Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Calais (25 Sep 1944 - 25 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 25 Sep 1944 25 Sep 1944 N 25 aircraft and crews detailed, briefed and took off to blast the Hun out of Calais, precision bombing was called for owning to the close proximity of Allied troops The weather conditions were bad over the target and the Master Bomber ordered all aircraft to return to base with their bombs.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Abandoned on instructions of Master Bomber F/O G H Markes (P)
Sgt K J Brotherhood (F/Eng)
F/Sgt F W L Mann (Nav)
Sgt V T Wilkes (A/B)
Sgt F N M Petch (W/Op)
Sgt L G Buckell (MU/AG)
Sgt D J Driscoll (R/AG)

Operation/Target: Calais (26 Sep 1944 - 26 Sep 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Calais 26 Sep 1944 26 Sep 1944 N 24 aircraft and crews again detailed, briefed and took off to blast the Hun who are still holding out of Calais. This time the weather was good enough to permit precision bombing which was successfully applied.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 2600 at 12.26 1/2hrs. F/O G H Markes (P)
Sgt K J Brotherhood (F/Eng)
F/Sgt F W L Mann (Nav)
Sgt V T Wilkes (A/B)
Sgt F N M Petch (W/Op)
Sgt L G Buckell (MU/AG)
Sgt D J Driscoll (R/AG)

Operation/Target: Saarbrucken (05 Oct 1944 - 06 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Saarbrucken 05 Oct 1944 06 Oct 1944 N 27 aircraft with crew were briefed and took-off at 18.22hrs to attack military objectives in SAARBRUCKEN. "F" (F/Lt Shaw) and "A" (S/Ldr Misselbrock) returned early, the former owing to "Gee" being unserviceable and the latter with the Captain sick. The remainder of the force, after flying through some rather dirty weather over England, found the target area almost clear with only ground base or thin cloud to prevent excellent visibility. The marking was punctual and well placed. In addition to a large and apparently concentrated mass of incendiaries with fires taking a good hold, the chief show piece of the evening was a truely tremendous explosion, so great that every crew unanimously noted the time as 22.46 hours, with a sheet of orange flame many hundreas of feet in the air, and smoke rising to 8000 to 10,000 ft. It would appear that the Hun will have several rounds less to fire at our Allies of the 3rd American Army. Flak was described as being moderate. Enemy night fighters were conspicuous by their absence. Photos taken show a mass of incendiary and fire traps, but unfortunately no ground detail. Visibility deteriorated rapdily at base and the aircraft, all of which returned safely, were diverted to Norfolk. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 14,000 ft at 22.34 hours F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Emmerich (07 Oct 1944 - 07 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Emmerich 07 Oct 1944 07 Oct 1944 N Twenty five aircraft and crews were detailed and briefed, 24 took off at noon to attack Military objectives at EMMERICH in close support of the Allied Ground Forces. "F" (F/L Shaw) returned early owing to engine trouble. "C2" (F/O Hussey) failed to take off owing to compressor trouble. Emmerich, a small compact town on the North bank of the Rhine just inside Germany, serving as an important Railway Centre and a rendevous for troops and material was easily identified. The weather over the sea was cloudy, but clear with good visibility over the target. Markers were accurate and the town was soon covered by clouds of smoke, rising to a height of approximately 12,000 ft, from excellent fires at their base. Very good photographs were obtained showing a vivid picture of the attack. There is no doubt that much weaving was necessary over the target as the Flak was vicious and accurately predicted and more than one aircraft brought back evidence of this in the shape of Flak holes. The return journey was uneventful, except of a grandstand view of Cleves [Ed: Kleve. A town in the Lower Rhine region of northwestern Germany near the Dutch border and the River Rhine] which had also been attacked and was burning well. At the Base the weather had deteriorated with cloud down to the "deck" and for the second time running the aircraft were diverted, this time to Faldingworth and Blyton.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 11,000 ft at 14.00hrs

[Ed: ORB says NF132 "E2", but can find no record of this service number and NG132 "E2" is assumed
F/L N L Rose (P)
Sgt K L Willis (F/Eng)
F/O R C Foote (Nav)
F/O E G Caswell (A/B)
Sgt G W Page (W/Op)
F/O J S Tointon (MU/AG)
Sgt G S Spragg (R/AG)

Operation/Target: Fort Frederick Hendrick (11 Oct 1944 - 12 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Fort Frederick Hendrick 11 Oct 1944 12 Oct 1944 N 27 aircraft and crews were offered for operations but only 18 were accepted. These were briefed and took off ay 14.30hrs without incident to attack military targets at FORT FREDERICK HENDRICK, where the Hun is making a stand despite the fact that he is entirely encircled by the Allied Army. An ultimatium to surrender within 24hrs to prevent unnecessary bloodshed was handed to the Garrison Commander, but no reply having been received this was the cause of the operation, which was to blast the Hun from his own doorstep. It was rather disappointing to the boys that only 18 aircraft were called for as all the Squadron wanted to participate. In addition to the operational sorties a useful training programme was laid on consisting of "Y" cross country, figther affiliation, air to air and air to sea firing exercises and bombing practice.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 4500 ft at 16.56hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Duisburg (14 Oct 1944 - 14 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 14 Oct 1944 N 25 aircraft and crews were briefed to attack the large steelworks of August Thysson at Duisburg, the world largest inland port. 24 aircraft took off without incident at approx 06.30hrs to make their way through layer cloud which broke before the Rhiner but closed in again over the target and only the crew of "H" (F/O Bond) claim to have bombed the ground markers. "N" (F/S Hopman), "A2" (S/L Gainsford) and "E2" (F/O Stevenson) claim to have bombed their objectives on Navigational aids, the others endeavoured to obey the Master Bombers instruction to bomb any built up area they could see in the vicinity of the target. Several crews reported that the Thyssen works were identified and in flames and one crew reported having observed the demolition of a Rhine bridge. At least one good photograph was obtained by "C2" (F/O John) showing a carpet of bomb bursts on the Steelworks which has been enlarged and forwarded to the C in C for his inspection.
F/O Abrams and F/O Dodds and their crews failed to return from this daylight raid in which approximately 1000 heavy aircraft with fighter cover took part.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,500 ft at 08.46hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Duisburg (14 Oct 1944 - 15 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 14 Oct 1944 15 Oct 1944 N There was no respite for the Squadron for a further 25 aircraft and crews were required, provided and briefed to attack once again Duisburg the scene of their early morning visit. All our aircraft returned safely from this operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 18,000 ft at 01.32 1/2 hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Wilhelmshaven (15 Oct 1944 - 16 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wilhelmshaven 15 Oct 1944 16 Oct 1944 N 24 aircraft and crews were offered for operations, but only 8 were required and were briefed and took off to attach Wilhelmshaven, from which once again, all returned safely. In addition "Y" cross country exercises were carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,000 ft at 19.55 hrs

Operation/Target: Stuttgart (19 Oct 1944 - 20 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Stuttgart 19 Oct 1944 20 Oct 1944 N Twenty six aircraft with crews were offered and twenty five were accepted, plus one aircraft to act as stand-by in the Base. The crews were briefed and took off at 16.50hrs at attack STUTTGART. Twenty took off at this time and the remaining five at 21.30hrs to attack Stuttgart, in two waves. One aircraft was cancelled at the last moment and one aircraft returned early with engine trouble, so in all only 24 aircraft proceeded to the target, one of which, it is regretted, failed to return. F/L Thomas and crew, who had only been with the Squadron a short time and were on their first operational sortie. Moderately cloudy conditions were encountered en route, but over the target 9/10 thick cloud was present and sky marking had to be resorted to. Six crews found momentary gaps to bomb ground markers. Very few results could be seen, only a vague incendiary and fire glow being visible under the cloud. Flak was reported as slight to moderate with some ineffective searchlights. "A" (F/O Young) received some unpleasant attention and was well peppered by flak receiving damage in the tail plane, fuselage, flaps punctured, hydraulics and bomb container. "K" (F/O Daniels) also found Karlsruhe defences awake and received damage to the port wing, fuselage and a punctured tyre. Both aircraft landed safely at Base without casualty. All photographs show cloud and damage cannot be assessed. In additions to operational flying a training programme consisting of Air to Air firing, Air to Sea firing, practice bombing, Fighter affiliation and "Y" Night cross country exercises were carried out.

