Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Caen (18 Jul 1944 - 18 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Caen 18 Jul 1944 18 Jul 1944 N The eighteen aircraft warned yesterday were detailed to attack military strong points in the Caen area in support of the military plans to break through. The Squadron's aiming point was the village of SANNERVILLE where the enermy had concentrations of mortars, long range guns, anti-tank guns, A.A. units, Transport and reserve personnel. Our aircraft arrived over the target just before sunrise at 05.45 hours. Conditions were ideal, visibility being excellent. The markers which were easy to identify in the light of dawn were punctual and accurate with the exception of one dropped 100 yards south. Bombing concentrations weer excellent. Flak was negligible at first but on leaving the target, accurate predicated flak was encountered. The only fighters seen were those of the Spitfire cover. All our crews arrived back safely in time for breakfast feeling highly satisfied with their mornings work.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 8,000 feet at 05.54 hours F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Wizernes (20 Jul 1944 - 20 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wizernes 20 Jul 1944 20 Jul 1944 N Nineteen aircraft andcrews were offered, accepted and briefed for an early evening attach on a target in WIZENEF [Ed. - assumed incorrect spelling, and Wizernes or Wizemes(?) V-bomb site is intended.]. All the aircraft took off successfully in good style and all reached the target which was bombed with the usual precision. Flak opposition at the target was negligible and the only fighters to be seen were, once again, Spitfires. All our aircraft returned safely to base bringing back good photographs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 14,000 ft at 21.00 hours. S/L B J Redmond (P)
F/L O A Hardy (MU/AG)
Sgt J G Hill (W/Op)
Sgt A H Bowers (MU/AG)
Sgt H Moreton (F/Eng)
F/Sgt D M Stephen (Nav)
F/Sgt J H Elliott (A/B)

Operation/Target: Stuttgart (24 Jul 1944 - 24 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 24 Jul 1944 24 Jul 1944 N Fifteen aircraft were laid on to bomb STUTTGART, that take off being as usual without incident. All claimed to have bombed the target successfully although the city was covered by thin cloud the markers could be seen and several fires illuminated the cloud. Several vivid explosions brightened the proceedings. Flak at the target was repoted as being moderate. Several Night Fighters were seen but did not attack, two peeled off when the gunners of "F" (F/O Cann) and "T" (F/O Roche) opened fire.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 18,000 feet at 01.59 hours. Explosion at 02.10 hours. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Stuttgart (25 Jul 1944 - 25 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 25 Jul 1944 25 Jul 1944 N Twelve aircraft and crews were offered for operations and briefed to attack STUTTGART once again. This number was later reduced to seven and these took off in the usual manner, unfortunately two aircraft "N" F/O Thygessen and "D" F/O Hussey were compelled to return one with engine trouble and the other hit by flak near the enemy coast. The target was once again covered by cloud and hence a visual identification was impossible but did not prevent the markers being seen. Vivid explosions were reported late in the attack and fires were reported to have been seen 250 miles away. Opposition from flak was once again reported as being only slight. Seven crews carried out ground training in their respective sections.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 16,000 ft at 02.06 hrs. Large yellow explosions at 02.11hrs. F/O W F Cox (A/B)
F/O M L Dubois (P)
Sgt H Tulip (F/Eng)
F/O J C Young (Nav)
Sgt H Wood (W/Op)
Sgt R Eves (MU/AG)
Sgt L R R Haynes (R/AG)

Operation/Target: Stuttgart (28 Jul 1944 - 28 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 28 Jul 1944 28 Jul 1944 N Eighteen aircraft and crews were offered but only seventeen were accepted for operations. The crews were briefed to attack STUTTGART once again and all successfully took off without incident. All the aircraft claim to have bombed the target area and contrary to the previous raids experienced fairly heavy opposition from the ground defences, Two of our aircraft "O" P/O Jones and "T" F/O Roche failed to return from this mission, two other aircraft failed to reach Base and landed at Woodbridge and Bombrook. In the crew of "O" as Navigator was F/O Dinney who has for several weeks been acting as the Squadron Navigation Leader.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abortive. Landed Binbreck. Gee u/s F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Cahagnes (30 Jul 1944 - 30 Jul 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cahagnes 30 Jul 1944 30 Jul 1944 N The fourteen aircraft and crews which had been accepted for operations were detailed to attach targets behind enemy lines at CAHAGNES in Normandy. All crew members were in high spirits delighted at being able to go on another daylight strafe, and on this mission the Squadron was led by Squadron Commander W/Cdr Sisley. After attacking the target successfully the boys carried out some daring ground straffing from a height of 100 feet, shooting up tanks, rolling stock, and Huns. In fact anything they thought to be of military value to the enemy. No fighters were encountered and flak was negligible.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 3,500 ft at 08.31 hrs F/O G P Fauman (P)
Sgt W J Killick (F/Eng)
F/Sgt A E Stebner (Nav)
F/O M S Merevitz (A/B)
Sgt P E Cooksey (W/Op)
Sgt J A Ringrow (MU/AG)
Sgt W A Drake (R/AG)

Operation/Target: Le Havre (01 Aug 1944 - 02 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Havre 01 Aug 1944 02 Aug 1944 N Yesterday evening the fourteen aircraft which had been offer an accepted took off at about 18.15hrs to attack the dock installations at LE HAVRE. The compact dock area was unmistakably clear to the Bomb Aimers and pin-pointing was even easier than on the dusk operation six weeks ago. The fighter cover prevented any molestation by the Luftwaffe though ground opposition was spirited at most stages of the attack, and "P" (S/L MacAleavey) was slightly damaged by Flak which varied during the attack from slight to intense. The photographs obtained were some of the best ever achieved and all were easily plottable. One of our crews reports that a "U" boat was seen to received a direct hit causing it to settle at an angle in the water. In addition to the operational sorties one of our new crews carried out a cross country in a "Y" aircraft, having with them as instructors F/L Gardiner.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 13,400 ft at 20.02 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Belle Croix les Bruyers (02 Aug 1944 - 02 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Belle Croix les Bruyers 02 Aug 1944 02 Aug 1944 N Once again an evening attack and fifteen aircraft and crews were offered but only eleven required. The crews were briefed to attack military objectives at BELLE CROIX LES BRUYERS, this the Squadron's second daylight sortie in as many days was very disappointing to the boys, as owning to 10/10 cloud it was not possible to attack with sufficient accuracy and the Master Bomber called the party off. A further fifteen aircraft and crews were required for operations during the afternoon but were informed that it would again be an evening attack.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abortive 10/10 cloud, mission abandoned on instructions of Master Bomber

Operation/Target: Trossy St Maximim (03 Aug 1944 - 03 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Trossy St Maximim 03 Aug 1944 03 Aug 1944 N Shortly before lunch a striking force of twelve aircraft took off in as a many minutes to attached a Flying Bomb site at TROSSY ST MAXIMIM, the Squadron being led by the Station Commander Group Captain McIntyre D.F.C and all the aircraft carried 15,000 lbs of H.E. which is a new record load devised by the Armoury. No fighters were seen over the Channel but covering Spitfires were well in evidence on reaching the French Coast. Accurate bursts of Flak were encountered during the trip and "V" (F/O Fauman) came back with a small shrapnel hole in the fuselage. Low cloud persisted over France but there were many large gaps, through which craters would be seen, evidence of previous attacks on other Bomb Sites.
Our 12 aircraft released there 80 tons of bombs within 1 1/2 minutres and most of the photographs confirm that a very large proportion of the bombs landed "plumb on" the target. The particularly fine photograph of "F" (P/O Shaw) was enlarged and forwarded to the C in C and shows the dense profusion of bursts 2 minutes after the attack opened.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 13,000 feet at 14.16 1/2 hours.

[Ed. Station CO McIntyre pilot]
G/C R V McIntyre (P)
F/O H G Manley (P)
Sgt D R Hughes (F/Eng)
F/O R G George (Nav)
F/Sgt R Hill (A/B)
F/O G T Brown (W/Op)
Sgt G B Ward (MU/AG)
P/O J K McDonald (R/AG)

Operation/Target: Le Havre (03 Aug 1944 - 03 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Havre 03 Aug 1944 03 Aug 1944 N The fifteen aircraft took off again without incident to attack targets in the port area of LE HAVRE, as in spite of the previous concentrated bombing the "U" boat seen before seems to have borne a charmed life and had apparantly been towed to another part of the docks and this with other shipping was our target. The fifteen aircraft, after climbing through cloud had a perfect run down over England in blazing sunshine. Weather at Le Havre was clear and with good visiblity and all the Bomb Aimers were able to identify the aiming point visually. Very good bombing was accomplished on this raid and the good photographs brought back confirm this. No enemy fighters were seen and the only fly in the ointment was accurate flak which was not so intense as during the previous raid. A burst uncomfortably near made several sears on "K" (F/O Steele) but the Pin up girl on the aircraft was unmarked.
All our aircraft returned safely and touched down in the neighbourhood of 20.30 hours just in t ime for the crews to receive some well earned refreshment.
When the aircraft had been evacuated by the crews they were taken over by the hard working ground staff who worked far into the night and in some cases all through the night, to service and bomb up once again.

Shortly before lunch a striking force of twelve aircraft took off in as a many minutes to attached a Flying Bomb site at TROSSY ST MAXIMIM, the Squadron being led by the Station Commander Group Captain McIntyre D.F.C and all the aircraft carried 15,000 lbs of H.E. which is a new record load devised by the Armoury. No fighters were seen over the Channel but covering Spitfires were well in evidence on reaching the French Coast. Accurate bursts of Flak were encountered during the trip and "V" (F/O Fauman) came back with a small shrapnel hole in the fuselage. Low cloud persisted over France but there were many large gaps, through which craters would be seen, evidence of previous attacks on other Bomb Sites.
Our 12 aircraft released there 80 tons of bombs within 1 1/2 minutres and most of the photographs confirm that a very large proportion of the bombs landed "plumb on" the target. The particularly fine photograph of "F" (P/O Shaw was enlarged and forwarded to the C in C and shows the dense profusion of bursts 2 minutes after the attack opened.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 14,000 ft at 19.04 hrs.

