Squadron Operations: Summary Information
Overview
There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to
build this page was taken in the first instance from the lists provided on the original Squadron Association web-site,
but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).
This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.
Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:
- the operation was cancelled before crews were briefed
- the crews have been briefed as to the target, and in some cases the planes may even have been bombed up and the crews on-board at their stations awaiting take-off, before the op has been stood-down
- finally a number of cases where the op was already under way and the planes en-route but for whatever reason the operation was aborted (e.g. the master bomber orders the attack cancelled due to weather conditions at target adversely affecting targeting).
Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.
Servicemen Deployed: Names of the crew in the operation.
Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).
Definitions of the abbreviations used are available: here.
Manageable Lists
The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate.
There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.
Operation/Target: Gelsenkirchen (06 Nov 1944 - 06 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Gelsenkirchen |
06 Nov 1944 |
06 Nov 1944 |
N |
Twenty three aircraft with crews took off at approximately 11.00hrs to attack GELSINKIRCHEN 7 miles NE of Essen. The object of this attack was to dislocate the Huns transport facilities by bombing the very large marshalling yards. The weather at the target was 6/10 - 8/10 cloud with a convenient gap for the early arrivals who were able to identify the target area visually, as well as see a few TI markers, marking the A/P. The attack opened a few minutes early, but the later aircraft found the cloud rather too much for accurate bombing and with the M/C giving them instructions to seek their own A/Ps the end of the attack became somewhat scattered. However a good concentration of early bombs were dropped around the A/P and much smoke and later incendiaries with the large fires burning were seen. Flak was moderate to intense throughout the route through the Ruhr, from Duisburg onwards, although it varied greatly as to different aircraft: "E" (F/O Whynacht) receiving flak damage in the fuselage, bomb doors and two radiators. No enemy aircraft were seen, so the figher cover appeared to be adequate. "H" (F/O Bond) found he had no brake pressure on retun so landed without trouble at Carnaby. "M" (F/O McCarthy) did not return and no news was received from him after take off. |
Aircraft Deployed |
Servicemen Deployed |
Aircraft Service Number |
Returned or FTR |
Comments |
Crew Details |
NG165
|
Returned |
Primary, at 17,500 ft. at 14.01 |
|
Operation/Target: Wanne-Eikel (09 Nov 1944 - 09 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Wanne-Eikel |
09 Nov 1944 |
09 Nov 1944 |
N |
23 aircraft and crews from 550 Squadron together with one aircraft from each of 166 and 103 Sqdns took off at approximately 07.20hrs to attack the synthetic oil plant at WANNE-EIKEL 2.5 miles NW of Bochum one of the lesser known towns of the Ruhr but nevertheless important since it forms part of the general Ruhr network of railway and marshalling yards. The take-off was good as was the weather up to the French coast after which the crews encountered cloud banks and when the target area was reached there was thick cumulous at 20,000 ft with layer cloud below. Only one aircraft E2 (F/O Stevenson) had a fleeting glimpse of the target, and but for navigational aids the raid would have dissolved itself into a veritable blind mans buff. With such conditions existing it is impossible to assess the success or otherwise of the operation. Flak was scattered and erratic, and the fighter cover of Spitfires and Mustangs kept enemy fighters out of harms way. All our aircraft returned safely and the boys enjoyed a late lunch. |
Station Summary |
OPERATIONS At first light 25 aircraft took off from NORTH KILLINGHOLME (comprising 23 of 550 Squadron and 1 of 166 Squadron and 1 of 103 Squadron, the latter having landed here from training) to attack WANNE-EICKEL, as part of a No. 1 Group force of 233 aircraft. All out aircraft returned safely having claimed to have bombed the target. |
Operation/Target: Wanne-Eikel (18 Nov 1944 - 19 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Wanne-Eikel |
18 Nov 1944 |
19 Nov 1944 |
N |