[Ed: some of the up and down times (and bomb delivery times at primary target) are wildly different (PB514, JB345, EE139, ME301) from the remainder of the aircraft. In the case of ME301 bomb delivery is only 30mins after take-off and 3 hours earlier than any other aircraft.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 17,500 feet at 00.52 hours
Up and down times seriously out of sync with other flights
F/O I A Stevenson (P)
W/O J Groves (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Essen (23 Oct 1944 - 23 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 23 Oct 1944 23 Oct 1944 N 26 aircraft with crews were offered for operations and were briefed at 14.15hrs, with one crew acting as Squadron stand-by. Twenty-five aircraft took off at 16.15hrs to form part of a 1000 aircraft attack on ESSEN. Twenty-four succeeded in bombing the primary target and one aircraft returned early. Opposition encountered was considered moderate and the weather was reasonably good, all aircraft returned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 21,000 ft at 19.39 1/2 hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Cologne (28 Oct 1944 - 28 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 28 Oct 1944 28 Oct 1944 N Thirty aircraft and crews were offered for opertions, twenty seven were accepted and stood by to be called upon at short notice for a daylight attack on COLOGNE. Twenty seven aircraft took off without incident at 13.10hrs, led by the Squadron Commander, Wing Commander B. Bell, more affectionately known as "Dingle". The weather conditions at Base left much to be desired and it seemed that the boys would not be able to take off owing to mist and low cloud, but the weather cleared for a brief spell which allowed the boys to take to the air and on to successfully attack military objectives in the Cologne area. The weather over the target was good and the crews highly delighted with the results achieved. The huge and busy railway bridge spanning the Rhine was seen to have had its time. All our aircraft returned safely to Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 19,000 ft at 15.47hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Walcheren (29 Oct 1944 - 29 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Walcheren 29 Oct 1944 29 Oct 1944 N 30 aircraft and crews were again offered for operations, but only eight were accepted for another daylight attack on the gun enplacements off the island of WALCHEREN at Domburg. No opposition was experienced and the target was successfully bombed, and all our aircraft returned without incident. This is considered to have been the Squadrons easiest operation since its inception. In addition to operations 13 1/2 hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 7000 ft at 13.15 1/2hrs F/L R P Stone (P)
F/Sgt C W Sawyers (Nav)
F/O K A Whynacht (P)
Sgt G E White (F/Eng)
F/Sgt E W Holliday (A/B)
Sgt D E Norgrove (W/Op)
Sgt L G B Wartnaby (MU/AG)
F/Sgt F Wright (R/AG)

Operation/Target: Cologne (30 Oct 1944 - 30 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 30 Oct 1944 30 Oct 1944 N Twenty-six aircraft and crews were offered for operations, but only twenty three were required and these took off at approximately 17.30hrs to attack military objectives in COLOGNE. All but one bombed their primary targets, "Q" (F/O Allen) having to return early with his port outer engine unserviceable. The attack is considered by all crews to have been most successful.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 17,000 ft at 21.02hrs F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Cologne (31 Oct 1944 - 31 Oct 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 31 Oct 1944 31 Oct 1944 N Twenty-four aircraft and crews were accepted and briefed to attack military objectives and communications at COLOGNE once again. Opposition was reported to be very moderate and the weather reasonably good. Once again crews participating considered this to have been a highly successful attack.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,000 ft at 21.10hrs

Operation/Target: Dusseldorf (02 Nov 1944 - 03 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dusseldorf 02 Nov 1944 03 Nov 1944 N Twenty seven aircraft and crews took off at approximately 16.00hrs to attack DUSSELDORF the leading commercial city of Western Germany and has exceptionaly good transport facilities both by railway and river. As a supply and concentration base for the Western Wall (Rhineland edition) it is therefore an excellent centre to eliminate. Enroute to the target the weather was good but cloudy which however cleared at 0500, leaving the target clear with bright moonlight and good visibility. Ground markers were punctual and clearly visible, placed accurately in the Marsalling yards area and very quickly a concentrated cloud of bomb smoke developed. This was added to in the later stages of the attack by the incendiary aircraft and the crews were enthusiastic about the fires which quickly took hold and emitted a rosy glow seen for almost 100 miles on the return journy. In addition light explosions were observed. Flak was reported as light at first in a barrage later increasing to intense. Night fighters also put in an appearance, all our Air gunners were on the qui vive and successfully beat off any interference from them. Photographs taken and brought back show extensive fire tracks and enthusisatic verbal reports from the aircrews show that the attack should be yet another outstanding success. It is regretted that F/Lt Foster and crew failed to return to base, nothing being heard of them since take-off. Congratualtions were extended to F/L Rose and crew on completing an excellent tour.

[Ed: see also the 4th Nov entry below, which refers to the 100th op of ED905 with F/Lt Shaw at the controls. But in fact it appears likely that 100th op occurred today 2nd Nov. rather than 4th Nov. Full details and supporting evidence in the 4th Nov entry below.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,000 ft at 19.26 hours

Operation/Target: Bochum (04 Nov 1944 - 04 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Bochum 04 Nov 1944 04 Nov 1944 N Twenty six aircraft and crews took off at approximately 17.15hrs to attack BOCHUM in the heart of the Ruhr. Aircraft "G2" (F/O Kennedy) soon after take-off found that his hydraulics were u/s and his wheels would not retract completely; thwarted in his efforts to jettison he made a successful landing at Woodbridge with all his bomb load on board. "E2" (F/O Marriott) found that the rear turret of his aircraft was u/s with an oil leak and abandoned. The remainder found 9/10 cloud en route, but over the channel this decreased and gradually cleared. The target was free from cloud, but a certain amount of industrial haze was present. Markers were punctual and fairly accurate, the target area was kept continuously marked and the bombing was well concentrated, After the incendiary attack developed, the whole area rapidly became a mass of fire, visible for approximately 100 miles and there were a number of impressive explosions. The ground defences in the target area were reported as moderate, occasionally becoming intense, with many searchlights in evidence exposing on cone of about 20 or more, there latter were at first ineffective, but later became more troublesome, several aircraft being coned. Hun night fighters made a strong reaction and figher flares were seen from the Dutch coast onwards. Many combats took place in which the following aircraft of 550 Squadron were involved, "B2" (F/O Whynacht) had 4 encounters and claims to have destroyed 2 aircraft and damaged another, whilst the other was inconclusive. All these appeared to be jet-propelled aircraft. No damage or casualties were received. "M" (F/O McCarthy) and "P" (P/O Franklyn (R)) both opened fire on two jet planes but no claims were made and the encounters were inconclusive. "V" (F/O Blackler) claims to have shot down an aircraft believed to be a jet propelled unit. The appearance of jet propelled and other rocket phenomena is only of recent origin, and these claims are being further investigated, meanwhile these claims are accepted with reserve. All our aircraft returned to Base with the exception of "F" (F/O Ansell) who landed at Manston having received damage to his aircraft from Flak, the F/Eng (F/S Sythes) receiving wounds in the thigh. Photographs brought back show extensive fire tracks. Aircraft "F" completed her 100th operational sortie, a fact that F/L Shaw is very proud of, since he has completed the major part of his tour in this aircraft.

P.R.U cover now confirms the great damage done in this attack - the two main factories of first priority importance, with extensive blast furnaces, steel works and rolling mills all making armaments have suffered severely; of the six main buildings of one of them all are extensively damaged. A third factory (adjoining the main passenger station which is heavily damaged) manufacturing, milling and grinding machinery is still smoking and damage appears to be heavy. Destruction of unidentified industrial and commercial premises, and residential property is widespread and severe.