Operation/Target: Pauillac (04 Aug 1944 - 04 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pauillac 04 Aug 1944 04 Aug 1944 N Twelve aircraft were offered and accepted and briefed to attack oil stores at PAUILLAC near Bordeaux where lies stores of oil for the enemy's "U" and "E" boats, the Squadron this time being lead by the Squadron Commander, Wing Commander Sisley. One aircraft "R" returned early due to engine trouble, and the remaining eleven completed one of the most delectable pieces of cake which has ever come the way of our maids of all work. Provided with fighter cover, our crews found no opposition in their long journey. The weather over the target was clear with some ground haze and the markers which most crews bombed visually went down puntually and on the bullseye. The pinpointing was somewhat hampered in the latter stages by a pall of oily smoke which rose to over 8,000 ft and the Master Bomber raised the bombing height for later arrivals to avoid the smoke.
News was received that F/O Taylor has been awarded the Distinguished Flying Cross for his trip on the 7th July when his aircraft was hit by bombs over Caen.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abortive - starboard outer u/s.

Operation/Target: Pauillac (05 Aug 1944 - 05 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pauillac 05 Aug 1944 05 Aug 1944 N Fourteen aircraft and crews were required, provided and briefed to attack oil depots at PAUILLAC a few miles south of the previous days attack.
All of the aircraft took off successfully with most of the crews in their shirt sleeves. Formation flying which has been practiced by the Squadron stood them in good stead and all the aircraft kept togther as far as the target, with S/L Redmond's section all the way home as well. The weather at the target was cloudy but the markers were accurately placed and all our aircraft planted their bombs on and around the aiming point. A huge fire was soon started and gradually enveloped the whole target with a particularly large explosion occurring at 19.10 hours. Excellent photographs were obtained by our crews and P.R.U. whol following close on their heels reported that severe damage was done in the attack.
The route and target was trouble free from Flak and fighters while our fighter cover was comfortingly noticeable. All our aircraft returned safely though owing to fog conditions at base all landed at Sandtoft, with the exception of "H" which landed at Skellingthorpe.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 8,000 ft at 19.04 1/2 hrs.

Operation/Target: Fontenay (08 Aug 1944 - 08 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Fontenay 08 Aug 1944 08 Aug 1944 N The seventeen aircraft took off in the evening to carry our an attack on enemy troop concentrations at FONTENAY in the Caen sector. Haze at the target limited visibility, markers, aided by the ground forces, were generally good, but in the latter stages were obscured by smoke dust and haze. The Master Bomber accordingly felt compelled to order sorties who had not yet bombed to take their bombs home again, five very disappointed crews of this Squadron did this, but the remainder had bombed. Flak was negligable and as no photographs were taken on this trip it was left to P.R.U. to confirm the concentation was amongst the best of the night.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 6,500 ft at 23.22 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Duigny (10 Aug 1944 - 10 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duigny 10 Aug 1944 10 Aug 1944 N Twenty aircraft were offered, accepted and briefed for operations again an oil storage depot at DUIGNY. The target was reached and bombed in clear weather, which was heavily defended by accurate predicted Flak, which scarred several of our aircraft and caused two slight casualties F/O Dubois "H" was hit in the neck by shrapnel and in spite of severe pain and loss of blood safely brought the aircraft back to base. F/S Francis (A/B of "V") also sustained a slight wound in his leg whilst over the target. F/O Shaw "F" when outward bound lost the use of one of his engines and reached the target about 9,000 ft below the bomber stream. He successfully bombed his target and was escorted home by five Spitfires. "F" attracted the attention of numberous Flak batteries but reached base safely. Photographs were once again of excellent quality.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 16,000 ft at 12.00 1/2 hrs.

Operation/Target: Douai (11 Aug 1944 - 11 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Douai 11 Aug 1944 11 Aug 1944 N Sixteen aircraft and crews were provided and briefed for an attack on DOUAI. Nearing the taget some 6/10-7/10 cloud was encountered and with the markers being a few minutes late the leading aircraft found some difficulty in locating the target with the result that they bombed the marshalling yards at CAMBRAI. Immediately after this the markers were seen to go down over DOUAI and were very accurately placed. Both targets were well and truly bombed as the photographs show. Flak and fighters were once again conspicious by their absence.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Cambrai 16,000 ft at 16.13 hrs. F/O W D Robertson (A/B)
F/O V A Thygessen (P)
Sgt R Finlay (F/Eng)
F/O E C Packham (Nav)
Sgt A Pavlovitch (W/Op)
Sgt A E Howting (MU/AG)
F/O H B Parker (R/AG)

Operation/Target: Bordeaux (12 Aug 1944 - 12 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bordeaux 12 Aug 1944 12 Aug 1944 N Six aircraft were required for an attack on oil storage tanks at BORDEAUX and all took off on their long trip in almost perfect weather and the target area was clearly seen. Accurate flak was encountered over the target and "A" (F/O Purvis) was hit before bombing, rendering two engines unserviceable and the controls to the third would not function. Owing to this loss of power the aircraft fell out of control from 10,000 ft to 1,500 ft, when F/O Purvis regained control. On the return journey the bombs were manually released and the Flight Engineer (Sgt Leary) who was wounded gave valuable assistance to his Captain, who was nursing the aircraft back on one and a half engines. A crash landing was made at Bolt Mead and due to the unserviceable flaps and brakes the aircraft overshot coming to rest against a thick stone wall. Photographs show that the target "has had it".

[Ed: F/O Purvis received an immediate Distinguished Flying Cross for his actions.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 9,000 ft at 15.13 hrs.

Operation/Target: Le Coulot (15 Aug 1944 - 15 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Coulot 15 Aug 1944 15 Aug 1944 N Eighteen aircraft and crews were again offered for operations, seventeen finally taking off to attack a Luftwaffe night fighter base ay LE COULOT near Louvain in Belgium which is the most distant daylight target so far tackled. Good weather prevailed and all the aircraft identified the spot without difficulty and gave it its desserts. The runways were pleatered and the and the technical and administrative buildings got their share of a very successful prang. Flak was dispirited in most stages of the attack but the only fighters seen were those of our own cover. Good photographs were once again obtained.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 14,000 feet at 12.03 hours.

Operation/Target: Stettin (17 Aug 1944 - 17 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stettin 17 Aug 1944 17 Aug 1944 N The fourteen aircraft and crews which had been accepted and briefed to attack targets at STETTIN which was the first time this month the Squadron went to Germany by night. Weather at the target had been 10/10 cloud in layers up to 17,000 feet prior to the attack commencing. But several crews report clear patches just before reaching the city. There were two main fire areas which were seen by our crews when several miles on the homeward journey.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 18,500 feet at 01.11 hours. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)
Sgt G L Grant (F/Eng)

Operation/Target: Ghent Terneuzen (19 Aug 1944 - 20 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ghent Terneuzen 19 Aug 1944 20 Aug 1944 N Just before "The Lone Ranger" touched down the remaining thirteen aircraft had taken off on yet another oil raid. This time to GHENT TERNEUZEN in Belgium. Weather over the target was clear and most of our crews identified the markers easily and there is very indication that they did their job well. Once again the Luftwaffe did not interfere and flak at the target was described as nil to negligible, and all our aircraft once again returned to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 11,000 feet at 00.08 hours

Operation/Target: Russelheim (25 Aug 1944 - 26 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Russelheim 25 Aug 1944 26 Aug 1944 N Sixteen aircraft and crews were offered and accepted for operations but were warned to stand by for a night attack. All the aircraft originally detailed took off to attack targets in RUSSELHEIM, the sixteenth being cancelled owing to the starboard outer engine being unserviceable on W5005 "N". No fewer than five new Captains were on this trip as second pilots. News was also received late in the day of the awards of the DFC to P/O Purvis for his part in the raid on 12 Aug 1944 and to F/O Dubois for his trip on the 10th Aug.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 18,000 ft at 01.00 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
F/O G S Devereau (P)

Operation/Target: Kiel (26 Aug 1944 - 27 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kiel 26 Aug 1944 27 Aug 1944 N Eighteen aircraft and crews were offered and accepted for operations and were briefed to attack KIEL. After a first class takeoff at 21.00hrs the crews enjoyed good weather en-route to the target, but on the return journey a severe electrical storm was encountered. All crews returned safely although F/S Hopman and crew in "N" ditched in the River Humber whilst preparing to land, but were none the worse for this ducking.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 19,000 feet at 23.14 hrs.

Operation/Target: Wemars-Cappel (28 Aug 1944 - 28 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wemars-Cappel 28 Aug 1944 28 Aug 1944 N Ten aircraft and crews were detailed to attach a buzz-bomb sight ay WEMARS-CAPPEL in daylight. It is greatly regretted to have to put on record the loss of S/L K MacAleavey the "A" Flight Commander, who was also a member of the crew of "E". S/L K MacAleavey was a very popular Flight Commander and a well known member of the Navigation Union.

