the first time he felt really warm in this country. No flying training was undertaken.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 19,000 ft at 18.53 hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Cologne (24 Dec 1944 - 25 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 24 Dec 1944 25 Dec 1944 N 23 crews were briefed to attack the marshalling yards at COLOGNE-NIPPES. 22 aircraft successfully took off with the intention of disrupting and disorganising things generally. The weather was anything but good at the time of take off, visibility fluctuating between 400-600 yards and before take off there were sinister rumours of a possible diversion - an ugly word at any time - and the wise ones collected their small kit. F/L MacLachlan "C" was genuinely disappointed at being a non-starter with a burst radiator and F/O Grundy "O" was abortive before setting course with a faulty starboard outer engine. The remainder bombed the target. Crews were surprised at the unusual phenomena of an entire absence of cloud, and with the assistance of very accuruate ground marking, proceeed to disrupt and disorganise as ordered. Photographs show many sticks of craters across the marshalling yards with nearly all the rail tracks severed and much rolling stock destroyed. With the exception of F/O Davidson "T(? - illegible)" who landed at Ludford Magna, all the aircraft landed at U.S.A.A.F Wendling, Norfolk. Any visions both air and ground crews may have had of holly, the flowing bowl and fun and games did not materialise. A certain amount of despondency descended on the Waafery and all the ground crews could do was to drink to absent friends, which they did with some measure of enthusiasm. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 18,000 ft at 18.31 1/2 hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Munchengladbach (28 Dec 1944 - 28 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Munchengladbach 28 Dec 1944 28 Dec 1944 N The Squadron received a preliminary warning for operations and at 15.50 hours nine aircraft took off to attack MUNCHENGLADBACH. From reports received the weather was good over the target and the raid was considered a success. All aircraft returned to Base, although at first the question arose as to whether the crews would return to the station they took off from. At long last the Squadron was able to do some flying training, which amounted to a few minutes short of 14 hours.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 18,000 ft at 19.04 hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)
Sgt C Lambie (F/Eng)

Operation/Target: Nuremburg (02 Jan 1945 - 02 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremburg 02 Jan 1945 02 Jan 1945 N 29 aircraft with crews, plus 2 crews and aircraft from No. 166 Squadron, were briefed to attack Nuremburg. Thirty aircraft took off at approximately 15.00 hours without incident. F/O Summons failed to take off owing to his navigator having met with an accident whilst proceeding to the aircraft. Also one complete crew was sent to R.A.F Elsham Wolds and took off from there to participate in the operation for No. 103 Squadron. The crews found the weather to be cloudy over England, and the Channel, and the Continent as far as 700degrees[???] East. From thence it gradually cleared and at the target conditions were excellent with only a slight ground haze and the built up area contrasted sharply with the snow covered countryside. Owing to the prevailing winds, aircraft arrived early in the target area and some aircraft orbited awaiting the Pathfinder marking. The attacks opened a few minutes early and the first ??? of mixed Red and Green Target Indicators were seen to fall across the Marshalling Yards in the [???] of the town. Excellent concentrated bombing developed, numerous explosions took place, and the glow of the raging fires could be seen 150 miles away by the crews on their return journey. A reconnisance aircraft flying over the target after the attack reported three large area of solid fires to the N.N.W. and one to the S.E. with many smaller ones over the whole area. One aircraft "E" (F/O Smith) developed an oil leak in the port inner engine whilst over France. Correctly following instructions he sought out and found an alternative target, that of the town of Pforsheim, some 25 miles north of the route, lying between Karlsruhe and Stuttgart. The ground defences consisted of slight heavy flak and numerous searchlights, but all ground opposition rapidly decreased as the attack developed. Excellent photographs brought back prove conclusively that the attack was excellent. No flying training was carried out owing to the aircraft being used for operations, but a programme of ground training was carried out by the crews not engaged on operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 16,000 ft at 19.26 hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
P/O H L Davies (F/Eng)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)

Operation/Target: Hannover (05 Jan 1945 - 06 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hannover 05 Jan 1945 06 Jan 1945 N 24 aircraft with crews took off at approximately 19.00 hours to attack HANOVER. The weather was nowhere difficult on route and our crews were led visually to the target by means of it's "Blaze of Glory" that could be seen for a hnudred miles, this blaze had been started by an earlier attack two and a half hours before by [unreadable]. Our attack was to impede the fire fighters and add more fuel to the fires. The [???] was blazing beautifully and the second installment of H.Es and incendiaries was added to the [???]. Fires and smoke increased and could be seen by our crews when over the Zuider Zee on their return. Good photographs were brought back. Flak was reported generally as moderate, but accurate for height and there was searchlight activity, although with the glare of Recc. flares above and the fire glow below they had a pretty thin time. The attack was an outstanding success and Hanover now has a hangover. One of our aircraft "M" (F/O Adams) and crew failed to return, no news being received after take-off. They were a grand team and will be missed by all on the Squadron. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 20,000 ft at 21.54 hrs F/O F S Adley (F/Eng)
F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)

Operation/Target: Munich (07 Jan 1945 - 08 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Munich 07 Jan 1945 08 Jan 1945 N 27 aircraft and crews, which included 2 base reserves, were required on operations and the crews were briefed to attack MUNICH. Owing to three aircraft going unserviceable at the last moment, only 24 aircraft took off at approximately 18.00 hours. Nil to 6/10 cloud tops at 10,000 ft was encountered over this country and the English Channel. A front was positioned just inside the French coast and cloud was 10/10 with tops up to 20,000 ft to approx 5 degress E; from there to 7 degress E, the cloud was thin and a certain amount of icing was experienced, but after crossing the Rhine the cloud once again became 10/10 and the target was completely obscured by fairly thick cloud with tops 10/12000 ft. Owing to stronger winds than forecast the main force arrived early in the target area and many orbited or dog-legged while waiting for markers. Aircraft from No. 5 Group had preceded our attack by several hours and what appeared to be the glow of fires and searchlights illuminating the cloud base could be seen for approximately 40 miles on appreoach to the target. The 5 group attackers experienced more favourable conditions and a concentrated and accuruate bombing appeared to have taken place. For our attack, the markers were sparse. The target indicators rapidly disappeared into the cloud and it was not until 22.33 hours that any degree of concentration of sky marking was achieved; many crews had bombed before this. The concentration of marking was not maintained and the attack can only be regarded as somewhat scattered. No detailed results were observed. Ground defences in the target area consisted only of slight to moderate heavy flak. Stuttgart defenders were active and several combats with night-fighters were reported. All photographs show cloud, therefore no assessment of the attack could be made although from the H.2.S. fixes there can be no doubt that the attack was correctly centered more or less on the centre of the city. F/O Ansell and crew completed a very successful tour with this trip. F/O Clarke ("P") and crew failed to return, nothing having been heard from them after take-off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 18,000 ft at 22.30 hrs F/L V B Ansell (P)
Sgt H Doherty (R/AG)
Sgt F A Decker (F/Eng)
Sgt T D Rodgers (Nav)
Sgt L Trudgian (A/B)
F/Sgt H A Elderfield (W/Op)
Sgt S J H Adams (R/AG)