[Ed: Can this entry (above) about Shaw/ED905 be correct? The battle order lists F/O W J Shaw in "F2" flying, but no F/Lt D A "Jock" Shaw in ED905 "F". Norman Franks in "Ton-Up Lancs" speculates, based on photos and the mixed up ORB at this point, that the ED905 100th trip was F/Lt D A Shaw 2nd Nov 44 to Duesseldorf. This looks to be confirmed by Jock Shaw log book (information from his daughter). So perhaps the ORB just recorded this information a day or two after the fact. The photo claimed to be ED905 taking off for 100th op may in fact be a photo of the aircraft some weeks earlier; some of the people waving have been positively identified (by John Eppel, Nav F/O J Harris crew, Catherine McIntosh (daughter of F/Lt "Jock" Shaw) and Jenny Dias daughter of Bryan Barby) as being air-crew who were in fact airborne, or taxing for take-off, for the 2 Nov op so could not be standing at the end of a runway waving other crews off!]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Abortive - Rear turret u/s

Operation/Target: Gelsenkirchen (06 Nov 1944 - 06 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Gelsenkirchen 06 Nov 1944 06 Nov 1944 N Twenty three aircraft with crews took off at approximately 11.00hrs to attack GELSINKIRCHEN 7 miles NE of Essen. The object of this attack was to dislocate the Huns transport facilities by bombing the very large marshalling yards. The weather at the target was 6/10 - 8/10 cloud with a convenient gap for the early arrivals who were able to identify the target area visually, as well as see a few TI markers, marking the A/P. The attack opened a few minutes early, but the later aircraft found the cloud rather too much for accurate bombing and with the M/C giving them instructions to seek their own A/Ps the end of the attack became somewhat scattered. However a good concentration of early bombs were dropped around the A/P and much smoke and later incendiaries with the large fires burning were seen. Flak was moderate to intense throughout the route through the Ruhr, from Duisburg onwards, although it varied greatly as to different aircraft: "E" (F/O Whynacht) receiving flak damage in the fuselage, bomb doors and two radiators. No enemy aircraft were seen, so the figher cover appeared to be adequate. "H" (F/O Bond) found he had no brake pressure on retun so landed without trouble at Carnaby. "M" (F/O McCarthy) did not return and no news was received from him after take off.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 18,000 ft. at 14.02 1/2

Operation/Target: Wanne-Eikel (09 Nov 1944 - 09 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 09 Nov 1944 09 Nov 1944 N 23 aircraft and crews from 550 Squadron together with one aircraft from each of 166 and 103 Sqdns took off at approximately 07.20hrs to attack the synthetic oil plant at WANNE-EIKEL 2.5 miles NW of Bochum one of the lesser known towns of the Ruhr but nevertheless important since it forms part of the general Ruhr network of railway and marshalling yards. The take-off was good as was the weather up to the French coast after which the crews encountered cloud banks and when the target area was reached there was thick cumulous at 20,000 ft with layer cloud below. Only one aircraft E2 (F/O Stevenson) had a fleeting glimpse of the target, and but for navigational aids the raid would have dissolved itself into a veritable blind mans buff. With such conditions existing it is impossible to assess the success or otherwise of the operation. Flak was scattered and erratic, and the fighter cover of Spitfires and Mustangs kept enemy fighters out of harms way. All our aircraft returned safely and the boys enjoyed a late lunch.
Station Summary
OPERATIONS
At first light 25 aircraft took off from NORTH KILLINGHOLME (comprising 23 of 550 Squadron and 1 of 166 Squadron and 1 of 103 Squadron, the latter having landed here from training) to attack WANNE-EICKEL, as part of a No. 1 Group force of 233 aircraft. All out aircraft returned safely having claimed to have bombed the target.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 15,000 ft at 10.48

Operation/Target: Dortmund (11 Nov 1944 - 11 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 11 Nov 1944 11 Nov 1944 N The Squardon dispatched 21 aircraft and crews to attack the north eastern part of the city of DORTMUND where synthetic oil plants, steelworks, coke ovens and a by-products plant with the usual marshalling yards were situated. The take-off was as usual good and once again the crews ran into 10/10 cloud when nearing the target. However with the exceptions, ground markers were vaguely seen reflected on the underside of the clouds and were systematically bombed. Assessments of results are difficult but several reports were made of large explosions in the target area and it is hoped good results were achieved. Flak was generally described as slight to moderate "G" (F/O Young had the fuselage holed rendering the rear turret u/s fortunately there were no casualties.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 16,000 ft at 19.05

Operation/Target: Duren (16 Nov 1944 - 16 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duren 16 Nov 1944 16 Nov 1944 N 26 aircraft and crews took off in the usual Squadron style at approximately 12.30hrs to attack DUREN in close support of the advancing American armies. The weather was hazy over Duren but not unkind to our bomb aimers, who thanks to magnificient marking were able to confirm their visual observations and follow the precise instructions of the Master Bomber. The railway complex at this small town, where the line east of Aachen forks to Dusseldorf and Cologne was the aiming point for our aircraft who contribured to the moderate force. Their bombing photographs and visual reports both point to the exceptionally successfull effort which appears to have been repeated on the Command's simultaneous targets at Julich and Heinsberg. Handicapped by the lack of warning, enemy fighters were again absent. Moderate Flak at the target gave an unlucky break to "M2" (F/O George) which was unable to release its bombs due to damage, which amongst other things severed electrical connections. One of the other things was a punctured tyre, in spite of which the pilot landed his aircraft safely at Base on return with a full bomb load. From a gratifying selection of good bombing prints that of "A2" (F/O Shenker) has been chosen for the C in C's enlargement. Plottings are generally well on the mark.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 10,000 ft at 15.30

Operation/Target: Wanne-Eikel (18 Nov 1944 - 19 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Wanne-Eikel 18 Nov 1944 19 Nov 1944 N The Squadron dispatched 29 aircraft and crews at approximately 15.30hrs to attack a synthetic oil plant at WANNE-EIKEL west of Gelsenkirchen. Soon after take off the crews encountered cloudy weather over England which however cleared across France; shortly after crossing the Rhine a thin layer of stratus cloud with tops at approximately 8000 ft and similiar conditions prevailed over the target area. Although few crews were able to see ground details, the cloud was thin enough for the markers to show through and for the most part a concentrated supply of them was available. Bombing was reported to have been well concentrated around the markers and very early in the attack a large fire developed which, from the column of black smoke which arose it would seem likely that the oil plant was successfully hit. Numerous orange coloured explosions were seen during the course of the attack two which occured at 19.20 and 19.23 must have been particularly large as some of the crews clearly saw the glow when 40 miles away in the homeward journey. Flak was reported to be only slight to moderate in the target area. There were some fighters seen and a few enemy fighters appeared to be about, but our aircraft had no encounters. With the exception of one, all our aircraft attacked the primary target. "C" (F/O Smith) had trouble with a coolant leak in the port inner engine after feathering it and being able to get above 10000 feet he had to abandon just S.E. of Brussels, jettisoning some of his bombs off the East Coast in the permitted area and landing with the remainder. Owing to the deterioration in the weather only 9 aircraft landed at Base, the remainder landed at Stations in the diversion area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 18,500 ft at 19.06

Operation/Target: Aschaffenburg (21 Nov 1944 - 22 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Aschaffenburg 21 Nov 1944 22 Nov 1944 N The Squadron dispatched 26 aircrarft and crews to attack the marshalling yards at ASCHAFFENBURG. The take off at 15.45hrs was good and without incident. Once again the weather denied crews the satisfaction of even seeing the target or assessing results. En route conditions were good, but over France cloud built up and the Master of Ceremonies and his deputy appeared to be going into a "huddle" to decide exactly where the target was. A small break did reveal markers and these were confirmed to be well placed and were bombed. Following aircraft were assisted by a red glow beneath the clouds and several explosions were reported. F/O Stevenson and W/O Hopman with their crews completed there first tour of operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 13,500 ft at 19.19 F/O I A Stevenson (P)
Sgt W T Woodhams (F/Eng)
F/Sgt D T Morrison (Nav)
F/Sgt W W Fitch (A/B)
F/Sgt E N Pearson (W/Op)
F/Sgt M O Olsen (MU/AG)
Sgt C Cowperthwaite (R/AG)