[Ed: in fact S/L MacAleavey survived the crash to become a POW. See below under PA991.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 10,000 feet at 19.55 hours. F/O W D Robertson (A/B)
F/O V A Thygessen (P)
Sgt R Finlay (F/Eng)
F/O E C Packham (Nav)
Sgt A Pavlovitch (W/Op)
Sgt A E Howting (MU/AG)
F/O H B Parker (R/AG)

Operation/Target: Stettin (29 Aug 1944 - 30 Aug 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stettin 29 Aug 1944 30 Aug 1944 N Sixteen aircraft with crews were accepted briefed and took off at 21.00hrs to attack STETTIN. One aircraft "C" W/O Ansell and crew are missing from the Operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 18,000 ft at 02.04 1/2 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Agenville (31 Aug 1944 - 01 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Agenville 31 Aug 1944 01 Sep 1944 N Twelve aircraft were detailed for a daylight operation at 13.05hrs, a flying bomb sight at AGENVILLE. To add to confusion there was quite a lot of heavy and accurate flak though no other opposition. This attack was considered a great success by the crews that took part. One aircraft "V" with W/Cdr AFM Sisley and P/O Siddall and crew is missing from this Operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 11,000 ft at 15.33 1/2 hrs. F/O H G Manley (P)
Sgt D R Hughes (F/Eng)
F/O R G George (Nav)
F/Sgt R Hill (A/B)
F/O G T Brown (W/Op)
Sgt G B Ward (MU/AG)
P/O J K McDonald (R/AG)

Operation/Target: Gilze-Rijen (03 Sep 1944 - 03 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Gilze-Rijen 03 Sep 1944 03 Sep 1944 N Thirteen aircraft and crews were detailed for a daylight operation on the aerodrome of GILZEREGEN. They all took off successfully, though "A" piloted by F/O R.Purvis aborted with the ASI unserviceable. Take off time was at 15.50hrs. It started to rain at Base just before take off and the weather was generally bad. The height to fly at was 12000 ft but there cloud at this height which consisted mainly of 10/10th strata cumulus. Some crews flew above this cloud and others below as there was pretty severe icing in it. Over the target itself the cloud broke to 4/10ths str. cum. with tops about 6000 ft. There was very little opposition of any sort, no fighter and slight flak. The PFF dropped their markers "bang on" and the bombing was well concentrated. From the bombing photographs the aerodrome and runways seem very hard hit. On the return journey aircraft ran into cloud about 60 miles from the English coast which cleared for about 100 miles and the closed in again. Most of the crews seem to have flown back from Nottingham at about 1000 ft to avoid low cloud. The weather back at Base was very bad indeed with rain and bad visibility combined with low cloud. "J" piloted by P/O McCarthy came back with the starboard inner engine feathered; this was was to save the engine which was running very badly. All aircraft landed back at Base safely.
Station Summary
OPERATIONS
Two days of preparation bore fruit with the despatch of 13 aircraft (part of a Group force of 30) to raid the GILZE-RIJEN airfield in Holland. 1 aircraft abandoned its mission due to technical trouble. The remainded returned to base claiming to have attacked the primary target. Before they took off at about 1600 hours news had been received that there would be no further targets for today and tonight.
GENERAL
A United Voluntary Service for the National Day of Prayer was held in the Station Church, Padre Croft of R.A.F. Station Elsham Wolds taking the service. It was well attended by Station Personnal, considering there was an operaitonal take off at the same time.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 14,000 feet at 17.33 1/2 hrs. F/O H G Manley (P)
Sgt D R Hughes (F/Eng)
F/O R G George (Nav)
F/Sgt R Hill (A/B)
F/O G T Brown (W/Op)
Sgt G B Ward (MU/AG)
P/O J K McDonald (R/AG)

Operation/Target: Le Havre (05 Sep 1944 - 06 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Havre 05 Sep 1944 06 Sep 1944 N 16 Aircraft and crews were detailed and briefed to attack the enemy who are still holding out at Le Havre. In addition one aircraft with crew who were also briefed stood by as the Base Reserve but was not called upon. The operation was spread over several hours in two attacks in all 300 aircraft took part. Although the weather forecast had been reported as "sticky", it was better than anticipated. Very careful preparations for bombing this small area of approximately 1000 yards square had been made; luckily there was no cloud over the target and the master bomber had ordered the main force to orbit once to obtain a good view of the target area, a very concentrated attack took place.
Station Summary
OPERATIONS
Sixteen aircraft of No. 550 Squadron took part in a daylight attack on the German garrison holding out in LE HAVRE. All claim to have bombed the primary target and returned safely to base.
GENERAL
A team consisting of 2 Officers and 8 O.R's competed for Headquarters No. 1 Group Rifle Competition. Score 684 points out of a possible 850.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 12,000 feet at 18.23 1/2 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Le Havre (06 Sep 1944 - 07 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Havre 06 Sep 1944 07 Sep 1944 N 15 aircraft and crews were detailed once again to attack troop concentrations to the north east of the town of LE HAVRE where Hun suicide regiments were still holding out and who had not felt the weight of our bombs the evening before. The aircraft took off to time in usual 550 Squadron style. "J" F/O Rose returned early owing to RAE compressor being unserviceable. The weather enroute was fairly good with 10/10 thin cloud at the target, this did not however prevent our bomb aimers from clearly identifying the aiming point.
Station Summary
OPERATIONS
Once agan No. 550 Squadron took part in a daylight attack on LE HAVRE. Fifteen aircraft took off as part of a Command force of 290. 1 abandoned its mission due to a U/S bombsite. All returned safely to Base.
ORGANISATION
M.T. Fitters sent on 2 weeks tyre course.
Snow plough collected in readiness for coming Winter.
GENERAL
Lecture given by S/Ldr Cameron [Ed: of the R.A.F. Regiment] on "Prisoners of War" proved of great interest, being well attended by both the WAAF and Airmen.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 6000 ft at 09:21 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Le Havre (08 Sep 1944 - 08 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Le Havre 08 Sep 1944 08 Sep 1944 N 15 aircraft were detailed to attack the Huns who were still holding out on the Northern outskirts of LE HAVRE. Unfortunately had visibility over the prevented the bombing being carried out. Owing to the close proximity of our own troops precision bombing was essential and rather than strafe our own troops the Master Bomber called off the attack. "K" F/Lt Steele who had been orbiting the area for 15 minutes pressed down regardless and from 2000 ft released his bombs on the target, the bursting bombs rocked the aircraft considerably, the remaining aircraft brought their bombs back. "A"/ F/O Purvis returned early owing to the bombsight being unserviceable. A spectacular and skilfull landing was made by "V" F/O Devereau on one wheel, the other wheel puncturing on landing. The pilot managed to keep the aircraft on an even keel until speed was reduced. The "V" swung to starboard and slewed round blocking the runway. The Flare Path personnel quickly changed the runway which was soon in action, but not for long. "C" F/O Dodds, on landing overshot and in consequence "E" F/O McCarthy had to be sent to Elsham Wolds to land.
Station Summary
OPERATIONS
The early morning operation was once again on the German garrison at LE HAVRE. Fifteen aircraft took off about 0700 hours and apart from 1 aircraft which lost height and bombed on clear visual identification, all brought their bombs back on the instructions of the Master Bomber, who called off the attack due to cloud.
ORGANISATION
Flying Control had proved the asset of having three runways today. On return from OPERATIONS one aircraft burst a tyre on landing necessitating the diversion of other aircraft to No. 2 runway. A second aircraft overshot on this runway and became bogged, so the third runway had to be brought into use to land the remainder of the aircraft.
GENERAL
Crash Crew called out to Mustang from GOXHILL which crashed at WOOTEN but were not called upon to operate on arrival.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abandoned on instructions of master bomber F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Frankfurt (12 Sep 1944 - 12 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Frankfurt 12 Sep 1944 12 Sep 1944 N 19 aircraft and crews were detailed to attack the FRANKFURT. 15 aircraft bombed the primary target, 3 returned early. F/O Hussey "Gee" unserviceable, F/O Abrams Air Speed Indicator unserviceable, F/O Rose compressor unserviceable. The weather conditions were good. On approach to the target area the extensive Mannhein - Mainz Frankfurt searchlight belt was seen to be in full swing and several aircraft were coned and subjected to intense FLAK. P/O Ansell in the veteran aircraft "B" was one of these, for just after bombing he received the full attention of a searchlight cone and intense flak and after having successfully emerged through this with minor damage was attacked three times by a fighter ME109. Fire was exchanged and further damage sustained. The bombing attack, from reports, appears to have been a complete success. The marking was both punctual, concentrated and clearly seen. Fires were burning well and soon merged into one mass of flames and smoke like a boiling cauldron and could be seen a 100 miles distance on the homeward journey. FLAK in the target area was described moderate in a loose barrage, the homeward journey was quiet and uneventfull. All aircraft and crews returned safely. P/O Purvis, DFC and his crew completed their first operational tour. PRU were over FRANKFURT quicker than ever after the raid and they report as follows: "The whole area around the main marshalling yard on the west side of the city is covered with smoke from numerous fires. A large area NW of the marshalling yard is seen to be almost completely gutted. A considerable quantity of rolling stock is burning in the yard. The area between the M/Y and the lines leading west from the main railway station is now almost completed devastated". Another excellent prang.
Station Summary
OPERATIONS
After some respite from German targets, 550 was once again detailed, as part of a force of 185 from Command, to attack FRANKFURT tonight. Shortly after 1800 hours 19 of our aircraft took off. 15 claim to have attacked the primary. 1 attacked a German last-resort target and 3 returned early, having abandoned their mission because of technical troubles. Apart from one aircraft which landed at CARNABY because of a U/S compressor all our sorties returned safely to base.
ORGANISATION
F/Lt Lord, Base Gas and Fire Officer visited Gas and Fire Section and found everything satisfactory.
GENERAL
The 3rd, 13 Base Junion N.C.O's Discip. & Admin Course commened at this Station.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 16,000 ft at 23.00 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Steenwijk (16 Sep 1944 - 17 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Steenwijk 16 Sep 1944 17 Sep 1944 N 20 aircraft and crews, briefed and took off without incident to attack STEENWIJK airfield. The entire absence of opposition of any kind at the target and the darkness of the night was described by some of the crews as being eerie. From reports so far gathered the attack was reasonsably successful. All aircraft retruned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 13,500 ft at 23.45 1/2 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Sandgatte (20 Sep 1944 - 20 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Sandgatte 20 Sep 1944 20 Sep 1944 N 14 aircraft and crews were briefed and took off to attack enemy defences at SANDGATTE. The operation is considered as having been successfull and with this operation the Squadron scored its first century of operations. In just over eight months 550 has completed its hundredth operation from North Killingholme. Coming as a fledging from Waltham where it was hatched, the Squadron began to lay on 14th January, when 8 sorties dropped 38 tons of NE on Brunswik. Stettin and Berlin had been visited from Waltham.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 9500 ft at 17.05 1/2 hrs.