Operation/Target: Leuna Oil Plant (14 Jan 1945 - 15 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Leuna Oil Plant 14 Jan 1945 15 Jan 1945 N After a week of enforced flying inactivity, the Squadron stood by for operations with 30 crews of which one complete crew was sent to R.A.F. Station, Kirmington and one to R.A.F Station Elsham to make up operationally fit crew members on these stations. F/O Cameron departed from the Squadron on posting to No. 1656 Heavy Conversion Unit, Lindholme, as an instructor. F/O Cameron had completed a very successful tour with the Squadron and was very popular with all members of the Squadron, who regret his going.
27 aircraft took off at approximately 19.00 hours to attach LEUNA synthetic oil plant near Merseberg. "N" (F/O Parsons) proved abortive owing to the unfortunate illness of one of the crew and returned to Carnaby. The remaining 26 "pressed on regardless", led throughout by the indefatigable "F" Fox. The captain F/Lt "Jock" Shaw has at last been compelled to call it a day with a grand total of 42 operations. Higher authority this time refused his application to continue on Ops much to the disappointment of Jock. The weather on route was fairly good but deteriorated at the target to 10/10 cloud. Bombing was by sky-markers and conditions prevented results being observed. Defences were active. None of our aircraft were damaged and returned safely to base. Flying Officers Harris and George completed their first tour of operations without a single abortive. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 21,000 ft at 00.01 1/2 hrs

Operation/Target: Zeitz Oil Plant (16 Jan 1945 - 17 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Zeitz Oil Plant 16 Jan 1945 17 Jan 1945 N 26 aircraft 2 reserve aircraft and crews stood by for operations. The crews were briefed and 28 aircraft took off without incident at 17.30 hours to attack the synthetic oil plant at ZEITZ, situated some 20 miles south of Leipzig. "E" (F/Lt Pyke) had a somewhat "dicey do" soon after take off and while climbing over base the port outer engine caught fire; unable to extinguish it or feather the airscrew, F/Lt Pyke proceeded out to sea to jettison his bombs and do it quickly as the fire threatened to get out of hand. However, all went well for the fire went out soon after recrossing the coast and landed safely. The weather was as per forecast and gave no trouble. On arrival at their distant target they found clear weather and good visibility. The bombing was highly oncentrated on the centre of the target. 9 major explosions and one really super explosion which belched forth flame and black oily smoke were seen, The crew were really enthusistic and highly satisfied with their night's work. The defences and night fighters were very active, but all returned safely to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 18,000 ft at 22.15 1/2 hrs

Operation/Target: Hamborn (22 Jan 1945 - 22 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hamborn 22 Jan 1945 22 Jan 1945 N 27 aircrews were briefed at 08.45 hours and were in thair aircraft ready for action. The Squadron was to be led by the Station Commander G/Cpt McIntyre, but the intended operation was once again cancelled owing to adverse weather en route and over the target. Needless to say the boys were very disappointed for they all, without excpetion, thoroughly enjoy a daylight operation. A good training programme was laid on but had to be cancelled owing to the Squadron having to prepare for another operation for which 31 aircrews were briefed at 14.30 hours and successfully took of at approximately 16.45 hours. Although take off was good, it needed all the pilots skill to successfully accomplish the feat. The runways were on the treacherous side in spite of the amount of time and effort spent on clearing snow and spreading salt and sand. Watching take off my heart momentarily stood still a few times, severlal aircraft when about to become airbourne had a tendancy to swing sharply to starboard which looked decidedly dangerous.
The Squadron was led by Squadron Commander W/Cdr Bryan Bell (Dingle) to attack the steel works at HAMBORN, the northern suburb of Duisburg. F/Lt Summons in "Q" returned early with C S U(?) trouble, but the remaining 30 had a very successful party. The target was clear of cloud, the marking was accurate and bombing concentrated. Several fires were started and explosions reported, one very impressive and 37 minutes after "N" hours. At the end of the attack the target was covered by a thick pall of smoke. Ground opposition was only slight and fighters little in evidence. All returned safely and unscathed to Base. Photographs brought back show excellent results. F/Lt Shenker and F/O Bell with their crews completed their first operational tours on the high note of this most satisfactory operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 19,000 ft at 20.11 hrs

Operation/Target: Mannheim-Ludwigshafen (01 Feb 1945 - 02 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim-Ludwigshafen 01 Feb 1945 02 Feb 1945 N After 10 days of enforced idleness due to excessive weather conditions the Squadron was called up on to supply 29 aircraft and crews plus two aircraft and crews in reserve to attack the rail centre and marshalling yards in LUDWIGSHAVEN. 30 aircraft successfully took off at approx. 1530hrs The weather on route was rather mixed from 10/10 cloud to clear conditions over the Channel well broken cluid over the Continent until the target 10/10 cloud built up about 5 miles hort on the run in. On the return very turbulent conditions were encountered crossing the North Sea to the Norfolk Coast. At the target both ground and sky marking was resorted to by the PFF but with the target indicators disappearing into the low cloud and some of the sky markers being too high for easy aiming, bomb aimers had rather a difficult time. Results were very obscure, there was however a very encouraging incendiary glow that developed into a compact fire mass with two explosions. From the H2S photographs brought back, it is thought that there was a tendency to undershoot. Flak was reported as slight, later decreasing to give way to night fighter activity. Night fighters were more active than usual and several combats were observed.
F/L Maltin and his crew completed their second tour and F/L Doward and his crew completed their first tour of operations successfully. F/O Lohrey and his crew failed to return and it was at first reported as missing but later it was learnt that at least five of his crew, including himself, were safe in Allied Territory, after having been forced to abandon their aircraft which had been badly damaged colliding with a friendly aircraft near the target area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned -

Operation/Target: Weisbane (02 Feb 1945 - 03 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Weisbane 02 Feb 1945 03 Feb 1945 N 28 aircraft and crews were accepted and briefed to attach WEISBANE where enemy troops were reported to be resting and being re-fitted preparatory to a move to the Eastern Front. Of the 28 aircraft, only 26 aircraft took off, 2 aircraft were non-starters owing to one developing engine trouble and the other being bogged due to a temporary failure of some perimeter track lighting. The weather again was our chief enemy. Cloud up to 20,000 ft had been predicted over the Channel only, but in point of fact the worst conditions were over the target where there was layer cloud up to this height and over. Markers were completely obscured and in the circumstances it hardly seems likely that a concentrated attack could have been made. Flak was very ineffective but three of our aircraft saw enemy fighters and opened fire on them without response or conclusive result. All our aircraft returned safely one landing at Kirmington.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 19,000 ft. at 00.06 hrs

Operation/Target: Bottrop (03 Feb 1945 - 03 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bottrop 03 Feb 1945 03 Feb 1945 N The Squadron were called upon to supply 14 aircraft and crews for an attack on the Prosper Coking Plant at BOTTROP north of Essen. In contract to the previous night the weather was good but opinions waried as to whether the target was entirely cloud free but either haze or very thin cloud obscured exact ground detail. The markers were accurately placed and the bombing appear to be equally as good. There were several explosions and quite a number of fires. Ground opposition was reported as being from slight to moderate. Numerous searchlighs were active and believed to have been illuminating for fighters, where were reports as being numerous. F/O Nye and crew in "R" failed to return. It is believed that they has fallen a victim to a night fighter after crossing the battle front and were shot down in Holland. It is feared there were no survivors. F/O Cowper and "F" "pressed on" with his rear turret practically unserviceable throughout the trip. Owing to haze the photographs taken over the target were not particularly good, some of them have, however, been plotted and at least one aiming point secured.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 19.42 hrs

Operation/Target: Kieve (07 Feb 1945 - 08 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kieve 07 Feb 1945 08 Feb 1945 N 27 aircraft and crews were the Squadrons contribution to an attack on KIEVE a road centre where six routes meet, also a rail junction linking the Ruhr and those area still held by the Hun in Holland north of the Rhine - the object being to blot out the town, thus denying the enemy the main route into that part of the battle area. All aircraft successfully took off without incident in the usual Squadron style at approximately 18.30hrs. F/L Pickles in "Y" very reluctantly had to abandon his mission when over France owing to his bomb sight being unserviceable. F/L Rhude had the galling experience of going all the way to the target and then found his bombsight u/s. He made the correct decision, refrained from bombing and brought his bombs back. The route to the target was practically cloud free but the target ware was covered by 9/10-10/01 cloud about 3000 ft thick. The Master Bomber had the matters well organised and brought the main force down beneath the cloud where they found the ground marking concentrated and easy to follow. The crews were unanimous that the bombing was very concentrated with "cookies" bursting all around the markers. Flak was negligible only a few spasmodic bursts being observed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 4,800 ft at 22.08 hrs

Operation/Target: Chemnitz (13 Feb 1945 - 14 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Chemnitz 13 Feb 1945 14 Feb 1945 N 22 aircraft and crews were briefed, and successfully took off at approximately 20.00hrs to attack CHEMNITZ the Bradford of Germany with important rail junctions through which reinforcements from the west, country and southern Germany would have to pass on their way to the Eastern Front. The weather was good over England but deteriorated on approaching the target which was found covered with 10/10th cloud with tops up to 18,000 ft. Markers could not be seen and crews were instructed to bomb on Navigational aids. The concensus of opinion seemed to be that the attack was rather scattered. An aircraft that had bombed however went below cloud and reported that the southern part of the town was burning but the northern part was untouched. Flak was slight and there were no searchlights. Photographs reveal nothing. All aircraft returned safely to base after their nine hours trip.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 00.32 hrs

Operation/Target: Dresden (13 Feb 1945 - 14 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dresden 13 Feb 1945 14 Feb 1945 N 27 aircraft and crews were called upon for operations, 28 crews were briefed, one extra being held in reserve. After some effort 26 aircraft took off at approximately 21.15hrs to attack DRESDEN. The journey across England was unfortunately marred by a fatal accident in which one of our aircraft was involved (B2 - F/L Allen). It appears that an aircraft from 300 Squadron collided with ours near Appe by Manor Lincs, soon after setting course and the wreckage of both planes was scattered over a wide area as a result of explosions.
The weather en-route was better than expected. After a long journey across the continent the target was seen some 180 miles before E.T.A looming up as a dull red glow of fires still raging from a previous attack. The Bombing run was clear which enabled the crews to see the markers and a further concentrated contribution of cookies and incendiaries again made the rear reflecting against the clouds, warming the hearts and feet of the rear gunners. The defences protested, but it was only a feeble attempt. Photographs show an encouraging quantity of fire and incendiary glare and in short show that the attack was a highly successful one.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 18,000 ft at 01.43 hrs