Operation/Target: Freiburg (27 Nov 1944 - 27 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Freiburg 27 Nov 1944 27 Nov 1944 N 31 aircraft and crew were dispatched to attack the town of FREIBURG with its associated rail facilities at approximately 15.45hrs. The target was a small one, only approximately 2 miles by 1 and 1/2 miles, and the attack was entrusted to No. 1 Group to accomplish. With every Squadron putting out it's largest numbers, a new record was accomplished with over 300 aircraft and of these all successfully attacked the primary target, except one which was abortive. 550 Squadron accomplised their best performance to date with 31 aircraft off, 31 attacking the target and 31 aircraft returning to Base. After a smooth take-off and an uneventful journey across Allied held France, our crews found that the P.F.F. had prepared a "bang on" show for them. In spite of considerable thick stratus cloud and base well below, markers were being dropped punctually, and in great profusion while the Master Bomber had his finger "well out" and was giving clear and concise directions with machine gun rapidity. Nearly all our crews bombed on ground markers seen through the haze, although two of them took advantage of sky markers which were also dropped. The cloud base prevented the results from being reported as spectacular as they almost certainly were underneath, but the bombing appeared to be concentrated and a satisfactory fire glow soon developed by the light of which later crews were able to see a large church and streets outlined as the looked obliquely under the large pall of black smoke that soon arose. Flak was light and spasmotic, with no searchlights and none of our aircraft was hit. In fact, what "hit" most of them, was the sight of the lights of the Swiss Town of Basle "Like Piccadilly used to be, I suppose" as one Australian Navigator said, and the misty splendour of the misty Alps in the moonlight.
Postscript message from A.O.C. No. 1 Group: "Last night we operated, in all, 312 aircraft with only one abortive sortie and one aircraft missing. Please give my congratulations to all ranks for this magnificent record, which has never before been approached by any Group. It was a splendid achievement by both air and ground crews. All attacks were highly successful".
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 12,000 ft at 20.06

Operation/Target: Dortmund (29 Nov 1944 - 29 Nov 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 29 Nov 1944 29 Nov 1944 N 30 aircraft and crew were dispatched to attack DORTMUND. All successfully took off at approximately 11.20hrs, but the weather conditions over the target left much to be desired. Crew reports agree that after a precessional approach through the flak-strewn corridor to the target area, leading sorties arrived somewhat early to find that cloud and haze barred all but a fleeting glimpse of the built-up area and precluded effective pinpointing. The markers appeared to have been widely scatted and the Master Bomber's guidance could hardly have beeen described as inspiring. In the circumstances our sorties endeavoured to bash the bashful marker while others set off in search of built up areas. "C (F/L Maclachlan) and "L2" (F/O Williams) both claim to have bomber red markers. Pressing on, our "E2" (F/O Dale) found himself well past the target area without sighting a worthwhile objective, plain or coloured. Nothing daunted he attacked the centre of Munster and brought back a photograph to prove it. Meanwhile "W" (F/O Adams) losing height on three engines had barely reached the Rhine when prudence counselled an alternative target which he chose at the village of [STEMMELN], where a train on the main line appears in his photo to have had a clean shave. Both these lone wolves brough mementoes of flak opposition at and around their target. All out sorties returned safely, including "P" (F/O Summons) which after colliding with another aircraft en-route to the target, was coaxed on its two port engines alone through a gauntlet of flak towards Dusseldorf. Good airmanship and richly deserved good luck (which unhappily deserted the other victim - an aircraft from a sister Squadron) brought the unfortunate episode to a safe finish for F/O Summons and his crew. Losing height and weaving as much as it dared "P" presented a sitting and solitary target for Jerry's guns. A run was made on a built up area, where in far from ideal conditions the bomb-aimer declared his entire load - minus one bomb-tail - well and truly laid ... a truely remarkable performance, as was disclosed on subsequent inspection of the mangled bomb-bay. Thereafter, losing height on a "Home James!" course, and escorted on the finishing straight by a Spitfire, "P" touched down at Mansten with a dignity that belied its crumpled propellers and disembarked its crew entirely unscathed.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Secondary target (Munster) at 20,000 ft at 15.08. Hit by H/F. Flak batteries (6 1/4, H2S, Gee, R/T and rear turret rendered u/s).

Operation/Target: Karlsruhe (04 Dec 1944 - 04 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Karlsruhe 04 Dec 1944 04 Dec 1944 N 24 aircraft and crew took off at approximately 16.30hrs to attack the town and railway facilities at KARLRUHE. The crews has an uneventful but rather long trip over Allied Occupied Territory and found the target covered with 9/10th cloud. On approach some crews were able to identify the Red and Green T.I.s below cloud, which were rather scattered. The cloud rapidly moved eastwards and some of the later arrivals were able to identify the town visually. From reports it is gathered that good fires were started in the town, the glow of which could be seen for over 100 miles. Opposition from the ground consisted only of slight flak for the most part bursting well below the aircraft. All our aircraft returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 19,000 feet at 19.36 hours.

Operation/Target: Merseburg (06 Dec 1944 - 07 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Merseburg 06 Dec 1944 07 Dec 1944 N 30 crews briefed and took their aircraft off at 16.35hrs without incident to attack the synthetic oil plaint at MERSEBERG. The target was the LEUNA chemical works, one of he largest plants in Germnay, covering an area of 1 1/4 sq miles, and employing some 50000 workers in the manufacture of ammonia, fertilisers, chemicals, synthetic oil and other products. Truely a "chemical hot bed". The customary 10/10 cloud again persisted and bombing was carried out on flares. The glow of fires was visible for some distance on the return journey and several explosions were reported. Owing to the density of the cloud photographs proved useless and the report of our P.R.U colleagues are awaited with interest. Flak was reported as being moderate to intense. Little training was carried out owing to the lack of aircraft. From this operation F/L Morris and crew failed to return.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Abortive - Rear turret u/s

Operation/Target: Essen (12 Dec 1944 - 13 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 12 Dec 1944 13 Dec 1944 N 25 aircraft and crews took off without incident at 16.00hrs to attack ESSEN. The journey out proved uneventful and the 10/10 cloud which greets us with almost monotonous regularity was again in evidence. Early crews saw sky markers up aloft, a situation which gave bomb aimers rather a headache, but aircraft arriving later did not have the same problem to solve and were able to bomb in the orthdox fashion. Observed results were confined to a red glow seen reflected on the underside of the clouds and three healthy explosions each of which lighted the sky for appropimately 30 secs. Photographs were unable to throw any light on the subject and so once again we shall have to await the accurate assessment of the result. Flak was light to moderate and later increased in intensity.
In addition to the operations 20.52hrs flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary 17,000 ft at 19.45 F/L L Dale (P)
F/Sgt R E Martin-Smith (R/AG)
Sgt D J McKinnon (F/Eng)
Sgt T M Cranitch (Nav)
F/L E R Mark (A/B)
W/O R J Davies (W/Op)
Sgt V P Halliday (MU/AG)

Operation/Target: Ludwigshaven (15 Dec 1944 - 16 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ludwigshaven 15 Dec 1944 16 Dec 1944 N 30 aircraft and crews took off at approximately 14.20 without incident to attack LUDWIGSHAVEN paying particular attention to the chemical works situated on the northern outskirts of the town and extending for approximately 3 miles to the village of Oppan. There was rather more cloud than expected over the route which compelled many crews to fly and to attack from greater heights than intended. The first wave crews were there even before the first pathfinders target indicators, a number of them therefore bombed on navigational aids or on E.T.A. whilst others orbitted thje target until the markers were dropped. A good deal of early bombing was consequently scattered over a wide area as the markers appeared a very good concentration indeed developed. Last crews reports large fires with great volume of smoke. Several photographs brought back confirm the concentration of fires around the markers but ground detail is not good enough to enable their exact location to be plotted. Flak was reported as being considerable, and searchlights very active. The Squadron were to contribute 20 aircraft for this attack. Soon after take off, two aircraft were seen to be having trouble which it was believed might have prevented completion of the sortie, so both reserve aircraft also took off making the Squadron total 30 aircraft, and all of them carried out successful sorties. F/L Pyke "E" had an engine go u/s on the outward route but pressed on regardless to the target and home on three. A/S/L Redmond "R" could not retract one leg of the aircraft undercarriage after take off, he also completed the round trip with a swinging leg.
S/L Redmond on this trip completed his second tour oof operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 16,000 ft at 18.29 1/2 F/L L Dale (P)
F/Sgt R E Martin-Smith (R/AG)
Sgt D J McKinnon (F/Eng)
Sgt T M Cranitch (Nav)
F/L E R Mark (A/B)
W/O R J Davies (W/Op)
Sgt V P Halliday (MU/AG)