Operation/Target: Neuss (23 Sep 1944 - 23 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Neuss 23 Sep 1944 23 Sep 1944 N At 10.55hrs the Squadron was informed that no operations would take place today, but the aircraft were to be bombed up ready for an early morning mission. As 12.20hrs information was received that the Squadron may be called upon tonight. At 13.30hrs informed that the Squadron would definitely operate tonight. 21 aircraft and crew were detailed, briefed and took off to attack Military objectives at NEUSS approximately 4 miles SW of Dusseldorf. 20 aircraft bombed the primary target, F/O Lord returned early owning to "GEE" being unserviceable. 10/10ths cloud over the target the results of the bombing could not be observed. All returned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 17,800 ft at 21.23 1/2 hrs. F/L J Harris (P)
Sgt I S Freeman (F/Eng)
F/O E B Hornsby (Nav)
F/Sgt R W Richardson (A/B)
F/Sgt P F Flux (W/Op)
F/Sgt W H Barrett (MU/AG)
Sgt W A Bentley (R/AG)

Operation/Target: Calais (25 Sep 1944 - 25 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 25 Sep 1944 25 Sep 1944 N 25 aircraft and crews detailed, briefed and took off to blast the Hun out of Calais, precision bombing was called for owning to the close proximity of Allied troops The weather conditions were bad over the target and the Master Bomber ordered all aircraft to return to base with their bombs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abandoned on instructions of Master Bomber

Operation/Target: Calais (26 Sep 1944 - 26 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 26 Sep 1944 26 Sep 1944 N 24 aircraft and crews again detailed, briefed and took off to blast the Hun who are still holding out of Calais. This time the weather was good enough to permit precision bombing which was successfully applied.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 3000 at 12.29 hrs.

Operation/Target: Calais (27 Sep 1944 - 27 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 27 Sep 1944 27 Sep 1944 N 17 aircraft and crews took off for Calais early this morning once again to bomb the Hun into submission. The weather was good and the bombing results were excellent.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 5000 at 10.14 hrs. F/Sgt T T Savas (A/B)
F/Sgt G B Smith (P)
Sgt V J Williams (F/Eng)
Sgt M L Tretheway (Nav)
F/O W K Mills (W/Op)
Sgt C J Cassan (MU/AG)
Sgt R G Colban (R/AG)

Operation/Target: Saarbrucken (05 Oct 1944 - 06 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Saarbrucken 05 Oct 1944 06 Oct 1944 N 27 aircraft with crew were briefed and took-off at 18.22hrs to attack military objectives in SAARBRUCKEN. "F" (F/Lt Shaw) and "A" (S/Ldr Misselbrock) returned early, the former owing to "Gee" being unserviceable and the latter with the Captain sick. The remainder of the force, after flying through some rather dirty weather over England, found the target area almost clear with only ground base or thin cloud to prevent excellent visibility. The marking was punctual and well placed. In addition to a large and apparently concentrated mass of incendiaries with fires taking a good hold, the chief show piece of the evening was a truely tremendous explosion, so great that every crew unanimously noted the time as 22.46 hours, with a sheet of orange flame many hundreas of feet in the air, and smoke rising to 8000 to 10,000 ft. It would appear that the Hun will have several rounds less to fire at our Allies of the 3rd American Army. Flak was described as being moderate. Enemy night fighters were conspicuous by their absence. Photos taken show a mass of incendiary and fire traps, but unfortunately no ground detail. Visibility deteriorated rapdily at base and the aircraft, all of which returned safely, were diverted to Norfolk. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 15500 ft at 22.28 hrs

Operation/Target: Duisburg (14 Oct 1944 - 15 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 15 Oct 1944 N There was no respite for the Squadron for a further 25 aircraft and crews were required, provided and briefed to attack once again Duisburg the scene of their early morning visit. All our aircraft returned safely from this operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 20,000 ft at 01.31 hrs F/O G W Bell (P)
Sgt R J McElroy (F/Eng)
F/O D C R Hills (Nav)
F/O B H Lowen (A/B)
Sgt J F Noonan (W/Op)
Sgt D E Hookham (MU/AG)
Sgt R West (R/AG)

Operation/Target: Duisburg (14 Oct 1944 - 14 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 14 Oct 1944 N 25 aircraft and crews were briefed to attack the large steelworks of August Thysson at Duisburg, the world largest inland port. 24 aircraft took off without incident at approx 06.30hrs to make their way through layer cloud which broke before the Rhiner but closed in again over the target and only the crew of "H" (F/O Bond) claim to have bombed the ground markers. "N" (F/S Hopman), "A2" (S/L Gainsford) and "E2" (F/O Stevenson) claim to have bombed their objectives on Navigational aids, the others endeavoured to obey the Master Bombers instruction to bomb any built up area they could see in the vicinity of the target. Several crews reported that the Thyssen works were identified and in flames and one crew reported having observed the demolition of a Rhine bridge. At least one good photograph was obtained by "C2" (F/O John) showing a carpet of bomb bursts on the Steelworks which has been enlarged and forwarded to the C in C for his inspection.
F/O Abrams and F/O Dodds and their crews failed to return from this daylight raid in which approximately 1000 heavy aircraft with fighter cover took part.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 19,000 ft at 08.45 hrs. F/O G W Bell (P)
Sgt R J McElroy (F/Eng)
F/O D C R Hills (Nav)
F/O B H Lowen (A/B)
Sgt J F Noonan (W/Op)
Sgt D E Hookham (MU/AG)
Sgt R West (R/AG)

Operation/Target: Stuttgart (19 Oct 1944 - 20 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 19 Oct 1944 20 Oct 1944 N Twenty six aircraft with crews were offered and twenty five were accepted, plus one aircraft to act as stand-by in the Base. The crews were briefed and took off at 16.50hrs at attack STUTTGART. Twenty took off at this time and the remaining five at 21.30hrs to attack Stuttgart, in two waves. One aircraft was cancelled at the last moment and one aircraft returned early with engine trouble, so in all only 24 aircraft proceeded to the target, one of which, it is regretted, failed to return. F/L Thomas and crew, who had only been with the Squadron a short time and were on their first operational sortie. Moderately cloudy conditions were encountered en route, but over the target 9/10 thick cloud was present and sky marking had to be resorted to. Six crews found momentary gaps to bomb ground markers. Very few results could be seen, only a vague incendiary and fire glow being visible under the cloud. Flak was reported as slight to moderate with some ineffective searchlights. "A" (F/O Young) received some unpleasant attention and was well peppered by flak receiving damage in the tail plane, fuselage, flaps punctured, hydraulics and bomb container. "K" (F/O Daniels) also found Karlsruhe defences awake and received damage to the port wing, fuselage and a punctured tyre. Both aircraft landed safely at Base without casualty. All photographs show cloud and damage cannot be assessed. In additions to operational flying a training programme consisting of Air to Air firing, Air to Sea firing, practice bombing, Fighter affiliation and "Y" Night cross country exercises were carried out.

[Ed: some of the up and down times (and bomb delivery times at primary target) are wildly different (PB514, JB345, EE139, ME301) from the remainder of the aircraft. In the case of ME301 bomb delivery is only 30mins after take-off and 3 hours earlier than any other aircraft.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 16,000 feet at 20.32 hours

Operation/Target: Essen (23 Oct 1944 - 23 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 23 Oct 1944 23 Oct 1944 N 26 aircraft with crews were offered for operations and were briefed at 14.15hrs, with one crew acting as Squadron stand-by. Twenty-five aircraft took off at 16.15hrs to form part of a 1000 aircraft attack on ESSEN. Twenty-four succeeded in bombing the primary target and one aircraft returned early. Opposition encountered was considered moderate and the weather was reasonably good, all aircraft returned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 19,000 feet at 19.50 hours

Operation/Target: Essen (25 Oct 1944 - 25 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 25 Oct 1944 25 Oct 1944 N 27 aircraft with crews were offered, accepted and briefed to attack once again objectives in ESSEN. The take-off was as usual good and without incident. The Station Commander, Group Captain R V McIntyre D.F.C captained "R" and like the remainder of the crews enjoyed the trip. Opposition over the target area was negligible but a fair number of jet-propelled fighters were seen high over the attackers, but no attempt was made to interfere with the bombing and all our aircraft returned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 18,000 feet at 15.43 hours

[Station CO McIntyre pilot]
G/C R V McIntyre (P)
F/O R P Franklyn (P)
Sgt S Dennis (F/Eng)
F/Sgt R H Lucas (Nav)
F/Sgt J A Dibley (A/B)
F/Sgt R J Chester (W/Op)
Sgt K Sharp (MU/AG)
Sgt P J James (R/AG)

Operation/Target: Walcheren (29 Oct 1944 - 29 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Walcheren 29 Oct 1944 29 Oct 1944 N 30 aircraft and crews were again offered for operations, but only eight were accepted for another daylight attack on the gun enplacements off the island of WALCHEREN at Domburg. No opposition was experienced and the target was successfully bombed, and all our aircraft returned without incident. This is considered to have been the Squadrons easiest operation since its inception. In addition to operations 13 1/2 hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 7500 ft at 13.20 hrs.