Operation/Target: Dortmund (20 Feb 1945 - 20 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 20 Feb 1945 20 Feb 1945 N 27 aircraft and crews took off without incident to attack once again the heavy engineering manufacturing town of DORTMUND. F/O Ferguson in "L" unfortunately returned early with his starboard inner engine u/s. The remaining aircraft found good weather along the route until approx. 0530 degress E when a low layer of thick cloud gradually built up to 4000 feet, until at the target the markers were barely visible as they dropped into it. The marking was punctual and an adequate number of ground markers, as well as some sky markers were dropped, However, the latter were somewhat scattered and although some encouraging concentrations of incendiary and fire glows were seen indistinctly under the cloud, the illuminating explosions, there was quite a lot of scatted bombing and it must only be considered, from first accounts, as a moderately successful raid. Ground defences were reproted as being only slight to moderate in a loose barrage, with one or two aircraft receiving some predicted attention. Night photographs show a good diplay of incendiary and fire tracks, but clouds have again prevented only plotting. Good shows were put up by F/O Franklyn in "G" who had his port outer engine u/s and had to feather it when over the Bexhill area on the outward journey. F/L Dale in E2 (taking F/L Sarll and crew on their initial operation) had trouble with his port outer engine which was u/s from 0500 degrees outward forcing them to bomb at 13,000 feet. F/O Mearns also had trouble with his starboard outer engine which was partially u/s for the trip.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 21,000 ft at 01.05 hrs

Operation/Target: Duisburg (21 Feb 1945 - 21 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 21 Feb 1945 21 Feb 1945 N [Ed: Target not listed in ORB. Duisburg assumed.] 24 aircraft and crews were detailed and all took off, including "B" (F/L Sarll) whose first independant trip was made with the rear turret u/s. The operations had an unhappy end in the failure of "A" (W/C Bell with the F/L Luger and his crew) to return to base. Everyone will be sorry to lose W/C Bell whose cheerful, forceful personality has been an inspiration to all members of the Squadron and Killingholme generally. It is feared that this layer cloud over the target marred the accuracy of the attack. Marking was punctual, but reports such undershooting, there were, however, large fires and several explosions around the aimers points. Flak at the target was only slight to moderate, fighters on the other hand were much in evidence, "A" F/O Smith the only aircraft to report a combat can claim a suspected ME262 as probably damaged. Owing to the thin cloud none of the photographs succeeded in showing ground details. Congratuations to F/L Harris and crew on the completion of a voluntarily extended tour, without an abortive.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 19,000 ft at 23.08 1/2 hrs

Operation/Target: Pforzheim (23 Feb 1945 - 24 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pforzheim 23 Feb 1945 24 Feb 1945 N 27 aircraft and crews were called for to attack PFORZHEIM and took off at approx. 16.00hrs without incident. Weather at take off was 10/10 low cloud down to 600 ft, but broke up over the continent and the target was quite clear, with some "dangerous moonlight". The markers were accurately placed and the bombing was correspondingly concentrated and the attack has every appearance of being a hightly successful one, fires could still be seen 150 miles away on the homeward journey. Very slight light flak was encountered over the target but night fighters were much in evidence. "C" (F/O Grundy) failed to return from this operation. F/O RD Harris in [NF998] despite a damaged port outer engine which caught fire over the target and severed tube caused by incendiaries, limped back and landed at Manston. One of the crew was injured but not seriously.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 7,000 ft at 20.04 1/2 F/O W M Davidson (P)
Sgt F A Decker (F/Eng)
F/Sgt A V Townsend (Nav)
F/Sgt R J Lloyd (A/B)
F/Sgt W H Evans (W/Op)
Sgt J M Watson (MU/AG)
Sgt C J Sherratt (R/AG)

Operation/Target: Mannheim (01 Mar 1945 - 01 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim 01 Mar 1945 01 Mar 1945 N 26 aircraft with their crews took off at approximately 11.30hrs without incident to participate in a daylight attach on a large concentation of enemy troops reported to be in the vicinity of the Rhine bridgeheads near MANNHEIM. It was unfortunate that on this daylight raid the target was covered by 10/0ths could and results of our bombing could not be observed and assessment of the raid was not possible. Ground defences consisted of approximately a dozen bursts of heavy flak. The bombers were escorted by fighters who kept their opposite numbers out of sight. "K" (F/O Davidson) had a starboard outer engine catch fire and although losing height pressed on to the target bombed and returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary, at 11,500 ft at 15.15 1/2 hrs

Operation/Target: Dessau (07 Mar 1945 - 08 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dessau 07 Mar 1945 08 Mar 1945 N 27 aircraft took off at approximately 17.00hrs on operations, but not without incident. "E2" (W/O Lukies) proved most fractious. The starboard outer engine cut on take-off. The aircraft swung dangerously but the pilot by masterly handling avoided a hanger and other obstacles, proceeded to the jettison area and returned safely. The other aircraft set course on the long route to DESSAU. Cloud amounts variable. Opposition was lively, both from flak and night fighters, but the former was not so strong over the target. Some crews bombed ground markers through 3/10 cloud with a clear view of the town and River Elbe; others had to rely on sky markers owing to 10/10 cloud. General opinion was that the attack was well concentrated and that the target was set, well and truely, ablaze. "M" (S/L Pickles) had it's "Gee" unserviceable from Southern England outwards, but the crew pressed on and after some meandering found themselves near to the target. They bombed in solitary state, a healthy concentration of fires left by their comrades. Two crews reported inconclusive combats with night fighters. Three aircraft "V" (F/O Jones), "O" (F/O Harris) and "R" (P/O Nielson) failed to return and it was with deepest regret that they were reported missing. Nothing was heard from any of them after take-off. Three aircraft and crews carried out flying in training involving over 7 hrs flying.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 14,700 ft at 22.09 hrs F/O H A Findlay (P)
F/Sgt W A Swan (P/F/Eng)
Sgt J B Carter (Nav)
F/O R Melia (A/B)
Sgt E Barton (W/Op)
Sgt I Daly (MU/AG)
Sgt W Towle (R/AG)