Operation/Target: Ulm (17 Dec 1944 - 18 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Ulm 17 Dec 1944 18 Dec 1944 N 29 crews were briefed to attack the rail junction at ULM situated some 100 miles inside the German frontier on the banks of the Danube. Heavy cloud compelled low flying for most of the way, but in the target area there was little more than thin stratus which did not prevent ground markers from being seen through it. The Master Bomber' assessment of the situation however was that the best results were likely to be produced from aiming on the well placed and plentiful sky markers and ordered bombing accordingly. A very good concentration of fire developed, with a number of spectacular explosions occuring among them. Defences were meagre and there were no searchlights active.
S/L Caldow "B" was unlucky - one of the few flak bursts over the target hit one of his aircrafts fuel tanks, which promptly emptied, the tailplane, elevators damaged and one of the aerials shot away which did not interfere with a safe return and landing at Base. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 11,000 ft at 19.33 1/2 hrs

Operation/Target: St. Vith (26 Dec 1944 - 26 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
St. Vith 26 Dec 1944 26 Dec 1944 N The Squadron was called upon to operate, but with the majority of the Squadron still grounded at Wendling, and presumably nursing an Xmas "hangover", all the Squadron would offer was nine aircraft in an attack called from all groups on the railhead town of St. Vith, just inside Belgium on the northern side of the German advance, and was being used as a re-training centre for Panzer troops from rearward areas. Visibility was still in the visinity of 600 yards at the time of take off, but improved over the North Sea. The Continent was free from cloud and in spite of slight haze, visibility was good and the crews were able to map read and identify the target visually with ease. An excellent concentration of bombing was achieved, two large explosions were noted, one in the town and one on the railway to the N.E. Opposition was negligible except from positions behind the enemy lines on the run up to the target. No trouble was experienced from enemy fighters. Photographs brought back were excellent and showed a good concentration of bombing. F/O Williams brought back a "gem" of a photo which was enlarged for the Commander-in-Chief to see. All aircraft were diverted to R.A.F. WALTHAM.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 10,500 ft at 15.33 hrs

Operation/Target: Rheidt (27 Dec 1944 - 27 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Rheidt 27 Dec 1944 27 Dec 1944 N 9 aircraft which had been diverted to Waltham and Ludford Magna took off from their diversion stations to attack the marshalling yards at RHEIDT, lying as it does to the west of the Ruhr and Rhine, this centre is vitally important at the moment to the Hun for conveying his troops and materials from the Ruhr and Central Germany. Shaking off the fog the crews found the French Coast and Continent clear except for slight ground haze. The target was easily identified in good visibility and the first T.I.s cascaded on the northern end of the marshalling yards followed by others which were "dead on" the aiming point. The bombing thus was very concentrated and accurate, the target soon became enveloped in smoke, rising many thousands of feet in the air. One particularly large explosion was seen in the marshalling yard, possibly ammunition waggons. Flak was negligible over the target, but some aircraft were engaged by heavy flak north of the target. No enemy fighters were seen. On the return the weather was still in its "pranky" mood and all aircraft were again diverted, this time to Finningley. No flying training was carried out from Base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 20,000 ft at 15.01 hrs

Operation/Target: Scholven-Buer (29 Dec 1944 - 29 Dec 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Scholven-Buer 29 Dec 1944 29 Dec 1944 N 22 aircraft with crews took off without incidient at 15.00 hours to attack synthetic oil plants at SCHOLVEN-BUER approximately 7 miles north of Gelsenkirchen. At the target 10/10 thin cloud was met but this did not, however, prevent the target indictators from being well seen. Bombing quickly became concentrated round the markers, and almost immediately a very large explosion was seen, and resulted in thick columns of black smoke rising through the clouds. Several good fires developed and explosions were continuous until the last aircraft left. The defences of Cologne, Bochum, Gelsenkirchen and the Essen district were very active but not over the target itself. Cloud prevented ground detail coming in the photographs brought back, but in many of them, the fires and explosions show most encouragingly. It is thought that the attack was a success and all aircraft returned safely to base. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,000 ft at 19.04 hrs F/O G E Mearns (P)
Sgt F Norris (F/Eng)
F/Sgt W G Kelly (Nav)
Sgt J F McKeen (A/B)
Sgt D O'Neil (W/Op)
Sgt J Chamboly (MU/AG)
Sgt A G Slater (R/AG)

Operation/Target: Nuremburg (02 Jan 1945 - 02 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremburg 02 Jan 1945 02 Jan 1945 N 29 aircraft with crews, plus 2 crews and aircraft from No. 166 Squadron, were briefed to attack Nuremburg. Thirty aircraft took off at approximately 15.00 hours without incident. F/O Summons failed to take off owing to his navigator having met with an accident whilst proceeding to the aircraft. Also one complete crew was sent to R.A.F Elsham Wolds and took off from there to participate in the operation for No. 103 Squadron. The crews found the weather to be cloudy over England, and the Channel, and the Continent as far as 700degrees[???] East. From thence it gradually cleared and at the target conditions were excellent with only a slight ground haze and the built up area contrasted sharply with the snow covered countryside. Owing to the prevailing winds, aircraft arrived early in the target area and some aircraft orbited awaiting the Pathfinder marking. The attacks opened a few minutes early and the first ??? of mixed Red and Green Target Indicators were seen to fall across the Marshalling Yards in the [???] of the town. Excellent concentrated bombing developed, numerous explosions took place, and the glow of the raging fires could be seen 150 miles away by the crews on their return journey. A reconnisance aircraft flying over the target after the attack reported three large area of solid fires to the N.N.W. and one to the S.E. with many smaller ones over the whole area. One aircraft "E" (F/O Smith) developed an oil leak in the port inner engine whilst over France. Correctly following instructions he sought out and found an alternative target, that of the town of Pforsheim, some 25 miles north of the route, lying between Karlsruhe and Stuttgart. The ground defences consisted of slight heavy flak and numerous searchlights, but all ground opposition rapidly decreased as the attack developed. Excellent photographs brought back prove conclusively that the attack was excellent. No flying training was carried out owing to the aircraft being used for operations, but a programme of ground training was carried out by the crews not engaged on operations.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 18,000 ft at 19.39 hrs

Operation/Target: Hannover (05 Jan 1945 - 06 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hannover 05 Jan 1945 06 Jan 1945 N 24 aircraft with crews took off at approximately 19.00 hours to attack HANOVER. The weather was nowhere difficult on route and our crews were led visually to the target by means of it's "Blaze of Glory" that could be seen for a hnudred miles, this blaze had been started by an earlier attack two and a half hours before by [unreadable]. Our attack was to impede the fire fighters and add more fuel to the fires. The [???] was blazing beautifully and the second installment of H.Es and incendiaries was added to the [???]. Fires and smoke increased and could be seen by our crews when over the Zuider Zee on their return. Good photographs were brought back. Flak was reported generally as moderate, but accurate for height and there was searchlight activity, although with the glare of Recc. flares above and the fire glow below they had a pretty thin time. The attack was an outstanding success and Hanover now has a hangover. One of our aircraft "M" (F/O Adams) and crew failed to return, no news being received after take-off. They were a grand team and will be missed by all on the Squadron. A good flying training programme was also carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 21,000 ft at 21.52 1/2 hrs