Operation/Target: Cologne (30 Oct 1944 - 30 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 30 Oct 1944 30 Oct 1944 N Twenty-six aircraft and crews were offered for operations, but only twenty three were required and these took off at approximately 17.30hrs to attack military objectives in COLOGNE. All but one bombed their primary targets, "Q" (F/O Allen) having to return early with his port outer engine unserviceable. The attack is considered by all crews to have been most successful.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 18,000 ft at 21.03 hrs.

Operation/Target: Dusseldorf (02 Nov 1944 - 03 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dusseldorf 02 Nov 1944 03 Nov 1944 N Twenty seven aircraft and crews took off at approximately 16.00hrs to attack DUSSELDORF the leading commercial city of Western Germany and has exceptionaly good transport facilities both by railway and river. As a supply and concentration base for the Western Wall (Rhineland edition) it is therefore an excellent centre to eliminate. Enroute to the target the weather was good but cloudy which however cleared at 0500, leaving the target clear with bright moonlight and good visibility. Ground markers were punctual and clearly visible, placed accurately in the Marsalling yards area and very quickly a concentrated cloud of bomb smoke developed. This was added to in the later stages of the attack by the incendiary aircraft and the crews were enthusiastic about the fires which quickly took hold and emitted a rosy glow seen for almost 100 miles on the return journy. In addition light explosions were observed. Flak was reported as light at first in a barrage later increasing to intense. Night fighters also put in an appearance, all our Air gunners were on the qui vive and successfully beat off any interference from them. Photographs taken and brought back show extensive fire tracks and enthusisatic verbal reports from the aircrews show that the attack should be yet another outstanding success. It is regretted that F/Lt Foster and crew failed to return to base, nothing being heard of them since take-off. Congratualtions were extended to F/L Rose and crew on completing an excellent tour.

[Ed: see also the 4th Nov entry below, which refers to the 100th op of ED905 with F/Lt Shaw at the controls. But in fact it appears likely that 100th op occurred today 2nd Nov. rather than 4th Nov. Full details and supporting evidence in the 4th Nov entry below.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 19,500 ft at 19.22 hours

Operation/Target: Bochum (04 Nov 1944 - 04 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bochum 04 Nov 1944 04 Nov 1944 N Twenty six aircraft and crews took off at approximately 17.15hrs to attack BOCHUM in the heart of the Ruhr. Aircraft "G2" (F/O Kennedy) soon after take-off found that his hydraulics were u/s and his wheels would not retract completely; thwarted in his efforts to jettison he made a successful landing at Woodbridge with all his bomb load on board. "E2" (F/O Marriott) found that the rear turret of his aircraft was u/s with an oil leak and abandoned. The remainder found 9/10 cloud en route, but over the channel this decreased and gradually cleared. The target was free from cloud, but a certain amount of industrial haze was present. Markers were punctual and fairly accurate, the target area was kept continuously marked and the bombing was well concentrated, After the incendiary attack developed, the whole area rapidly became a mass of fire, visible for approximately 100 miles and there were a number of impressive explosions. The ground defences in the target area were reported as moderate, occasionally becoming intense, with many searchlights in evidence exposing on cone of about 20 or more, there latter were at first ineffective, but later became more troublesome, several aircraft being coned. Hun night fighters made a strong reaction and figher flares were seen from the Dutch coast onwards. Many combats took place in which the following aircraft of 550 Squadron were involved, "B2" (F/O Whynacht) had 4 encounters and claims to have destroyed 2 aircraft and damaged another, whilst the other was inconclusive. All these appeared to be jet-propelled aircraft. No damage or casualties were received. "M" (F/O McCarthy) and "P" (P/O Franklyn (R)) both opened fire on two jet planes but no claims were made and the encounters were inconclusive. "V" (F/O Blackler) claims to have shot down an aircraft believed to be a jet propelled unit. The appearance of jet propelled and other rocket phenomena is only of recent origin, and these claims are being further investigated, meanwhile these claims are accepted with reserve. All our aircraft returned to Base with the exception of "F" (F/O Ansell) who landed at Manston having received damage to his aircraft from Flak, the F/Eng (F/S Sythes) receiving wounds in the thigh. Photographs brought back show extensive fire tracks. Aircraft "F" completed her 100th operational sortie, a fact that F/L Shaw is very proud of, since he has completed the major part of his tour in this aircraft.

P.R.U cover now confirms the great damage done in this attack - the two main factories of first priority importance, with extensive blast furnaces, steel works and rolling mills all making armaments have suffered severely; of the six main buildings of one of them all are extensively damaged. A third factory (adjoining the main passenger station which is heavily damaged) manufacturing, milling and grinding machinery is still smoking and damage appears to be heavy. Destruction of unidentified industrial and commercial premises, and residential property is widespread and severe.

[Ed: Can this entry (above) about Shaw/ED905 be correct? The battle order lists F/O W J Shaw in "F2" flying, but no F/Lt D A "Jock" Shaw in ED905 "F". Norman Franks in "Ton-Up Lancs" speculates, based on photos and the mixed up ORB at this point, that the ED905 100th trip was F/Lt D A Shaw 2nd Nov 44 to Duesseldorf. This looks to be confirmed by Jock Shaw log book (information from his daughter). So perhaps the ORB just recorded this information a day or two after the fact. The photo claimed to be ED905 taking off for 100th op may in fact be a photo of the aircraft some weeks earlier; some of the people waving have been positively identified (by John Eppel, Nav F/O J Harris crew, Catherine McIntosh (daughter of F/Lt "Jock" Shaw) and Jenny Dias daughter of Bryan Barby) as being air-crew who were in fact airborne, or taxing for take-off, for the 2 Nov op so could not be standing at the end of a runway waving other crews off!]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 16,000 ft at 19.37 hrs.

Operation/Target: Gelsenkirchen (06 Nov 1944 - 06 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Gelsenkirchen 06 Nov 1944 06 Nov 1944 N Twenty three aircraft with crews took off at approximately 11.00hrs to attack GELSINKIRCHEN 7 miles NE of Essen. The object of this attack was to dislocate the Huns transport facilities by bombing the very large marshalling yards. The weather at the target was 6/10 - 8/10 cloud with a convenient gap for the early arrivals who were able to identify the target area visually, as well as see a few TI markers, marking the A/P. The attack opened a few minutes early, but the later aircraft found the cloud rather too much for accurate bombing and with the M/C giving them instructions to seek their own A/Ps the end of the attack became somewhat scattered. However a good concentration of early bombs were dropped around the A/P and much smoke and later incendiaries with the large fires burning were seen. Flak was moderate to intense throughout the route through the Ruhr, from Duisburg onwards, although it varied greatly as to different aircraft: "E" (F/O Whynacht) receiving flak damage in the fuselage, bomb doors and two radiators. No enemy aircraft were seen, so the figher cover appeared to be adequate. "H" (F/O Bond) found he had no brake pressure on retun so landed without trouble at Carnaby. "M" (F/O McCarthy) did not return and no news was received from him after take off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 19,000 ft. at 13.59

Operation/Target: Wanne-Eikel (09 Nov 1944 - 09 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 09 Nov 1944 09 Nov 1944 N 23 aircraft and crews from 550 Squadron together with one aircraft from each of 166 and 103 Sqdns took off at approximately 07.20hrs to attack the synthetic oil plant at WANNE-EIKEL 2.5 miles NW of Bochum one of the lesser known towns of the Ruhr but nevertheless important since it forms part of the general Ruhr network of railway and marshalling yards. The take-off was good as was the weather up to the French coast after which the crews encountered cloud banks and when the target area was reached there was thick cumulous at 20,000 ft with layer cloud below. Only one aircraft E2 (F/O Stevenson) had a fleeting glimpse of the target, and but for navigational aids the raid would have dissolved itself into a veritable blind mans buff. With such conditions existing it is impossible to assess the success or otherwise of the operation. Flak was scattered and erratic, and the fighter cover of Spitfires and Mustangs kept enemy fighters out of harms way. All our aircraft returned safely and the boys enjoyed a late lunch.
Station Summary
OPERATIONS
At first light 25 aircraft took off from NORTH KILLINGHOLME (comprising 23 of 550 Squadron and 1 of 166 Squadron and 1 of 103 Squadron, the latter having landed here from training) to attack WANNE-EICKEL, as part of a No. 1 Group force of 233 aircraft. All out aircraft returned safely having claimed to have bombed the target.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 19,500 ft at 10.42 F/O L B Cameron (P)
P/O J R Rigby (Nav)
Sgt D Eldridge (F/Eng)
Sgt G A Sutherland (A/B)
F/Sgt J W White (W/Op)
Sgt J F Piertney (MU/AG)
Sgt F P Popple (R/AG)