Operation/Target: Essen (11 Mar 1945 - 11 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 11 Mar 1945 11 Mar 1945 N 20 aircraft and crews detailed and took off without incident at approximately 11.40hrs on a daylight sortie to Essen, now only some 14 miles ahead of our troops. A total of over 1000 aircraft took part in the attack delivering over 4500 tons of bombs. There was a level carpet of 10/10 cloud all the way out, over the target and back. Crews bombed on coloured smoke puffs assisted by verbal instructions form the Master Bomber. It was considered that the bombing was quite concentrated and very soon a protuberance in the shape of mushrooming fire smoke appeared, agitating the top layers of the cloud - evidently someting was burning down under. Flak was not very troublesome, being variously described as "nil", "very slight" and "slight to moderate". The Luftwaffe was absent. All the aircraft returned safely to base. 7 aircraft and crews carried out flying training to the extent of 24 3/4hrs flying. Day and night practice bombing, fighter affiliations and Y cross countries.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 15.06 hrs F/O H A Findlay (P)
F/Sgt W A Swan (P/F/Eng)
Sgt J B Carter (Nav)
F/O R Melia (A/B)
Sgt E Barton (W/Op)
Sgt I Daly (MU/AG)
Sgt W Towle (R/AG)

Operation/Target: Dortmund (12 Mar 1945 - 12 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 12 Mar 1945 12 Mar 1945 N 23 aircraft took off without incident at approx. 12.50 hours on what was in almost every respect a repetition of the previous days effort. The only difference, the target was DORTMUND. The colour of the sky markers was changed and the time of the attack about tea time, but the same big dome of dark smoke mushroomed up through the cloud tops. Flak was not up to the usual Ruhr standards, and the only fighters seen were our own, and so the raid appeared to be highly satisfactory. Our 23 aircraft returned to base and landed safely with no fuss or botther at all. The crews of F/O E. M. Smith and F/L Edlund completed their tour of operations with this sortie. Two aircraft and crews completed a flying training detail involving 9 1/2 hours total flying.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 16.36 hrs F/O H A Findlay (P)
F/Sgt W A Swan (P/F/Eng)
Sgt J B Carter (Nav)
F/O R Melia (A/B)
Sgt E Barton (W/Op)
Sgt I Daly (MU/AG)
Sgt W Towle (R/AG)

Operation/Target: Nuremberg (16 Mar 1945 - 17 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremberg 16 Mar 1945 17 Mar 1945 N Squadron put 19 aircraft for operations. 18 aircraft took off; F/O Luder aircraft stayed on the ground with an unserviceable rear turret. The target was NURENBURG. Up to 10/10 cloud was experienced en route but this broke up to 4-6/10 in the targe area, over which there was a large gap giving a clear view of the ground markers, which were punctual and concentrated. The Master Bomber's instructions came through clearly. Fires got going quickly outlining the street patterns, finally merging into one large conflagration, the glow from which could be seen for 150 miles on the return journey. Flak defences were only slight to moderate with 15-20 ineffective searchlights which were doused early in the attack. On the other hand, enemy fighter activity was intense from the Stuttgart area to the target and beyond. Many combats were reported. "L" (F/S Wilson) claimed to have damaged a JU.88. "K" (/O Findlay) saw stikes on another. "D" (F/S Jamieson) landed at Manston with the rear gunner, Sgt, Klementoski, wounded so seriously that he has since died. "B" (F/O Liefooghe) failed to return, no news being received after take-off. S/L Caldow AFC, DFC and F/O Cowper completed their tours of operations. The latter came home on three engines. Six aircraft and crews carried out day and night flying training.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 16,500 ft at 21.34 hrs F/O H A Findlay (P)
F/Sgt W A Swan (P/F/Eng)
Sgt J B Carter (Nav)
F/O R Melia (A/B)
Sgt E Barton (W/Op)
Sgt I Daly (MU/AG)
Sgt W Towle (R/AG)

Operation/Target: Hanau (18 Mar 1945 - 19 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hanau 18 Mar 1945 19 Mar 1945 N Squadron detailed 18 aircraft to attack Hanau. "M2" (F/L Sarll) aircraft developed ignition trouble in the port outer engine and did not leave its dispersal. The other 17 aircraft took off in quick succession, commencing at23.50 hours. The route was moderately quite, athough approaching the target and coming out of it, there was evidence of night fighters. Cloud varied in amount, but over the target it was thin. The marking was carried out punctually and in text book fashion. Bombing was reported as well concentrated and the effects were visible from 85 mils distant on the return journey. "D2" (F/O Lukies) reported a combat with a JU.88 and claimed it as damaged. Reports of other crews confirmed this. F/L Dale and crew completed their tour with this op. "Q" (F/L Burrows) aircraft failed to return. Five members returned to the Sqdn after bailing out over no-mans-land and spending exciting days with the 12th US Army. Three aircraft and crews flew 14 1/4 hours on training details.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 10,500 ft at 04.35 hrs F/O H A Findlay (P)
F/Sgt W A Swan (P/F/Eng)
Sgt J B Carter (Nav)
F/O R Melia (A/B)
Sgt E Barton (W/Op)
Sgt I Daly (MU/AG)
Sgt W Towle (R/AG)

Operation/Target: Bremen (21 Mar 1945 - 21 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bremen 21 Mar 1945 21 Mar 1945 N 15 aircraft from the Squadron were detailed for operations. All of them took off safely without incident at approx 08.00. The target was the Deutsche Oil Refinery on the North West outskirts of BREMEN. The route was direct across North Holland, ideal weather conditions were experienced and no flak appeared. Marking was vary accurate and the Master Bomber had a firm and clear control of the attack. Very quickly a pall of smoke, of varying shades, enveloped the target. Along the bombing run the aircraft had to fly through a lane of hot, quite accurate, heavy flak and several aircraft were hit, but none vitally. "K" (P/O Screen) was hit in the port outer engine and limped back to base on three engines. All of the Squadron aircraft landed safely at base. 3 aircraft and crew flew 10 hours flying training.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 15,500 ft at 10.01 1/2 hrs F/O R G Screen (P)
Sgt B T McGee (F/Eng)
Sgt J Carson (Nav)
F/Sgt T W Brown (A/B)
F/Sgt H P Rattenbury (W/Op)
F/Sgt H Jacobs (MU/AG)
Sgt J J Barry (R/AG)

Operation/Target: Hamburg (31 Mar 1945 - 31 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hamburg 31 Mar 1945 31 Mar 1945 N 16 aircraft with crews took off at approximately 06.20 to attack HAMBURG. The weather conditions were bad - 10/10 cloud all the way and over the target. The bombing on sky markers, which were rather scattered, was not considered to be concentrated and the results are awaited. Flak was moderately heavy and two of our aircraft were damaged without casualties. All aircraft returned safely to base just before mid-day to enjoy a good luncheon. Flying training programme was carried out during the afternoon and evening. The Squadron has enjoyed a good months work although unable to put into the air large numbers of crews through crews becoming tour-expired so quickly in succession.