Operation/Target: Leuna Oil Plant (14 Jan 1945 - 15 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Leuna Oil Plant 14 Jan 1945 15 Jan 1945 N After a week of enforced flying inactivity, the Squadron stood by for operations with 30 crews of which one complete crew was sent to R.A.F. Station, Kirmington and one to R.A.F Station Elsham to make up operationally fit crew members on these stations. F/O Cameron departed from the Squadron on posting to No. 1656 Heavy Conversion Unit, Lindholme, as an instructor. F/O Cameron had completed a very successful tour with the Squadron and was very popular with all members of the Squadron, who regret his going.
27 aircraft took off at approximately 19.00 hours to attach LEUNA synthetic oil plant near Merseberg. "N" (F/O Parsons) proved abortive owing to the unfortunate illness of one of the crew and returned to Carnaby. The remaining 26 "pressed on regardless", led throughout by the indefatigable "F" Fox. The captain F/Lt "Jock" Shaw has at last been compelled to call it a day with a grand total of 42 operations. Higher authority this time refused his application to continue on Ops much to the disappointment of Jock. The weather on route was fairly good but deteriorated at the target to 10/10 cloud. Bombing was by sky-markers and conditions prevented results being observed. Defences were active. None of our aircraft were damaged and returned safely to base. Flying Officers Harris and George completed their first tour of operations without a single abortive. No flying training was carried out.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 19,000 ft at 23.58 1/2 hrs

Operation/Target: Zeitz Oil Plant (16 Jan 1945 - 17 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Zeitz Oil Plant 16 Jan 1945 17 Jan 1945 N 26 aircraft 2 reserve aircraft and crews stood by for operations. The crews were briefed and 28 aircraft took off without incident at 17.30 hours to attack the synthetic oil plant at ZEITZ, situated some 20 miles south of Leipzig. "E" (F/Lt Pyke) had a somewhat "dicey do" soon after take off and while climbing over base the port outer engine caught fire; unable to extinguish it or feather the airscrew, F/Lt Pyke proceeded out to sea to jettison his bombs and do it quickly as the fire threatened to get out of hand. However, all went well for the fire went out soon after recrossing the coast and landed safely. The weather was as per forecast and gave no trouble. On arrival at their distant target they found clear weather and good visibility. The bombing was highly oncentrated on the centre of the target. 9 major explosions and one really super explosion which belched forth flame and black oily smoke were seen, The crew were really enthusistic and highly satisfied with their night's work. The defences and night fighters were very active, but all returned safely to base.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 16,500 ft at 22.16 1/2 hrs

Operation/Target: Hamborn (22 Jan 1945 - 22 Jan 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hamborn 22 Jan 1945 22 Jan 1945 N 27 aircrews were briefed at 08.45 hours and were in thair aircraft ready for action. The Squadron was to be led by the Station Commander G/Cpt McIntyre, but the intended operation was once again cancelled owing to adverse weather en route and over the target. Needless to say the boys were very disappointed for they all, without excpetion, thoroughly enjoy a daylight operation. A good training programme was laid on but had to be cancelled owing to the Squadron having to prepare for another operation for which 31 aircrews were briefed at 14.30 hours and successfully took of at approximately 16.45 hours. Although take off was good, it needed all the pilots skill to successfully accomplish the feat. The runways were on the treacherous side in spite of the amount of time and effort spent on clearing snow and spreading salt and sand. Watching take off my heart momentarily stood still a few times, severlal aircraft when about to become airbourne had a tendancy to swing sharply to starboard which looked decidedly dangerous.
The Squadron was led by Squadron Commander W/Cdr Bryan Bell (Dingle) to attack the steel works at HAMBORN, the northern suburb of Duisburg. F/Lt Summons in "Q" returned early with C S U(?) trouble, but the remaining 30 had a very successful party. The target was clear of cloud, the marking was accurate and bombing concentrated. Several fires were started and explosions reported, one very impressive and 37 minutes after "N" hours. At the end of the attack the target was covered by a thick pall of smoke. Ground opposition was only slight and fighters little in evidence. All returned safely and unscathed to Base. Photographs brought back show excellent results. F/Lt Shenker and F/O Bell with their crews completed their first operational tours on the high note of this most satisfactory operation.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 19,000 ft at 20.07 hrs

Operation/Target: Mannheim-Ludwigshafen (01 Feb 1945 - 02 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim-Ludwigshafen 01 Feb 1945 02 Feb 1945 N After 10 days of enforced idleness due to excessive weather conditions the Squadron was called up on to supply 29 aircraft and crews plus two aircraft and crews in reserve to attack the rail centre and marshalling yards in LUDWIGSHAVEN. 30 aircraft successfully took off at approx. 1530hrs The weather on route was rather mixed from 10/10 cloud to clear conditions over the Channel well broken cluid over the Continent until the target 10/10 cloud built up about 5 miles hort on the run in. On the return very turbulent conditions were encountered crossing the North Sea to the Norfolk Coast. At the target both ground and sky marking was resorted to by the PFF but with the target indicators disappearing into the low cloud and some of the sky markers being too high for easy aiming, bomb aimers had rather a difficult time. Results were very obscure, there was however a very encouraging incendiary glow that developed into a compact fire mass with two explosions. From the H2S photographs brought back, it is thought that there was a tendency to undershoot. Flak was reported as slight, later decreasing to give way to night fighter activity. Night fighters were more active than usual and several combats were observed.
F/L Maltin and his crew completed their second tour and F/L Doward and his crew completed their first tour of operations successfully. F/O Lohrey and his crew failed to return and it was at first reported as missing but later it was learnt that at least five of his crew, including himself, were safe in Allied Territory, after having been forced to abandon their aircraft which had been badly damaged colliding with a friendly aircraft near the target area.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned -

Operation/Target: Politz (08 Feb 1945 - 09 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Politz 08 Feb 1945 09 Feb 1945 N The Squadron stood by for a skylight operations, which was however cancelled at approx. 13.30hrs presumably owing to adverse weather. 28 aircraft were later called for an attack on a synthetic oil plant at POLITZ 3 miles north of Stettin. Owning to mechanical defects developing at the last moment only 24 aircraft took off at approx. 19.00hrs. The weather along the unfamiliar route fufilled our worst suspicions, but on approaching the Reich the waether improved considerably and the target area was found to be practically free from cloud, consequently the flares and markers were dropped punctually and accurately. The target had been attacked two hours earlier and the fires started were still visible and our boys brigthened them up considerably. Many explosions were seen and a particularly vicious one at 23.17hrs which lit up the whole area and was said to have been the best ever. All our aircraft returned safely although one, F/O Parsons in "N" landed at Carnaby with defective hydraulics. Good photographs were obtained. F/O Lohrey and four members of his crew who baled out after their attack at Ludwigshaven on the 1st Feb returned to the Squadron.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 14,000 ft at 23.15 hrs

Operation/Target: Chemnitz (13 Feb 1945 - 14 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Chemnitz 13 Feb 1945 14 Feb 1945 N 22 aircraft and crews were briefed, and successfully took off at approximately 20.00hrs to attack CHEMNITZ the Bradford of Germany with important rail junctions through which reinforcements from the west, country and southern Germany would have to pass on their way to the Eastern Front. The weather was good over England but deteriorated on approaching the target which was found covered with 10/10th cloud with tops up to 18,000 ft. Markers could not be seen and crews were instructed to bomb on Navigational aids. The concensus of opinion seemed to be that the attack was rather scattered. An aircraft that had bombed however went below cloud and reported that the southern part of the town was burning but the northern part was untouched. Flak was slight and there were no searchlights. Photographs reveal nothing. All aircraft returned safely to base after their nine hours trip.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 20,000 ft at 00.32 hrs