Operation/Target: Dortmund (11 Nov 1944 - 11 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 11 Nov 1944 11 Nov 1944 N The Squardon dispatched 21 aircraft and crews to attack the north eastern part of the city of DORTMUND where synthetic oil plants, steelworks, coke ovens and a by-products plant with the usual marshalling yards were situated. The take-off was as usual good and once again the crews ran into 10/10 cloud when nearing the target. However with the exceptions, ground markers were vaguely seen reflected on the underside of the clouds and were systematically bombed. Assessments of results are difficult but several reports were made of large explosions in the target area and it is hoped good results were achieved. Flak was generally described as slight to moderate "G" (F/O Young had the fuselage holed rendering the rear turret u/s fortunately there were no casualties.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 18,000 ft at 19.05 F/O L B Cameron (P)
P/O J R Rigby (Nav)
Sgt D Eldridge (F/Eng)
Sgt G A Sutherland (A/B)
F/Sgt J W White (W/Op)
Sgt J F Piertney (MU/AG)
Sgt F P Popple (R/AG)

Operation/Target: Duren (16 Nov 1944 - 16 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duren 16 Nov 1944 16 Nov 1944 N 26 aircraft and crews took off in the usual Squadron style at approximately 12.30hrs to attack DUREN in close support of the advancing American armies. The weather was hazy over Duren but not unkind to our bomb aimers, who thanks to magnificient marking were able to confirm their visual observations and follow the precise instructions of the Master Bomber. The railway complex at this small town, where the line east of Aachen forks to Dusseldorf and Cologne was the aiming point for our aircraft who contribured to the moderate force. Their bombing photographs and visual reports both point to the exceptionally successfull effort which appears to have been repeated on the Command's simultaneous targets at Julich and Heinsberg. Handicapped by the lack of warning, enemy fighters were again absent. Moderate Flak at the target gave an unlucky break to "M2" (F/O George) which was unable to release its bombs due to damage, which amongst other things severed electrical connections. One of the other things was a punctured tyre, in spite of which the pilot landed his aircraft safely at Base on return with a full bomb load. From a gratifying selection of good bombing prints that of "A2" (F/O Shenker) has been chosen for the C in C's enlargement. Plottings are generally well on the mark.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 10,000 ft at 15.35 1/2

Operation/Target: Wanne-Eikel (18 Nov 1944 - 19 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 18 Nov 1944 19 Nov 1944 N The Squadron dispatched 29 aircraft and crews at approximately 15.30hrs to attack a synthetic oil plant at WANNE-EIKEL west of Gelsenkirchen. Soon after take off the crews encountered cloudy weather over England which however cleared across France; shortly after crossing the Rhine a thin layer of stratus cloud with tops at approximately 8000 ft and similiar conditions prevailed over the target area. Although few crews were able to see ground details, the cloud was thin enough for the markers to show through and for the most part a concentrated supply of them was available. Bombing was reported to have been well concentrated around the markers and very early in the attack a large fire developed which, from the column of black smoke which arose it would seem likely that the oil plant was successfully hit. Numerous orange coloured explosions were seen during the course of the attack two which occured at 19.20 and 19.23 must have been particularly large as some of the crews clearly saw the glow when 40 miles away in the homeward journey. Flak was reported to be only slight to moderate in the target area. There were some fighters seen and a few enemy fighters appeared to be about, but our aircraft had no encounters. With the exception of one, all our aircraft attacked the primary target. "C" (F/O Smith) had trouble with a coolant leak in the port inner engine after feathering it and being able to get above 10000 feet he had to abandon just S.E. of Brussels, jettisoning some of his bombs off the East Coast in the permitted area and landing with the remainder. Owing to the deterioration in the weather only 9 aircraft landed at Base, the remainder landed at Stations in the diversion area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 17,000 ft at 19.06 1/2

Operation/Target: Aschaffenburg (21 Nov 1944 - 22 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Aschaffenburg 21 Nov 1944 22 Nov 1944 N The Squadron dispatched 26 aircrarft and crews to attack the marshalling yards at ASCHAFFENBURG. The take off at 15.45hrs was good and without incident. Once again the weather denied crews the satisfaction of even seeing the target or assessing results. En route conditions were good, but over France cloud built up and the Master of Ceremonies and his deputy appeared to be going into a "huddle" to decide exactly where the target was. A small break did reveal markers and these were confirmed to be well placed and were bombed. Following aircraft were assisted by a red glow beneath the clouds and several explosions were reported. F/O Stevenson and W/O Hopman with their crews completed there first tour of operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 13,000 ft at 19.18

Operation/Target: Freiburg (27 Nov 1944 - 27 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Freiburg 27 Nov 1944 27 Nov 1944 N 31 aircraft and crew were dispatched to attack the town of FREIBURG with its associated rail facilities at approximately 15.45hrs. The target was a small one, only approximately 2 miles by 1 and 1/2 miles, and the attack was entrusted to No. 1 Group to accomplish. With every Squadron putting out it's largest numbers, a new record was accomplished with over 300 aircraft and of these all successfully attacked the primary target, except one which was abortive. 550 Squadron accomplised their best performance to date with 31 aircraft off, 31 attacking the target and 31 aircraft returning to Base. After a smooth take-off and an uneventful journey across Allied held France, our crews found that the P.F.F. had prepared a "bang on" show for them. In spite of considerable thick stratus cloud and base well below, markers were being dropped punctually, and in great profusion while the Master Bomber had his finger "well out" and was giving clear and concise directions with machine gun rapidity. Nearly all our crews bombed on ground markers seen through the haze, although two of them took advantage of sky markers which were also dropped. The cloud base prevented the results from being reported as spectacular as they almost certainly were underneath, but the bombing appeared to be concentrated and a satisfactory fire glow soon developed by the light of which later crews were able to see a large church and streets outlined as the looked obliquely under the large pall of black smoke that soon arose. Flak was light and spasmotic, with no searchlights and none of our aircraft was hit. In fact, what "hit" most of them, was the sight of the lights of the Swiss Town of Basle "Like Piccadilly used to be, I suppose" as one Australian Navigator said, and the misty splendour of the misty Alps in the moonlight.
Postscript message from A.O.C. No. 1 Group: "Last night we operated, in all, 312 aircraft with only one abortive sortie and one aircraft missing. Please give my congratulations to all ranks for this magnificent record, which has never before been approached by any Group. It was a splendid achievement by both air and ground crews. All attacks were highly successful".
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 14,000 ft at 20.04

Operation/Target: Dortmund (29 Nov 1944 - 29 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 29 Nov 1944 29 Nov 1944 N 30 aircraft and crew were dispatched to attack DORTMUND. All successfully took off at approximately 11.20hrs, but the weather conditions over the target left much to be desired. Crew reports agree that after a precessional approach through the flak-strewn corridor to the target area, leading sorties arrived somewhat early to find that cloud and haze barred all but a fleeting glimpse of the built-up area and precluded effective pinpointing. The markers appeared to have been widely scatted and the Master Bomber's guidance could hardly have beeen described as inspiring. In the circumstances our sorties endeavoured to bash the bashful marker while others set off in search of built up areas. "C (F/L Maclachlan) and "L2" (F/O Williams) both claim to have bomber red markers. Pressing on, our "E2" (F/O Dale) found himself well past the target area without sighting a worthwhile objective, plain or coloured. Nothing daunted he attacked the centre of Munster and brought back a photograph to prove it. Meanwhile "W" (F/O Adams) losing height on three engines had barely reached the Rhine when prudence counselled an alternative target which he chose at the village of [STEMMELN], where a train on the main line appears in his photo to have had a clean shave. Both these lone wolves brough mementoes of flak opposition at and around their target. All out sorties returned safely, including "P" (F/O Summons) which after colliding with another aircraft en-route to the target, was coaxed on its two port engines alone through a gauntlet of flak towards Dusseldorf. Good airmanship and richly deserved good luck (which unhappily deserted the other victim - an aircraft from a sister Squadron) brought the unfortunate episode to a safe finish for F/O Summons and his crew. Losing height and weaving as much as it dared "P" presented a sitting and solitary target for Jerry's guns. A run was made on a built up area, where in far from ideal conditions the bomb-aimer declared his entire load - minus one bomb-tail - well and truly laid ... a truely remarkable performance, as was disclosed on subsequent inspection of the mangled bomb-bay. Thereafter, losing height on a "Home James!" course, and escorted on the finishing straight by a Spitfire, "P" touched down at Mansten with a dignity that belied its crumpled propellers and disembarked its crew entirely unscathed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 20,000 ft at 14.58 1/2hrs

Operation/Target: Urff Dam (03 Dec 1944 - 03 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Urff Dam 03 Dec 1944 03 Dec 1944 Y 14 aircraft and crew detailed to carry out an attack on URST DAM and took off at approximately 07.30hrs without incident. The weather en-route was bad and over the target visibility was so poor and the weather so bad that the crews returned without dropping their bombs. Flying training programme was also carried out totalling 33.06hrs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Abandoned on instructions of Master Bomber

Operation/Target: Karlsruhe (04 Dec 1944 - 04 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Karlsruhe 04 Dec 1944 04 Dec 1944 N 24 aircraft and crew took off at approximately 16.30hrs to attack the town and railway facilities at KARLRUHE. The crews has an uneventful but rather long trip over Allied Occupied Territory and found the target covered with 9/10th cloud. On approach some crews were able to identify the Red and Green T.I.s below cloud, which were rather scattered. The cloud rapidly moved eastwards and some of the later arrivals were able to identify the town visually. From reports it is gathered that good fires were started in the town, the glow of which could be seen for over 100 miles. Opposition from the ground consisted only of slight flak for the most part bursting well below the aircraft. All our aircraft returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 19,000 feet at 19.34 hours. F/O G W Bell (P)
F/O A W L Lohrey (P)
Sgt R J McElroy (F/Eng)
F/O D C R Hills (Nav)
F/O B H Lowen (A/B)
Sgt J F Noonan (W/Op)
Sgt D E Hookham (MU/AG)
Sgt R West (R/AG)