The Squadron dispatched 29 aircraft and crews at approximately 15.30hrs to attack a synthetic oil plant at WANNE-EIKEL west of Gelsenkirchen. Soon after take off the crews encountered cloudy weather over England which however cleared across France; shortly after crossing the Rhine a thin layer of stratus cloud with tops at approximately 8000 ft and similiar conditions prevailed over the target area. Although few crews were able to see ground details, the cloud was thin enough for the markers to show through and for the most part a concentrated supply of them was available. Bombing was reported to have been well concentrated around the markers and very early in the attack a large fire developed which, from the column of black smoke which arose it would seem likely that the oil plant was successfully hit. Numerous orange coloured explosions were seen during the course of the attack two which occured at 19.20 and 19.23 must have been particularly large as some of the crews clearly saw the glow when 40 miles away in the homeward journey. Flak was reported to be only slight to moderate in the target area. There were some fighters seen and a few enemy fighters appeared to be about, but our aircraft had no encounters. With the exception of one, all our aircraft attacked the primary target. "C" (F/O Smith) had trouble with a coolant leak in the port inner engine after feathering it and being able to get above 10000 feet he had to abandon just S.E. of Brussels, jettisoning some of his bombs off the East Coast in the permitted area and landing with the remainder. Owing to the deterioration in the weather only 9 aircraft landed at Base, the remainder landed at Stations in the diversion area. |
Aircraft Deployed |
Servicemen Deployed |
Aircraft Service Number |
Returned or FTR |
Comments |
Crew Details |
NG165
|
Returned |
Primary, at 17,500 ft at 19.08 |
|
Operation/Target: Aschaffenburg (21 Nov 1944 - 22 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Aschaffenburg |
21 Nov 1944 |
22 Nov 1944 |
N |
The Squadron dispatched 26 aircrarft and crews to attack the marshalling yards at ASCHAFFENBURG. The take off at 15.45hrs was good and without incident. Once again the weather denied crews the satisfaction of even seeing the target or assessing results. En route conditions were good, but over France cloud built up and the Master of Ceremonies and his deputy appeared to be going into a "huddle" to decide exactly where the target was. A small break did reveal markers and these were confirmed to be well placed and were bombed. Following aircraft were assisted by a red glow beneath the clouds and several explosions were reported. F/O Stevenson and W/O Hopman with their crews completed there first tour of operations. |
Operation/Target: Freiburg (27 Nov 1944 - 27 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Freiburg |
27 Nov 1944 |
27 Nov 1944 |
N |
31 aircraft and crew were dispatched to attack the town of FREIBURG with its associated rail facilities at approximately 15.45hrs. The target was a small one, only approximately 2 miles by 1 and 1/2 miles, and the attack was entrusted to No. 1 Group to accomplish. With every Squadron putting out it's largest numbers, a new record was accomplished with over 300 aircraft and of these all successfully attacked the primary target, except one which was abortive. 550 Squadron accomplised their best performance to date with 31 aircraft off, 31 attacking the target and 31 aircraft returning to Base. After a smooth take-off and an uneventful journey across Allied held France, our crews found that the P.F.F. had prepared a "bang on" show for them. In spite of considerable thick stratus cloud and base well below, markers were being dropped punctually, and in great profusion while the Master Bomber had his finger "well out" and was giving clear and concise directions with machine gun rapidity. Nearly all our crews bombed on ground markers seen through the haze, although two of them took advantage of sky markers which were also dropped. The cloud base prevented the results from being reported as spectacular as they almost certainly were underneath, but the bombing appeared to be concentrated and a satisfactory fire glow soon developed by the light of which later crews were able to see a large church and streets outlined as the looked obliquely under the large pall of black smoke that soon arose. Flak was light and spasmotic, with no searchlights and none of our aircraft was hit. In fact, what "hit" most of them, was the sight of the lights of the Swiss Town of Basle "Like Piccadilly used to be, I suppose" as one Australian Navigator said, and the misty splendour of the misty Alps in the moonlight.