MESSAGE FROM AIR OFFICER COMMANDING No. 1 GROUP.
The month of March 1945 ends with No. 1 Group breaking all records for sorties flown and for bomb tonnage lifted against the enemy of reaching the figures of 3674 (sorties) and 17902 (tons). These achievements truly reflect the energy and determination both of the aircrews and of the ground crews to strike hard blows against the bewildered enemy. I congratulate you all on this magnificient effort and am confident that, should you be called upon to repeat and perhaps even exceed these figures in the Month of April, none will be found wanting. Blucke.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,500 ft at 08.48 hrs

Operation/Target: Nordhausen (03 Apr 1945 - 03 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nordhausen 03 Apr 1945 03 Apr 1945 N 23 aircraft took off - one cancelled owning to engine trouble the remainder took off without incident - to attack a military barracks at NORDHAUSEN. The weather however was not at all cooperative. The continent was covered with varying amounts of cloud 5/10 - 10/10 solid with tops 12000 ft. There were no signs of any sky marking and consequently the Master Bomber gave instructions to bomb on the best "Navigational aids" possible which in most cases was H2S. Four crews decided that the state of their H2S did not warrant bombing and brought their bombs back to base, which in the circumstances was the best procedure. The attack was very scattered. No opposition from ground or air was experienced.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 13,500 ft at 16.19 hrs F/O J A Beale (P)
Sgt Matthews (F/Eng)
F/O A F Geen (Nav)
F/O G C Glover (A/B)
F/Sgt R A Spearing (W/Op)
Sgt MacKenzie (MU/AG)
F/Sgt J L McKeown (R/AG)

Operation/Target: Kiel (09 Apr 1945 - 10 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kiel 09 Apr 1945 10 Apr 1945 N 23 aircraft and crews took off at approx. 19.40hrs without incident to attack KIEL, and joining the other aircraft from neighbouring bases, made an impressive picture as they streamed away to their target. The trip was uneventful for the outward jounrney, and the Met. proving accurate with some cloud en route but clearing completely in the target area, an excellent attack developed. The marking was clearly visible in spite of slight ground haze, and with some details of the Fjord and the coastline visible, appeared accurate. The Master Bomber was faint and difficult to hear, but most crews heard enough to understand the bombing instructions. Bombing appeared very concentrated and soon a pall of black smoke was billowing up with numerous explosions occuring underneath, while the cheerful sight of the glow of fires was seen for upwards of 90/100 miles on the homeward route. Flak varied from slight to intense and several fighters were seen over the target, although none of our aircraft was involved in combats. 22 aircraft attacked the primary target, one aircraft "N" (F/L Parsons) having to abandon soon after take-off due to some of the instrunments going u/s (a good attempt was made to cope with a piece of string as an artificial horizon but without avail). All our aircraft returned safely, including S/L Newitt and his crew who are to be warmly congratulated on finishing their second tour. The photographs shows some excellent ground detail, one or two of them being the clearest received for some time. The best for clarity was that of "R" (F/L Mitchell) which has been plotted as 600yards from the A/P - taken in the early part of the operation it shows that the main weight of the attack fell slightly to the N.E. of the A/P, but sufficiently near to make a successfull attack.
Eight hours night flying training was carried out by two new crews, F/S Thomas and F/S Banahan with their respective crews.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 14,000 ft at 22.36 hrs

Operation/Target: Plauen (10 Apr 1945 - 11 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Plauen 10 Apr 1945 11 Apr 1945 N No. 1 Groups attack last night on Plauen therefore might be regarded as a gesture of "no favour shown". PLAUEN a town about the size of Huddersfield 60(?) miles SSW of Leipzig is a junction where the main line from Berlin and Dresden to the south splits, one branch going S.W. towards Schweinfurt, threatenend by the American forces, and another to Nuremberg, Munich, and the Salzberg area, where Hitler is known to be concentrating material and his most fanatical followers for the "Last Round-up" The attack thus has a dual purpose - to prevent the sinews if was getting to the forces opposing the Americans and to delay the withdrawal to the Bavarian Alps by smashing Plauen's rail facilities. This and the trend of Bomber Command's future targets were indicated by the A.O.C No. 1 Group (Air Vice Marshall R.S. Burke DSO DFC) when he honoured 550 Squadron by attending its briefing. With the heavy influx of new crews, 550 Squadron is now regaining its former scale of effort.

Twenty-seven aircraft were detailed, of these 26 took off, "U" being cancelled because of engine trouble. Weather en-route was cloudless and with only a slight haze at the target many crews were able to identify visually the built-up area of the town. P.F.F were punctual and markers were dropped plumb in the centre of the town. So concentrated was the bombing that it completely obliterated the marking with dust and smoke, and immediately after "H" hours, the Master Bombert ordered bombing on the centre of the smoke which was seen billowing to 8/10,000feet. Several explosions were reported and fires were started which could be seen for upwards of 100 miles on the return journey. Ground defences were negligible at the opening of the attack, but increased to slight to slightly scatted H.F mainly below the bombing height band. There was some slight fighter activity but none of the our aircraft was engaged in combat. At interrogation crews were surprisingly full of beans after their long trip. One of the best pieces of back chat came from a Navigator and a Rear Gunner who differed over the amount of flak encountered over the target. The Navigator took the honours with the final and cruel retort "anyway we were home by the time you got to the target". "J" (F/L Browne) landed back at Manston on two engines after a trip that was full of incident. Soon after crossing the French coast outward and when at 3000 ft J's starboard engine caught fire and had to be feathered. Although there was no hope of gaining the briefed bombing height, the Captain decided to carry on to the target which was reached on time, and at a height of 11500 ft, well below the main force bombing height. Preferring to wait for the end of the attack to going in under the open bomb doors of the main Force "J" orbited the target area twice. Then 2 1/2mins after the close of the main attack J's air-bomber dropped his bombs on an Emergency sighting angle - the bomb sight was u/s owing to the failure of the starboard inner and the crew had the satisfaction of seeing them drop close to a blazing factory. On the camera run, with the bomb doors still open, "J" was hit by flak which damaged the tops of the bomb bays. Control of the aircraft was not affected but J's troubles were by no means over. In the region of Frankfurt while at 9,000 ft the port outer engine, which had been giving cause for anxiety, failed. Height was maintained, but the area of the Rhine I.A.Zs had to be crossed at 9,000 ft and these opened up. Fortunately, they broke off as soon as the colours of the period were fired and a safe landing was made at Manston. Photos confirm that the bombing was concentrated. F/L MacLachlan and crew completed their tour of operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 17,000 ft at 23.10 hrs