Operation/Target: Merseburg (06 Dec 1944 - 07 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Merseburg 06 Dec 1944 07 Dec 1944 N 30 crews briefed and took their aircraft off at 16.35hrs without incident to attack the synthetic oil plaint at MERSEBERG. The target was the LEUNA chemical works, one of he largest plants in Germnay, covering an area of 1 1/4 sq miles, and employing some 50000 workers in the manufacture of ammonia, fertilisers, chemicals, synthetic oil and other products. Truely a "chemical hot bed". The customary 10/10 cloud again persisted and bombing was carried out on flares. The glow of fires was visible for some distance on the return journey and several explosions were reported. Owing to the density of the cloud photographs proved useless and the report of our P.R.U colleagues are awaited with interest. Flak was reported as being moderate to intense. Little training was carried out owing to the lack of aircraft. From this operation F/L Morris and crew failed to return.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 19,000 ft at 20.47 hours

Operation/Target: Essen (12 Dec 1944 - 13 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 12 Dec 1944 13 Dec 1944 N 25 aircraft and crews took off without incident at 16.00hrs to attack ESSEN. The journey out proved uneventful and the 10/10 cloud which greets us with almost monotonous regularity was again in evidence. Early crews saw sky markers up aloft, a situation which gave bomb aimers rather a headache, but aircraft arriving later did not have the same problem to solve and were able to bomb in the orthdox fashion. Observed results were confined to a red glow seen reflected on the underside of the clouds and three healthy explosions each of which lighted the sky for appropimately 30 secs. Photographs were unable to throw any light on the subject and so once again we shall have to await the accurate assessment of the result. Flak was light to moderate and later increased in intensity.
In addition to the operations 20.52hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary 20,000 ft at 19.36 1/2 F/O J A Beale (P)
F/O G W Bell (P)
Sgt R J McElroy (F/Eng)
F/O D C R Hills (Nav)
F/O B H Lowen (A/B)
Sgt J F Noonan (W/Op)
Sgt D E Hookham (MU/AG)
Sgt R West (R/AG)

Operation/Target: Ludwigshaven (15 Dec 1944 - 16 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ludwigshaven 15 Dec 1944 16 Dec 1944 N 30 aircraft and crews took off at approximately 14.20 without incident to attack LUDWIGSHAVEN paying particular attention to the chemical works situated on the northern outskirts of the town and extending for approximately 3 miles to the village of Oppan. There was rather more cloud than expected over the route which compelled many crews to fly and to attack from greater heights than intended. The first wave crews were there even before the first pathfinders target indicators, a number of them therefore bombed on navigational aids or on E.T.A. whilst others orbitted thje target until the markers were dropped. A good deal of early bombing was consequently scattered over a wide area as the markers appeared a very good concentration indeed developed. Last crews reports large fires with great volume of smoke. Several photographs brought back confirm the concentration of fires around the markers but ground detail is not good enough to enable their exact location to be plotted. Flak was reported as being considerable, and searchlights very active. The Squadron were to contribute 20 aircraft for this attack. Soon after take off, two aircraft were seen to be having trouble which it was believed might have prevented completion of the sortie, so both reserve aircraft also took off making the Squadron total 30 aircraft, and all of them carried out successful sorties. F/L Pyke "E" had an engine go u/s on the outward route but pressed on regardless to the target and home on three. A/S/L Redmond "R" could not retract one leg of the aircraft undercarriage after take off, he also completed the round trip with a swinging leg.
S/L Redmond on this trip completed his second tour oof operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 17,000 ft at 18.30

Operation/Target: Cologne (24 Dec 1944 - 25 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 24 Dec 1944 25 Dec 1944 N 23 crews were briefed to attack the marshalling yards at COLOGNE-NIPPES. 22 aircraft successfully took off with the intention of disrupting and disorganising things generally. The weather was anything but good at the time of take off, visibility fluctuating between 400-600 yards and before take off there were sinister rumours of a possible diversion - an ugly word at any time - and the wise ones collected their small kit. F/L MacLachlan "C" was genuinely disappointed at being a non-starter with a burst radiator and F/O Grundy "O" was abortive before setting course with a faulty starboard outer engine. The remainder bombed the target. Crews were surprised at the unusual phenomena of an entire absence of cloud, and with the assistance of very accuruate ground marking, proceeed to disrupt and disorganise as ordered. Photographs show many sticks of craters across the marshalling yards with nearly all the rail tracks severed and much rolling stock destroyed. With the exception of F/O Davidson "T(? - illegible)" who landed at Ludford Magna, all the aircraft landed at U.S.A.A.F Wendling, Norfolk. Any visions both air and ground crews may have had of holly, the flowing bowl and fun and games did not materialise. A certain amount of despondency descended on the Waafery and all the ground crews could do was to drink to absent friends, which they did with some measure of enthusiasm. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 17,000 ft at 18.33 hrs. S/L E L Pickles (P)
F/O P H Spindler (Nav)
F/O T M Evans (A/B)
F/O J H Graham (W/Op)
P/O L Brooks (MU/AG)
F/O G H Pascoe (R/AG)
Sgt A R Gow (F/Eng)

Operation/Target: Osterfeld (31 Dec 1944 - 31 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Osterfeld 31 Dec 1944 31 Dec 1944 N 14 aircraft were dispatched from the Squadron at 15.00 hours to assist in the attack on OSTERFELD marshalling yards on the northern end of the Ruhr. The journey outward was uneventful, except that adverse winds from the north speeded up considerably more than forecast, and gave the navigators a lot of hurried extra work to do. On the final "run-in" to the target the aircraft were travelling at something like 350mph ground-speed - "that's 550 that was" - the bomb aimers had to look slippy and "pull their fingers out". The weather at the target was 10/10 fairly thin cloud, thin enough for most bomb-aimers to get a reasonable view of the markers which were in fair supply. Most crews bombed them, only two being forced to rely on navigational aids. Reports of the attack varied from "good" to "disappointing". However, encouraging confirmation came along in the shape of photographs showing sticks right across the marshalling yards and the T.I. streaks also well placed. Flak was again reported as slight and spasmodic, some crews even stated that they had experienced no flak wahtsoever throughout the entire journey through the Ruhr, which is incredibly amazing - however they should know! Eleven hours flying training was carried out during the day and night.


So ends the year 1944, with a good job behind us, and a better and we hope, a final job ahead of us. Come what may 550 is always ready for the fray.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 19,500 ft at 19.02 hrs.

Operation/Target: Nuremburg (02 Jan 1945 - 02 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremburg 02 Jan 1945 02 Jan 1945 N 29 aircraft with crews, plus 2 crews and aircraft from No. 166 Squadron, were briefed to attack Nuremburg. Thirty aircraft took off at approximately 15.00 hours without incident. F/O Summons failed to take off owing to his navigator having met with an accident whilst proceeding to the aircraft. Also one complete crew was sent to R.A.F Elsham Wolds and took off from there to participate in the operation for No. 103 Squadron. The crews found the weather to be cloudy over England, and the Channel, and the Continent as far as 700degrees[???] East. From thence it gradually cleared and at the target conditions were excellent with only a slight ground haze and the built up area contrasted sharply with the snow covered countryside. Owing to the prevailing winds, aircraft arrived early in the target area and some aircraft orbited awaiting the Pathfinder marking. The attacks opened a few minutes early and the first ??? of mixed Red and Green Target Indicators were seen to fall across the Marshalling Yards in the [???] of the town. Excellent concentrated bombing developed, numerous explosions took place, and the glow of the raging fires could be seen 150 miles away by the crews on their return journey. A reconnisance aircraft flying over the target after the attack reported three large area of solid fires to the N.N.W. and one to the S.E. with many smaller ones over the whole area. One aircraft "E" (F/O Smith) developed an oil leak in the port inner engine whilst over France. Correctly following instructions he sought out and found an alternative target, that of the town of Pforsheim, some 25 miles north of the route, lying between Karlsruhe and Stuttgart. The ground defences consisted of slight heavy flak and numerous searchlights, but all ground opposition rapidly decreased as the attack developed. Excellent photographs brought back prove conclusively that the attack was excellent. No flying training was carried out owing to the aircraft being used for operations, but a programme of ground training was carried out by the crews not engaged on operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 16,000 ft at 19.37 hrs.

Operation/Target: Hannover (05 Jan 1945 - 06 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hannover 05 Jan 1945 06 Jan 1945 N 24 aircraft with crews took off at approximately 19.00 hours to attack HANOVER. The weather was nowhere difficult on route and our crews were led visually to the target by means of it's "Blaze of Glory" that could be seen for a hnudred miles, this blaze had been started by an earlier attack two and a half hours before by [unreadable]. Our attack was to impede the fire fighters and add more fuel to the fires. The [???] was blazing beautifully and the second installment of H.Es and incendiaries was added to the [???]. Fires and smoke increased and could be seen by our crews when over the Zuider Zee on their return. Good photographs were brought back. Flak was reported generally as moderate, but accurate for height and there was searchlight activity, although with the glare of Recc. flares above and the fire glow below they had a pretty thin time. The attack was an outstanding success and Hanover now has a hangover. One of our aircraft "M" (F/O Adams) and crew failed to return, no news being received after take-off. They were a grand team and will be missed by all on the Squadron. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 20,000 ft at 21.50 1/2 hrs.