Postscript message from A.O.C. No. 1 Group: "Last night we operated, in all, 312 aircraft with only one abortive sortie and one aircraft missing. Please give my congratulations to all ranks for this magnificent record, which has never before been approached by any Group. It was a splendid achievement by both air and ground crews. All attacks were highly successful". |
Operation/Target: Dortmund (29 Nov 1944 - 29 Nov 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Dortmund |
29 Nov 1944 |
29 Nov 1944 |
N |
30 aircraft and crew were dispatched to attack DORTMUND. All successfully took off at approximately 11.20hrs, but the weather conditions over the target left much to be desired. Crew reports agree that after a precessional approach through the flak-strewn corridor to the target area, leading sorties arrived somewhat early to find that cloud and haze barred all but a fleeting glimpse of the built-up area and precluded effective pinpointing. The markers appeared to have been widely scatted and the Master Bomber's guidance could hardly have beeen described as inspiring. In the circumstances our sorties endeavoured to bash the bashful marker while others set off in search of built up areas. "C (F/L Maclachlan) and "L2" (F/O Williams) both claim to have bomber red markers. Pressing on, our "E2" (F/O Dale) found himself well past the target area without sighting a worthwhile objective, plain or coloured. Nothing daunted he attacked the centre of Munster and brought back a photograph to prove it. Meanwhile "W" (F/O Adams) losing height on three engines had barely reached the Rhine when prudence counselled an alternative target which he chose at the village of [STEMMELN], where a train on the main line appears in his photo to have had a clean shave. Both these lone wolves brough mementoes of flak opposition at and around their target. All out sorties returned safely, including "P" (F/O Summons) which after colliding with another aircraft en-route to the target, was coaxed on its two port engines alone through a gauntlet of flak towards Dusseldorf. Good airmanship and richly deserved good luck (which unhappily deserted the other victim - an aircraft from a sister Squadron) brought the unfortunate episode to a safe finish for F/O Summons and his crew. Losing height and weaving as much as it dared "P" presented a sitting and solitary target for Jerry's guns. A run was made on a built up area, where in far from ideal conditions the bomb-aimer declared his entire load - minus one bomb-tail - well and truly laid ... a truely remarkable performance, as was disclosed on subsequent inspection of the mangled bomb-bay. Thereafter, losing height on a "Home James!" course, and escorted on the finishing straight by a Spitfire, "P" touched down at Mansten with a dignity that belied its crumpled propellers and disembarked its crew entirely unscathed. |
Operation/Target: Urff Dam (03 Dec 1944 - 03 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Urff Dam |
03 Dec 1944 |
03 Dec 1944 |
Y |
14 aircraft and crew detailed to carry out an attack on URST DAM and took off at approximately 07.30hrs without incident. The weather en-route was bad and over the target visibility was so poor and the weather so bad that the crews returned without dropping their bombs. Flying training programme was also carried out totalling 33.06hrs. |
Operation/Target: Karlsruhe (04 Dec 1944 - 04 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Karlsruhe |
04 Dec 1944 |
04 Dec 1944 |
N |
24 aircraft and crew took off at approximately 16.30hrs to attack the town and railway facilities at KARLRUHE. The crews has an uneventful but rather long trip over Allied Occupied Territory and found the target covered with 9/10th cloud. On approach some crews were able to identify the Red and Green T.I.s below cloud, which were rather scattered. The cloud rapidly moved eastwards and some of the later arrivals were able to identify the town visually. From reports it is gathered that good fires were started in the town, the glow of which could be seen for over 100 miles. Opposition from the ground consisted only of slight flak for the most part bursting well below the aircraft. All our aircraft returned safely. |
Operation/Target: Merseburg (06 Dec 1944 - 07 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Merseburg |
06 Dec 1944 |
07 Dec 1944 |
N |
30 crews briefed and took their aircraft off at 16.35hrs without incident to attack the synthetic oil plaint at MERSEBERG. The target was the LEUNA chemical works, one of he largest plants in Germnay, covering an area of 1 1/4 sq miles, and employing some 50000 workers in the manufacture of ammonia, fertilisers, chemicals, synthetic oil and other products. Truely a "chemical hot bed". The customary 10/10 cloud again persisted and bombing was carried out on flares. The glow of fires was visible for some distance on the return journey and several explosions were reported. Owing to the density of the cloud photographs proved useless and the report of our P.R.U colleagues are awaited with interest. Flak was reported as being moderate to intense. Little training was carried out owing to the lack of aircraft. From this operation F/L Morris and crew failed to return. |
Operation/Target: Essen (12 Dec 1944 - 13 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Essen |