Operation/Target: Dortmund (20 Feb 1945 - 20 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 20 Feb 1945 20 Feb 1945 N 27 aircraft and crews took off without incident to attack once again the heavy engineering manufacturing town of DORTMUND. F/O Ferguson in "L" unfortunately returned early with his starboard inner engine u/s. The remaining aircraft found good weather along the route until approx. 0530 degress E when a low layer of thick cloud gradually built up to 4000 feet, until at the target the markers were barely visible as they dropped into it. The marking was punctual and an adequate number of ground markers, as well as some sky markers were dropped, However, the latter were somewhat scattered and although some encouraging concentrations of incendiary and fire glows were seen indistinctly under the cloud, the illuminating explosions, there was quite a lot of scatted bombing and it must only be considered, from first accounts, as a moderately successful raid. Ground defences were reproted as being only slight to moderate in a loose barrage, with one or two aircraft receiving some predicted attention. Night photographs show a good diplay of incendiary and fire tracks, but clouds have again prevented only plotting. Good shows were put up by F/O Franklyn in "G" who had his port outer engine u/s and had to feather it when over the Bexhill area on the outward journey. F/L Dale in E2 (taking F/L Sarll and crew on their initial operation) had trouble with his port outer engine which was u/s from 0500 degrees outward forcing them to bomb at 13,000 feet. F/O Mearns also had trouble with his starboard outer engine which was partially u/s for the trip.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 13,000 ft at 01.16 hrs

Operation/Target: Pforzheim (23 Feb 1945 - 24 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pforzheim 23 Feb 1945 24 Feb 1945 N 27 aircraft and crews were called for to attack PFORZHEIM and took off at approx. 16.00hrs without incident. Weather at take off was 10/10 low cloud down to 600 ft, but broke up over the continent and the target was quite clear, with some "dangerous moonlight". The markers were accurately placed and the bombing was correspondingly concentrated and the attack has every appearance of being a hightly successful one, fires could still be seen 150 miles away on the homeward journey. Very slight light flak was encountered over the target but night fighters were much in evidence. "C" (F/O Grundy) failed to return from this operation. F/O RD Harris in [NF998] despite a damaged port outer engine which caught fire over the target and severed tube caused by incendiaries, limped back and landed at Manston. One of the crew was injured but not seriously.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 9,000 ft at 20.00 F/L L Dale (P)
F/Sgt R E Martin-Smith (R/AG)
Sgt D J McKinnon (F/Eng)
Sgt T M Cranitch (Nav)
F/L E R Mark (A/B)
W/O R J Davies (W/Op)
Sgt V P Halliday (MU/AG)

Operation/Target: Meuss (28 Feb 1945 - 28 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Meuss 28 Feb 1945 28 Feb 1945 Y 27 aircraft and crews were detailed and took off without incident at approximately 08.00hrs to attack the railway centre at MEUSS and the river unloading port on the Western Bank of the Rhine just opposite Dusseldorf. The crews had been in the air little more than an hour when they were recalled. The operation was cancelled due to forecast cloudy conditions over the target area and the close proximity of our troops The boys were very disappointed to not be able to strike again at the common enemy.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Recalled

Operation/Target: Mannheim (01 Mar 1945 - 01 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Mannheim 01 Mar 1945 01 Mar 1945 N 26 aircraft with their crews took off at approximately 11.30hrs without incident to participate in a daylight attach on a large concentation of enemy troops reported to be in the vicinity of the Rhine bridgeheads near MANNHEIM. It was unfortunate that on this daylight raid the target was covered by 10/0ths could and results of our bombing could not be observed and assessment of the raid was not possible. Ground defences consisted of approximately a dozen bursts of heavy flak. The bombers were escorted by fighters who kept their opposite numbers out of sight. "K" (F/O Davidson) had a starboard outer engine catch fire and although losing height pressed on to the target bombed and returned safely.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 17,000 ft at 15.022 hrs

Operation/Target: Cologne (02 Mar 1945 - 02 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Cologne 02 Mar 1945 02 Mar 1945 N 26 aircraft with their crews took off at approximately 06.45hrs in the usual Squadron style to attack the approaches to the Rhine bridges at COLOGNE to prevent the retreating Huns from escaping to the east of the Rhine. For once the weather was kind. 5/10ths cloud was encountered until approximately 20miles short of the target which was clear. Visibility was good and crews had no difficulty in identifying the aiming point visually. Bombing was reported to be concentrated with a few hundred yards of aiming point. A generous fighter escort was supplied which discouraged the Luftwaffe from putting in an appearance. Flak over the target was moderate and accurate. Five aircraft from the Squadron were damaged. Photographs confirm that the aiming point was well and truly hit.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary, at 16,000 ft at 09.58 hrs

Operation/Target: Chemnitz (05 Mar 1945 - 06 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Chemnitz 05 Mar 1945 06 Mar 1945 N 26 aircraft, including the reserve, as it was apparant immediately after take-off that "E2" (F/L Dale) would be abortive with a port engine unserviceable, took off at approximately 16.45hrs as part of a force of over 700 Lancasters and Halifaxes detailed to attack CHEMNITZ. The trip to the target was without incident, with a layer of 10/10 cloud beneath most of the time. On reaching the target area it was quickly seen that the cloud prevented anything other the sky marking which was called for by the Master Bomber. His broadcasting was much distorted by static interference, but he was generally heard. The first release point flares went down 3 minutes before "H" hour; they were plentiful and well grouped but fell into the cloud tops rather quickly and later there was a gap when no flares were seen. Detailed results could not be seen but judging from the incendiary glow and the bursts of the cookies, bombing appeared to be concentrated. There was only very slight heavy flak over the target area, but the Leipzig defences were active and the night fighters were in evidence, both over the target and along the first two legs of the homeward route. Three aircraft reported combats but none claimed any night fighters destroyed. 22 aircraft landed safely at base; "J" (P/O Findlay) landed at Benson, "O" (F/O Harris) at Carnaby, with flaps unserviceable, and "F" (F/S Wilson) at Tempsford, with damage sustained in combat but no casualties.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Abortive - port engine u/s almost immediately after take-off.

Operation/Target: Dessau (07 Mar 1945 - 08 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dessau 07 Mar 1945 08 Mar 1945 N 27 aircraft took off at approximately 17.00hrs on operations, but not without incident. "E2" (W/O Lukies) proved most fractious. The starboard outer engine cut on take-off. The aircraft swung dangerously but the pilot by masterly handling avoided a hanger and other obstacles, proceeded to the jettison area and returned safely. The other aircraft set course on the long route to DESSAU. Cloud amounts variable. Opposition was lively, both from flak and night fighters, but the former was not so strong over the target. Some crews bombed ground markers through 3/10 cloud with a clear view of the town and River Elbe; others had to rely on sky markers owing to 10/10 cloud. General opinion was that the attack was well concentrated and that the target was set, well and truely, ablaze. "M" (S/L Pickles) had it's "Gee" unserviceable from Southern England outwards, but the crew pressed on and after some meandering found themselves near to the target. They bombed in solitary state, a healthy concentration of fires left by their comrades. Two crews reported inconclusive combats with night fighters. Three aircraft "V" (F/O Jones), "O" (F/O Harris) and "R" (P/O Nielson) failed to return and it was with deepest regret that they were reported missing. Nothing was heard from any of them after take-off. Three aircraft and crews carried out flying in training involving over 7 hrs flying.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Abortive - starboard outer u/s. P/O J Lukies (P)
Sgt W K Oldham (F/Eng)
F/Sgt L W Pfitzner (Nav)
F/Sgt R W Caples (A/B)
F/Sgt J W Foran (W/Op)
P/O H K Johnson (MU/AG)
Sgt J M Craine (R/AG)

Operation/Target: Kassel (08 Mar 1945 - 09 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Kassel 08 Mar 1945 09 Mar 1945 N The Squardon was again called to operate and 23 aircraft took off in quick time without incident at approximately 17.20hrs. The target was Kassel. All the aircraft bombed the primary target indicated including "H" (F/O Cowper) whose port inner engine caught fire and was feathered some 200 miles short of the target. 10/10 cloud covered practically the whole of the continental route, but was broken immediately over the target, which was clearly visible through only a thin layer. Bombing was heavily concentrated, the incendiaries tooks a firm hold and the resultant fire glow could still be seen when aircraft were crossing the Rhine over 100 miles away. Flak over the target was light to moderate and there was little sign of fighter activity - a happy contrast to the previous night's experience. All the Squadron's aircraft returned safely to base, where at interrogation the crews were sleepy but satisfied. One aircraft and crew completed a night flying training drill lasting 2 3/4 hrs
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 20,000 ft at 21.31 hrs