Operation/Target: Potsdam (14 Apr 1945 - 15 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Potsdam 14 Apr 1945 15 Apr 1945 N The Squadron supplied 25 aircraft with crew as their contribution towards a force of 400 to attack POTSDAM. They took off without let or hinderance and Londoners could have seen them flying serenely over the Metropolis - cloud and other things being equal. The journey across France, Luxemburg and Western Germany was as uninspiring as it was lenghty. There was a certain amount of flak on approaching the target and on the way out, but considering it was the heart of Germnay and only 18 miles from Berlin, the defences, to use an Americanism, seemed about "tapped out". May they remain in this conciliatory state! Several decoys were seen but did not swerve us from our main purpose. The target was found to be clear of cloud and was identified visually by the adjoining lakes. Markers were plentiful and with the Master Bomber giving explicit instructions, the attack developed along the right lines. The journey back was just a long, long trail and all out aircraft landed safely at Base in the "wee small hours". Our three Musketeers again produced plottable photographs and our congratualtions are extened to F2 (F/O Town) on obtaining an A/P - a fast pace, which we hope can be kept up. Details of all plottable photographs are given, but this in no way detracts from the merits of the others. They are merely devoid of ground details and full of exuberance of smoke and fire.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 20,000 ft at 22.53 1/2 hrs

Operation/Target: Heligoland (18 Apr 1945 - 18 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Heligoland 18 Apr 1945 18 Apr 1945 N 28 aircraft with crews took off in the usual 550 Squadron style at 10.10hrs to attack the German fortified island of HELIGOLAND. The crews were delighted at being able to participate in another daylight raid. The journey outward was uneventful and visibiity was excellent, the weather being that of a hot summer's day. Our contribution was part of a force of 950 aircraft. Bombing commenced a minute early and the absence of marking in no way affected the accuracy of the bombing. Indeed, the concentration of bombing was so tremendous that it was not thought that markers, had they been dropped, would have remained visible long enough for them to have been used as an aiming point. The island was so saturated by the weight of the attack that the crews met only negigible opposition from the ground defences. No enemy aircraft were encountered. A great number of excellent photographs were obtained giving proof of an outstanding attack. An aircraft carrying a movie-camera was present throughout the attack. P/O Town had to return early owing to engine failure. Eleven hours night flying training was also carried out.
Station Summary
OPERATIONS: A daylight operation took place on the defensive fortress of HELIGOLAND ISLAND. 28 aircraft took off from North Killingholme, one was abortive due to excessive coolant temperature in the port outer engine, and the remainder bombed the primary with excellent results.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 18,500 ft at 12.50 hrs F/Sgt M J Ball (P)
F/Sgt P Clark (F/Eng)
Sgt F M Johnstone (Nav)
Sgt A E Farmer (A/B)
Sgt W H Bailey (W/Op)
Sgt F Law (MU/AG)
Sgt G W Butcher (R/AG)

Operation/Target: Bremen (22 Apr 1945 - 22 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bremen 22 Apr 1945 22 Apr 1945 N It was a formidable force that Bomber Command detailed, with four separate aiming points - enemy strong points on the east side of Bremen, within a few miles of our troops. No. 1 Group had the honour of opening the attack, and 550 Squadron contributed 27 aircraft to this spearhead. All 27 took off at 18:00, but "G" (F/O Johnston) had an engine out on take-off and was saved the consequent "cross country". The remainder completed the course and the majority returned as full of eggs as when they departed. They had the chagrin of seeing most of Bremen clear of cloud but the target area itself covered by a thick patch and because our troops were so near the Master Bomber had no choice but to call the party off. Our crews held out the hope that conditions might improve for later waves, but it transpired that only our force fitted with special equipment could bomb. That, at any rate, was a gesture to our troops, who we hope realised, when they saw the bombers overhead that the promised assistance was only withheld so that they should not be imperialed. Return was more or less devoid of incident except for "M" (F/O Handley) which after touching down took off again for a flight, which, unfortunately cannot be counted as squadron training hours.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Mission abandoned F/Sgt M J Ball (P)
F/Sgt P Clark (F/Eng)
Sgt F M Johnstone (Nav)
Sgt A E Farmer (A/B)
Sgt W H Bailey (W/Op)
Sgt F Law (MU/AG)
Sgt G W Butcher (R/AG)

Operation/Target: -/MANNA (02 May 1945 - 02 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
-/MANNA 02 May 1945 02 May 1945 N Once again 27 aircraft with crew took off at 12.30 hrs to deliver more groceries to the Dutch people.
Station Summary
OPERATIONS: A "MANNA" operation was ordered, and 27 aircraft proceeded to the same area adjoining Rotterdam, dropped in all 60.453 tons of food and all returned safely without incident. Advice was received from Base operations that "MANNA" and "EXODUS" sorties are to count as operational trips for the purposes of compiling aircrew's tours.
Sport: Football - Station 2nd XI 5, Barrow 2.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 500 ft at 14.01 1/2 hrs. MANNA mission. P/O R H Digby (P)
Sgt J H Walker (F/Eng)
F/O A E Lewis (Nav)
Sgt A E McLeod (A/B)
Sgt D Crabtree (W/Op)
Sgt J L Perrigo (MU/AG)
Sgt R D Hager (R/AG)

Operation/Target: -/MANNA (03 May 1945 - 03 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
-/MANNA 03 May 1945 03 May 1945 N 27 aircraft took off before midday on another "Manna" mission.