12 Dec 1944 |
13 Dec 1944 |
N |
25 aircraft and crews took off without incident at 16.00hrs to attack ESSEN. The journey out proved uneventful and the 10/10 cloud which greets us with almost monotonous regularity was again in evidence. Early crews saw sky markers up aloft, a situation which gave bomb aimers rather a headache, but aircraft arriving later did not have the same problem to solve and were able to bomb in the orthdox fashion. Observed results were confined to a red glow seen reflected on the underside of the clouds and three healthy explosions each of which lighted the sky for appropimately 30 secs. Photographs were unable to throw any light on the subject and so once again we shall have to await the accurate assessment of the result. Flak was light to moderate and later increased in intensity. In addition to the operations 20.52hrs flying training was carried out. |
Operation/Target: Ludwigshaven (15 Dec 1944 - 16 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Ludwigshaven |
15 Dec 1944 |
16 Dec 1944 |
N |
30 aircraft and crews took off at approximately 14.20 without incident to attack LUDWIGSHAVEN paying particular attention to the chemical works situated on the northern outskirts of the town and extending for approximately 3 miles to the village of Oppan. There was rather more cloud than expected over the route which compelled many crews to fly and to attack from greater heights than intended. The first wave crews were there even before the first pathfinders target indicators, a number of them therefore bombed on navigational aids or on E.T.A. whilst others orbitted thje target until the markers were dropped. A good deal of early bombing was consequently scattered over a wide area as the markers appeared a very good concentration indeed developed. Last crews reports large fires with great volume of smoke. Several photographs brought back confirm the concentration of fires around the markers but ground detail is not good enough to enable their exact location to be plotted. Flak was reported as being considerable, and searchlights very active. The Squadron were to contribute 20 aircraft for this attack. Soon after take off, two aircraft were seen to be having trouble which it was believed might have prevented completion of the sortie, so both reserve aircraft also took off making the Squadron total 30 aircraft, and all of them carried out successful sorties. F/L Pyke "E" had an engine go u/s on the outward route but pressed on regardless to the target and home on three. A/S/L Redmond "R" could not retract one leg of the aircraft undercarriage after take off, he also completed the round trip with a swinging leg.
S/L Redmond on this trip completed his second tour oof operations.
|
Operation/Target: Ulm (17 Dec 1944 - 18 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Ulm |
17 Dec 1944 |
18 Dec 1944 |
N |
29 crews were briefed to attack the rail junction at ULM situated some 100 miles inside the German frontier on the banks of the Danube. Heavy cloud compelled low flying for most of the way, but in the target area there was little more than thin stratus which did not prevent ground markers from being seen through it. The Master Bomber' assessment of the situation however was that the best results were likely to be produced from aiming on the well placed and plentiful sky markers and ordered bombing accordingly. A very good concentration of fire developed, with a number of spectacular explosions occuring among them. Defences were meagre and there were no searchlights active. S/L Caldow "B" was unlucky - one of the few flak bursts over the target hit one of his aircrafts fuel tanks, which promptly emptied, the tailplane, elevators damaged and one of the aerials shot away which did not interfere with a safe return and landing at Base. No flying training was carried out. |
Operation/Target: Koblenz (22 Dec 1944 - 22 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Koblenz |
22 Dec 1944 |
22 Dec 1944 |
N |
24 crews were briefed to attack the communications centre at KOBLENZ and 20 took off at approximately 15.15 hours in fog which had been with us for days. The visibility at its best was 300 yards. F/Lt Shaw "E" was the first to take to the air and the remainder of the boys decided that if a Scotsman could get off so could they. The 20 aircraft successfully took off, four aircraft were cancelled as the visibility became really impossible. It appears that other stations in the base were not so badly handicapped by weather conditions as was Killingholme, and it is considered that the Squadron did well to get 20 aircraft off the deck. No trouble was experienced on route and all aircraft arrived at the target area with the exception of "H" (F/O Franklyn, J) who had to return from France with a Port Outer Engine unserviceable, and was diverted to R.A.F. Croft. At the target 2/10 to 4/10 thin cloud experienced, the sky marking was a few minutes late, but enough flares were dropped to enable most of the crews to bomb them. Some crews caught momentary glimpses of the two rivers standing out from the snow covered ground and there were opinions that the attack fell slightly south of the aiming point. This is confirmed by photographs brought back. The defences were quiet, flak being described as slight with no searchlights operating. Whilst the aircraft were on their journey, visibility at Base had deteriorated still further and all our aircraft were diverted to Woodbridge and all landed safely. "K" got down at Mildenhall and "Q" at Langham. Flying through the twin flame lanes of the fog dispersal apparatus one Australian gunner was heard to say that it was the first time he felt really warm in this country. No flying training was undertaken. |
