Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Pforzheim (23 Feb 1945 - 24 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Pforzheim 23 Feb 1945 24 Feb 1945 N 27 aircraft and crews were called for to attack PFORZHEIM and took off at approx. 16.00hrs without incident. Weather at take off was 10/10 low cloud down to 600 ft, but broke up over the continent and the target was quite clear, with some "dangerous moonlight". The markers were accurately placed and the bombing was correspondingly concentrated and the attack has every appearance of being a hightly successful one, fires could still be seen 150 miles away on the homeward journey. Very slight light flak was encountered over the target but night fighters were much in evidence. "C" (F/O Grundy) failed to return from this operation. F/O RD Harris in [NF998] despite a damaged port outer engine which caught fire over the target and severed tube caused by incendiaries, limped back and landed at Manston. One of the crew was injured but not seriously.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NF135 Returned Primary at 9,000 ft at 19.59 1/2 F/L C A Rhude (P)
Sgt P D Fitzgerald (Nav)
F/O C D Goughnour (A/B)
Sgt D A Blyth (W/Op)
Sgt C G Falliur (R/AG)
W/O R E Vietheer (MU/AG)
Sgt W M Kennedy (F/Eng)

Operation/Target: Meuss (28 Feb 1945 - 28 Feb 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Meuss 28 Feb 1945 28 Feb 1945 Y 27 aircraft and crews were detailed and took off without incident at approximately 08.00hrs to attack the railway centre at MEUSS and the river unloading port on the Western Bank of the Rhine just opposite Dusseldorf. The crews had been in the air little more than an hour when they were recalled. The operation was cancelled due to forecast cloudy conditions over the target area and the close proximity of our troops The boys were very disappointed to not be able to strike again at the common enemy.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NF135 Returned Recalled

Operation/Target: Hanau (18 Mar 1945 - 19 Mar 1945)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Hanau 18 Mar 1945 19 Mar 1945 N Squadron detailed 18 aircraft to attack Hanau. "M2" (F/L Sarll) aircraft developed ignition trouble in the port outer engine and did not leave its dispersal. The other 17 aircraft took off in quick succession, commencing at23.50 hours. The route was moderately quite, athough approaching the target and coming out of it, there was evidence of night fighters. Cloud varied in amount, but over the target it was thin. The marking was carried out punctually and in text book fashion. Bombing was reported as well concentrated and the effects were visible from 85 mils distant on the return journey. "D2" (F/O Lukies) reported a combat with a JU.88 and claimed it as damaged. Reports of other crews confirmed this. F/L Dale and crew completed their tour with this op. "Q" (F/L Burrows) aircraft failed to return. Five members returned to the Sqdn after bailing out over no-mans-land and spending exciting days with the 12th US Army. Three aircraft and crews flew 14 1/4 hours on training details.
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
NF135 Returned Primary at 10,000 ft at 04.34 hrs

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 3
MAX Aircraft deployed
in single operation
1
(Pforzheim, 23 Feb 1945)

These details were last updated: 12 September 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.


Return to the top of the page.