[Ed: The log book of Sgt E Ashley records him flying as W/Op for the P/O J S Percival crew on this MANNA op (to Rotterdam). However, the ORB does not record P/O Percival crew flying this op. It is not possible to determine if the Percival crew was missed off the ORB in error, or if there is an error with a crew identified, in the ORB, as flying but which was not in fact flying. Both the Squadron and Station ORBs record 27 aircraft took off on this op; and 27 aircraft are listed below. The Percival crew is identifed as flying both 2nd and 5th May.]
Station Summary
OPERATIONS: 27 aircraft were detailed for another "MANNA" dropping operation on the same area of Western Holland as previously, dropping 60.453 tons of food and all returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 500 ft at 13.20 hrs. MANNA mission. F/O R G Screen (P)
F/Sgt E M Watkins (MU/AG)
Sgt B T McGee (F/Eng)
Sgt J Carson (Nav)
F/Sgt T W Brown (A/B)
F/Sgt H P Rattenbury (W/Op)
Sgt J J Barry (R/AG)

Operation/Target: Rotterdam/MANNA (05 May 1945 - 05 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Rotterdam/MANNA 05 May 1945 05 May 1945 N 26 aircraft delivered groceries to the Dutch.
Station Summary
OPERATIONS: The postponed "MANNA" dropping operation took place and 26 aircraft dropped 58.214 tons of food on the outskirts of Rotterdam, and all returned without incident.
Sport: Cricket. Two matches Station XI v Grimsby Town and a Station XI v Humber Graving Dock, both in Grimsby, were abandoned owing to rain.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 500 ft at 08.18 hrs. MANNA Mission F/L D J Boydon (P)
Sgt P C Polling (F/Eng)
F/L D C Miller (Nav)
Sgt F P Clarke (A/B)
F/O H S Lodge (W/Op)
F/O S J Braithwaite (MU/AG)
P/O R Askey (R/AG)

Operation/Target: Rotterdam/MANNA (07 May 1945 - 07 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Rotterdam/MANNA 07 May 1945 07 May 1945 N 30 aircraft with crews led by Wing Commander McWatters took off on a "Manna" mission. F/O Handley (K2) on his return flight was able to assist in the rescue of at least three aircrew members of a Fortress which came down in the sea. On sighting this aircraft the W/Op at once turned I.F.F. to "Distress", the aircraft being then practically submerged. Descending to 200 ft the crew of K2 saw an American type dingy and believed they also saw a figure in it; on returning from their orbit, however, the dingy was seen to be upside down and no figure present. A tramp ship was then spotted some 6 or 7 miles south proceeding south away from the wreck. K2 flew over to this ship and signalled to it by Aldis lamp "S.O.S. follow us". The ship replied from the bridge by Aldis lamp and turned round and followed K2 back to the wreck. In the meantime the W/Op had been passing position, time, height details etc on M/F Section "G" and had received in return "Stand By" orders. On arriving back at the wreck the ship lowered a boat. Approximately 2 miles north of the wreck, K2 found airman No. 1 in the water with a parachute floating all around him but apparently without any Mae-West as no yellow harness was visible. A Mae-West was thrown to him by the rear-gunner from the rear turret, which was seen to fall near the airman and which he donned. A flame float was also dropped. By this time, several Fortresses had arrived on the scene and circuits had become somewhat congested. A second airman was then spotted east of the wreck and another Mae-West was dropped to him, and a Red Verey cartridge fired. A Catalina aircraft then arrived on the scene, alighted on the sea and picked up surviver No. 1. A Walrus aircraft also appeared, alighted and picked up airman No. 2. Still circling the area, K2 sighted a second dinghy which appeared empty; however one of the last remaining flame floats was dropped to mark it, also a Mae-West. Almost immediately a third survivier was seen in the water and by means of a red verey light and R/T instructions on "Darkie" frequency, the Catalina aircraft taxied over and effected another rescue. Further search was continued, but as no more survivors were visible and the area was now thoroughtly marked and patrolled, and as two more aircraft were seen approaching with airborne lifeboat and an escorting Spitfire, K2 left the scene and continued her homeward journey, well satisfied with the happy twist in circumstances that had enabled them to assist in the resuce operations, and, at the same time, considerably enlivened what otherwise woulhd have been a somehwat monotonous trip.

[Ed: the ORB lists PA268 "F2" twice on this op; FIRST with the F/Sgt Vance crew and two pages later again with the P/O Percival crew; there is no obvious way to determine what the entry is correct.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned Primary at 500 ft at 14.59 hrs. MANNA Mission

Operation/Target: Brussels/EXODUS (10 May 1945 - 10 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Brussels/EXODUS 10 May 1945 10 May 1945 N 23 aircraft and crews took off at approx 05.30hrs to bring back to this country ex-prisioners of war from Brussels.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned EXODUS F/L H S Grimes (P)
Sgt H L Brown (Nav)
Sgt R A Elliott (A/B)
Sgt A Aitken (W/Op)
Sgt K Higgins (MU/AG)
Sgt B Edwards (R/AG)
F/L K B Wright (F/Eng)

Operation/Target: Brussels/EXODUS (11 May 1945 - 11 May 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Brussels/EXODUS 11 May 1945 11 May 1945 N 25 aircraft and crews took off at approx 15.45hrs for Brussels at very short notice after standing by for the most of the day. Ex-prisoners of war were brought back. Three of our aircraft "R", "A2" and "E2" landed at Westcott with their human cargo, but unable to take off owing to technical trouble.

[Ed: all flights flying with only 6 crew, one or other of the A/Gs being absent].
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD321 Returned EXODUS F/L D J Boydon (P)
Sgt P C Polling (F/Eng)
F/L D C Miller (Nav)
Sgt F P Clarke (A/B)
F/O H S Lodge (W/Op)
P/O R Askey (R/AG)

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 58
MAX Aircraft deployed
in single operation
1
(Calais, 25 Sep 1944)

These details were last updated: 06 March 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.


Return to the top of the page.