Operation/Target: Essen (11 Mar 1945 - 11 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Essen 11 Mar 1945 11 Mar 1945 N 20 aircraft and crews detailed and took off without incident at approximately 11.40hrs on a daylight sortie to Essen, now only some 14 miles ahead of our troops. A total of over 1000 aircraft took part in the attack delivering over 4500 tons of bombs. There was a level carpet of 10/10 cloud all the way out, over the target and back. Crews bombed on coloured smoke puffs assisted by verbal instructions form the Master Bomber. It was considered that the bombing was quite concentrated and very soon a protuberance in the shape of mushrooming fire smoke appeared, agitating the top layers of the cloud - evidently someting was burning down under. Flak was not very troublesome, being variously described as "nil", "very slight" and "slight to moderate". The Luftwaffe was absent. All the aircraft returned safely to base. 7 aircraft and crews carried out flying training to the extent of 24 3/4hrs flying. Day and night practice bombing, fighter affiliations and Y cross countries.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 17,500 ft at 15.03 hrs

Operation/Target: Dortmund (12 Mar 1945 - 12 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Dortmund 12 Mar 1945 12 Mar 1945 N 23 aircraft took off without incident at approx. 12.50 hours on what was in almost every respect a repetition of the previous days effort. The only difference, the target was DORTMUND. The colour of the sky markers was changed and the time of the attack about tea time, but the same big dome of dark smoke mushroomed up through the cloud tops. Flak was not up to the usual Ruhr standards, and the only fighters seen were our own, and so the raid appeared to be highly satisfactory. Our 23 aircraft returned to base and landed safely with no fuss or botther at all. The crews of F/O E. M. Smith and F/L Edlund completed their tour of operations with this sortie. Two aircraft and crews completed a flying training detail involving 9 1/2 hours total flying.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 19,000 ft at 16.36 hrs

Operation/Target: Herne Oil Plant (13 Mar 1945 - 14 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Herne Oil Plant 13 Mar 1945 14 Mar 1945 N The Squadron was required to provide 12 aircraft for a night attack on the Erin Benzole Plant at HERNE which is in the north central area of the Ruhr close to the Rhine-Herne canal. All 12 aircraft took off neatly and without incident at approx. 17.15 hrs. Patches of 4/10 Stratocumulus cloud with tops at 12000 ft were encountered all along the outward route over this country. After leaving the English coast the route was cloudless until reaching the Rhine were more stratocumulous formed and rapidly increased to 9/10 in the target area with tops 10/12000 ft. There was a considerable [amount] of haze over the whole route. Only ground markers were provided and these were obscured to a considerable extent by haze and cloud. As a result, a large number of crews had to bomb on navigational aids and whilst a fair concentration of bombing was achieved on the ground markers, there was a considerable amount of undershooting and overshooting and probably half the effort was wide of the target area. An encouragingly large explosion was reported in the target area; however, something must have gone up. Only moderate heavy flak was encountered over the target and searchlight illumination was not attempted. Jet aircraft were active over the target area but none of our aircraft were molested. All our aircraft landed safely at base and there was quite a series of celebrationbs as the following captains, F/O Summons, F/O Ferguson and F/L Rhude, had with their crews, all completed their tours.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 15,000 ft at 20.31 hrs F/L L Dale (P)
F/Sgt R E Martin-Smith (R/AG)
Sgt D J McKinnon (F/Eng)
Sgt T M Cranitch (Nav)
F/L E R Mark (A/B)
W/O R J Davies (W/Op)
Sgt V P Halliday (MU/AG)
F/O H J Handley (P)

Operation/Target: Nuremberg (16 Mar 1945 - 17 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nuremberg 16 Mar 1945 17 Mar 1945 N Squadron put 19 aircraft for operations. 18 aircraft took off; F/O Luder aircraft stayed on the ground with an unserviceable rear turret. The target was NURENBURG. Up to 10/10 cloud was experienced en route but this broke up to 4-6/10 in the targe area, over which there was a large gap giving a clear view of the ground markers, which were punctual and concentrated. The Master Bomber's instructions came through clearly. Fires got going quickly outlining the street patterns, finally merging into one large conflagration, the glow from which could be seen for 150 miles on the return journey. Flak defences were only slight to moderate with 15-20 ineffective searchlights which were doused early in the attack. On the other hand, enemy fighter activity was intense from the Stuttgart area to the target and beyond. Many combats were reported. "L" (F/S Wilson) claimed to have damaged a JU.88. "K" (/O Findlay) saw stikes on another. "D" (F/S Jamieson) landed at Manston with the rear gunner, Sgt, Klementoski, wounded so seriously that he has since died. "B" (F/O Liefooghe) failed to return, no news being received after take-off. S/L Caldow AFC, DFC and F/O Cowper completed their tours of operations. The latter came home on three engines. Six aircraft and crews carried out day and night flying training.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 16,300 ft at 21.30 hrs

Operation/Target: Training (17 Mar 1945 - 17 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Training 17 Mar 1945 17 Mar 1945 N The Squadron was not called upon to operate, and so put six aircraft and crews on day and night flying training. "E2" (F/S Lockyer) was attacked and shot down by an enemy intruder crashing at Bridlington, Yorks. The Flight Engineer, Sgt. Drawbridge was the sole survivor. It was his crew's first flight since joining the Squadron.

[Ed. Some sources quote "Shot down by an intruder (F.W. Rudi Morenz from IV. / NJG2) at 18.00 and crashed on Sunk Island in the River Humber."
The time is not correct: 18:00 appears to be the time the note is recorded in the ORB, and not the time of the shooting-down/crash.
The debriefing report (Station Narrative No. 17) states at "23:05 A/c shot down near Withernsea. 23:17 A/c still burning and cannot be approached" and gives a grid reference listed as being "Withernsea sea-front". At 23:59 the North Killingholme CO is informed that Sgt Drawbridge is at Withernsea Police Station.

Note: Only a single flight shown below: the Squadron record book does not list training flights (the exception being the mention of the FTR aircraft on this occasion).]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 FTR Training, shot down in the River Humber by intruder P/O A C Lockyer (P)
Sgt F E Drawbridge (F/Eng)
Sgt W Berry (Nav)
W/O H L Farmer (A/B)
Sgt L Elliott (W/Op)
Sgt S Matthews (MU/AG)
Sgt D Lucey (R/AG)

Operation/Target: Nordhausen (03 Apr 1945 - 03 Apr 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Nordhausen 03 Apr 1945 03 Apr 1945 N 23 aircraft took off - one cancelled owning to engine trouble the remainder took off without incident - to attack a military barracks at NORDHAUSEN. The weather however was not at all cooperative. The continent was covered with varying amounts of cloud 5/10 - 10/10 solid with tops 12000 ft. There were no signs of any sky marking and consequently the Master Bomber gave instructions to bomb on the best "Navigational aids" possible which in most cases was H2S. Four crews decided that the state of their H2S did not warrant bombing and brought their bombs back to base, which in the circumstances was the best procedure. The attack was very scattered. No opposition from ground or air was experienced.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NG132 Returned Primary at 13,000 ft at 16.18 hrs [Ed. There must be an error in ORB: NG132 lost in Humber 17 Mar 45, 6 KIA, 1 Surv.] F/Sgt G W Jamieson (P)
F/Sgt H W Burlingham (F/Eng)
F/O E A Butcher (Nav)
Sgt W D Riley (A/B)
F/Sgt J P Aucoin (W/Op)
F/Sgt J W Hamilton (MU/AG)
Sgt D C Whitmarsh (R/AG)

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 54
MAX Aircraft deployed
in single operation
1
(Calais, 25 Sep 1944)

These details were last updated: 22 April 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.


Return to the top of the page.