Aircraft Deployed |
Servicemen Deployed |
Aircraft Service Number |
Returned or FTR |
Comments |
Crew Details |
NG165
|
Returned |
Primary, at 20,000 ft at 18.55 hrs. |
|
Operation/Target: Cologne (24 Dec 1944 - 25 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Cologne |
24 Dec 1944 |
25 Dec 1944 |
N |
23 crews were briefed to attack the marshalling yards at COLOGNE-NIPPES. 22 aircraft successfully took off with the intention of disrupting and disorganising things generally. The weather was anything but good at the time of take off, visibility fluctuating between 400-600 yards and before take off there were sinister rumours of a possible diversion - an ugly word at any time - and the wise ones collected their small kit. F/L MacLachlan "C" was genuinely disappointed at being a non-starter with a burst radiator and F/O Grundy "O" was abortive before setting course with a faulty starboard outer engine. The remainder bombed the target. Crews were surprised at the unusual phenomena of an entire absence of cloud, and with the assistance of very accuruate ground marking, proceeed to disrupt and disorganise as ordered. Photographs show many sticks of craters across the marshalling yards with nearly all the rail tracks severed and much rolling stock destroyed. With the exception of F/O Davidson "T(? - illegible)" who landed at Ludford Magna, all the aircraft landed at U.S.A.A.F Wendling, Norfolk. Any visions both air and ground crews may have had of holly, the flowing bowl and fun and games did not materialise. A certain amount of despondency descended on the Waafery and all the ground crews could do was to drink to absent friends, which they did with some measure of enthusiasm. No flying training was carried out. |
Operation/Target: Scholven-Buer (29 Dec 1944 - 29 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Scholven-Buer |
29 Dec 1944 |
29 Dec 1944 |
N |
22 aircraft with crews took off without incidient at 15.00 hours to attack synthetic oil plants at SCHOLVEN-BUER approximately 7 miles north of Gelsenkirchen. At the target 10/10 thin cloud was met but this did not, however, prevent the target indictators from being well seen. Bombing quickly became concentrated round the markers, and almost immediately a very large explosion was seen, and resulted in thick columns of black smoke rising through the clouds. Several good fires developed and explosions were continuous until the last aircraft left. The defences of Cologne, Bochum, Gelsenkirchen and the Essen district were very active but not over the target itself. Cloud prevented ground detail coming in the photographs brought back, but in many of them, the fires and explosions show most encouragingly. It is thought that the attack was a success and all aircraft returned safely to base. No flying training was carried out. |
Operation/Target: Osterfeld (31 Dec 1944 - 31 Dec 1944)
Operation Summary |
Target |
Out |
Back |
Aborted (Y / N) |
Comments |
Osterfeld |
31 Dec 1944 |
31 Dec 1944 |
N |
14 aircraft were dispatched from the Squadron at 15.00 hours to assist in the attack on OSTERFELD marshalling yards on the northern end of the Ruhr. The journey outward was uneventful, except that adverse winds from the north speeded up considerably more than forecast, and gave the navigators a lot of hurried extra work to do. On the final "run-in" to the target the aircraft were travelling at something like 350mph ground-speed - "that's 550 that was" - the bomb aimers had to look slippy and "pull their fingers out". The weather at the target was 10/10 fairly thin cloud, thin enough for most bomb-aimers to get a reasonable view of the markers which were in fair supply. Most crews bombed them, only two being forced to rely on navigational aids. Reports of the attack varied from "good" to "disappointing". However, encouraging confirmation came along in the shape of photographs showing sticks right across the marshalling yards and the T.I. streaks also well placed. Flak was again reported as slight and spasmodic, some crews even stated that they had experienced no flak wahtsoever throughout the entire journey through the Ruhr, which is incredibly amazing - however they should know! Eleven hours flying training was carried out during the day and night.
So ends the year 1944, with a good job behind us, and a better and we hope, a final job ahead of us. Come what may 550 is always ready for the fray. |
Summary Statistics
Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:
Aircraft Deployment Statistics
Aircraft deployments |
16 |
MAX Aircraft deployed in single operation |
1 (Gelsenkirchen, 06 Nov 1944) |
These details were last updated: 21 November 2024
Note
this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added
This note describes the options currently available to produce a smaller,
more manageable list and also describes planned future enhancements to the reporting facility.
Return to the top of the page.