Operation/Target: Munich (07 Jan 1945 - 08 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Munich 07 Jan 1945 08 Jan 1945 N 27 aircraft and crews, which included 2 base reserves, were required on operations and the crews were briefed to attack MUNICH. Owing to three aircraft going unserviceable at the last moment, only 24 aircraft took off at approximately 18.00 hours. Nil to 6/10 cloud tops at 10,000 ft was encountered over this country and the English Channel. A front was positioned just inside the French coast and cloud was 10/10 with tops up to 20,000 ft to approx 5 degress E; from there to 7 degress E, the cloud was thin and a certain amount of icing was experienced, but after crossing the Rhine the cloud once again became 10/10 and the target was completely obscured by fairly thick cloud with tops 10/12000 ft. Owing to stronger winds than forecast the main force arrived early in the target area and many orbited or dog-legged while waiting for markers. Aircraft from No. 5 Group had preceded our attack by several hours and what appeared to be the glow of fires and searchlights illuminating the cloud base could be seen for approximately 40 miles on appreoach to the target. The 5 group attackers experienced more favourable conditions and a concentrated and accuruate bombing appeared to have taken place. For our attack, the markers were sparse. The target indicators rapidly disappeared into the cloud and it was not until 22.33 hours that any degree of concentration of sky marking was achieved; many crews had bombed before this. The concentration of marking was not maintained and the attack can only be regarded as somewhat scattered. No detailed results were observed. Ground defences in the target area consisted only of slight to moderate heavy flak. Stuttgart defenders were active and several combats with night-fighters were reported. All photographs show cloud, therefore no assessment of the attack could be made although from the H.2.S. fixes there can be no doubt that the attack was correctly centered more or less on the centre of the city. F/O Ansell and crew completed a very successful tour with this trip. F/O Clarke ("P") and crew failed to return, nothing having been heard from them after take-off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 17,000 ft at 22.30

Operation/Target: Leuna Oil Plant (14 Jan 1945 - 15 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Leuna Oil Plant 14 Jan 1945 15 Jan 1945 N After a week of enforced flying inactivity, the Squadron stood by for operations with 30 crews of which one complete crew was sent to R.A.F. Station, Kirmington and one to R.A.F Station Elsham to make up operationally fit crew members on these stations. F/O Cameron departed from the Squadron on posting to No. 1656 Heavy Conversion Unit, Lindholme, as an instructor. F/O Cameron had completed a very successful tour with the Squadron and was very popular with all members of the Squadron, who regret his going.
27 aircraft took off at approximately 19.00 hours to attach LEUNA synthetic oil plant near Merseberg. "N" (F/O Parsons) proved abortive owing to the unfortunate illness of one of the crew and returned to Carnaby. The remaining 26 "pressed on regardless", led throughout by the indefatigable "F" Fox. The captain F/Lt "Jock" Shaw has at last been compelled to call it a day with a grand total of 42 operations. Higher authority this time refused his application to continue on Ops much to the disappointment of Jock. The weather on route was fairly good but deteriorated at the target to 10/10 cloud. Bombing was by sky-markers and conditions prevented results being observed. Defences were active. None of our aircraft were damaged and returned safely to base. Flying Officers Harris and George completed their first tour of operations without a single abortive. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 19,000 ft at 00.03 hrs.

Operation/Target: Zeitz Oil Plant (16 Jan 1945 - 17 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Zeitz Oil Plant 16 Jan 1945 17 Jan 1945 N 26 aircraft 2 reserve aircraft and crews stood by for operations. The crews were briefed and 28 aircraft took off without incident at 17.30 hours to attack the synthetic oil plant at ZEITZ, situated some 20 miles south of Leipzig. "E" (F/Lt Pyke) had a somewhat "dicey do" soon after take off and while climbing over base the port outer engine caught fire; unable to extinguish it or feather the airscrew, F/Lt Pyke proceeded out to sea to jettison his bombs and do it quickly as the fire threatened to get out of hand. However, all went well for the fire went out soon after recrossing the coast and landed safely. The weather was as per forecast and gave no trouble. On arrival at their distant target they found clear weather and good visibility. The bombing was highly oncentrated on the centre of the target. 9 major explosions and one really super explosion which belched forth flame and black oily smoke were seen, The crew were really enthusistic and highly satisfied with their night's work. The defences and night fighters were very active, but all returned safely to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 18,000 ft at 22.11 hrs.

Operation/Target: Hamborn (22 Jan 1945 - 22 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hamborn 22 Jan 1945 22 Jan 1945 N 27 aircrews were briefed at 08.45 hours and were in thair aircraft ready for action. The Squadron was to be led by the Station Commander G/Cpt McIntyre, but the intended operation was once again cancelled owing to adverse weather en route and over the target. Needless to say the boys were very disappointed for they all, without excpetion, thoroughly enjoy a daylight operation. A good training programme was laid on but had to be cancelled owing to the Squadron having to prepare for another operation for which 31 aircrews were briefed at 14.30 hours and successfully took of at approximately 16.45 hours. Although take off was good, it needed all the pilots skill to successfully accomplish the feat. The runways were on the treacherous side in spite of the amount of time and effort spent on clearing snow and spreading salt and sand. Watching take off my heart momentarily stood still a few times, severlal aircraft when about to become airbourne had a tendancy to swing sharply to starboard which looked decidedly dangerous.
The Squadron was led by Squadron Commander W/Cdr Bryan Bell (Dingle) to attack the steel works at HAMBORN, the northern suburb of Duisburg. F/Lt Summons in "Q" returned early with C S U(?) trouble, but the remaining 30 had a very successful party. The target was clear of cloud, the marking was accurate and bombing concentrated. Several fires were started and explosions reported, one very impressive and 37 minutes after "N" hours. At the end of the attack the target was covered by a thick pall of smoke. Ground opposition was only slight and fighters little in evidence. All returned safely and unscathed to Base. Photographs brought back show excellent results. F/Lt Shenker and F/O Bell with their crews completed their first operational tours on the high note of this most satisfactory operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 19,000 ft at 20.04 hrs.

Operation/Target: Mannheim-Ludwigshafen (01 Feb 1945 - 02 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim-Ludwigshafen 01 Feb 1945 02 Feb 1945 N After 10 days of enforced idleness due to excessive weather conditions the Squadron was called up on to supply 29 aircraft and crews plus two aircraft and crews in reserve to attack the rail centre and marshalling yards in LUDWIGSHAVEN. 30 aircraft successfully took off at approx. 1530hrs The weather on route was rather mixed from 10/10 cloud to clear conditions over the Channel well broken cluid over the Continent until the target 10/10 cloud built up about 5 miles hort on the run in. On the return very turbulent conditions were encountered crossing the North Sea to the Norfolk Coast. At the target both ground and sky marking was resorted to by the PFF but with the target indicators disappearing into the low cloud and some of the sky markers being too high for easy aiming, bomb aimers had rather a difficult time. Results were very obscure, there was however a very encouraging incendiary glow that developed into a compact fire mass with two explosions. From the H2S photographs brought back, it is thought that there was a tendency to undershoot. Flak was reported as slight, later decreasing to give way to night fighter activity. Night fighters were more active than usual and several combats were observed.
F/L Maltin and his crew completed their second tour and F/L Doward and his crew completed their first tour of operations successfully. F/O Lohrey and his crew failed to return and it was at first reported as missing but later it was learnt that at least five of his crew, including himself, were safe in Allied Territory, after having been forced to abandon their aircraft which had been badly damaged colliding with a friendly aircraft near the target area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary at 17,000 ft at 19.25 hrs.

Operation/Target: Weisbane (02 Feb 1945 - 03 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Weisbane 02 Feb 1945 03 Feb 1945 N 28 aircraft and crews were accepted and briefed to attach WEISBANE where enemy troops were reported to be resting and being re-fitted preparatory to a move to the Eastern Front. Of the 28 aircraft, only 26 aircraft took off, 2 aircraft were non-starters owing to one developing engine trouble and the other being bogged due to a temporary failure of some perimeter track lighting. The weather again was our chief enemy. Cloud up to 20,000 ft had been predicted over the Channel only, but in point of fact the worst conditions were over the target where there was layer cloud up to this height and over. Markers were completely obscured and in the circumstances it hardly seems likely that a concentrated attack could have been made. Flak was very ineffective but three of our aircraft saw enemy fighters and opened fire on them without response or conclusive result. All our aircraft returned safely one landing at Kirmington.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 Returned Primary, at 20,000 ft. at 23.537 1/2 hrs.

Operation/Target: Bottrop (03 Feb 1945 - 03 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bottrop 03 Feb 1945 03 Feb 1945 N The Squadron were called upon to supply 14 aircraft and crews for an attack on the Prosper Coking Plant at BOTTROP north of Essen. In contract to the previous night the weather was good but opinions waried as to whether the target was entirely cloud free but either haze or very thin cloud obscured exact ground detail. The markers were accurately placed and the bombing appear to be equally as good. There were several explosions and quite a number of fires. Ground opposition was reported as being from slight to moderate. Numerous searchlighs were active and believed to have been illuminating for fighters, where were reports as being numerous. F/O Nye and crew in "R" failed to return. It is believed that they has fallen a victim to a night fighter after crossing the battle front and were shot down in Holland. It is feared there were no survivors. F/O Cowper and "F" "pressed on" with his rear turret practically unserviceable throughout the trip. Owing to haze the photographs taken over the target were not particularly good, some of them have, however, been plotted and at least one aiming point secured.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
PD221 FTR MISSING - no news after take-off. F/O R G Nye (P)
Sgt C Stuart (F/Eng)
Sgt J Holding (Nav)
Sgt J F Moyle (A/B)
W/O W J Howson (W/Op)
F/Sgt W H Cook (MU/AG)
F/Sgt L C Taerum (R/AG)

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 69
MAX Aircraft deployed
in single operation
1
(Caen, 18 Jul 1944)

These details were last updated: 24 November 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.