Squadron Operations: Summary Information

Overview

There follows below a list of the all of the operations flown by 550 Squadron and the aircraft involved on each. The information used to build this page was taken in the first instance from the lists provided on the original Squadron Association web-site, but has been augmented by new information gathered since that time (squadron operations logs, individual aircrew log books, and other sources).

This information is not yet complete: it has been build from the a number of sources (documentary and people) and compilation of complete lists is an ongoing task that is expected to take quite some time to complete. So please don't shout just yet if you spot an omission - work continues to build a more complete, and accurate, list.
Do however shout if you spot an error! Please email any corrections or information to the contact details in the link at the bottom of the page.

Operation Summary: The column headers should be fairly self-explanatory. The term "aborted" as used here covers a number of possibilities:

Aircraft Deployed: When a link to a particular aircraft is given, this indicates aircraft known to have taken part in this raid (in the records currently available to the web-site author). A record of whether the aircraft returned or failed to return (FTR) is also logged.

Servicemen Deployed: Names of the crew in the operation.

Station Summary: This section is the information from the RAF North Killingholme Station Record Book for the operational date (if available).

Definitions of the abbreviations used are available: here.

Manageable Lists

The amount of data in the database is growing and this is resulting in the "all operations/targets" list getting rapidly bigger and thus slower to generate. There are options to display shorter, more quickly generated, reports if you want to home in on something specific. For example, there are options to generate reports on operations to a single target, or by single aircraft (to all targets) or by single aircraft to a single target. There is, on the database-reports summary page, a short user guide (PDF format) on how to do this.


Operation/Target: Duisburg (21 May 1944 - 22 May 1944)

Operation Summary
Target Out Back Aborted
(Y / N)
Comments
Duisburg 21 May 1944 22 May 1944 N Eighteen aircraft and crews offered for operations and all were accepted and briefed to attach targets in DUISBURG, the steel and coal centre of the Ruhr and Rhine, which has not had the attention of Bomber Command for about twelve months. The weather over the target was cloudy and called for blind bombing by a method which has already paid good dividends in "Happy Valley". Photographs as was to be expected yielded no joy and cannot profitably be commented upon, all showing thick cloud and in some instances fine tracks. Although there were several sightings of the enemy the general impressions of DUISBURG defences confirms the view that they were less active than a year ago. P/O Dukelow, F/S Hinde and Sgt Essex with their crews failed to return to Base.

[Ed: but can only find 17 aircraft listed in the battle-order (after multiple cross-checking of the ORB) of which 3 aircraft and crews FTR.]
Aircraft Deployed Servicemen Deployed
Aircraft Service Number Returned
or FTR
Comments Crew Details
ED796 Returned Primary 23,000 ft at 01.19 hrs P/O K J Newman (P)
Sgt J B Rowlands (F/Eng)
F/O E A F Hall (Nav)
Sgt W J Kemp (A/B)
F/Sgt J C O'Riordan (MU/AG)
Sgt W J McCallum (R/AG)
Sgt P C M King (W/Op)

Summary Statistics

Based on the data in the lists displayed above, and keeping in mind that data is still being updated and thus not yet complete, the following statistics are generated:

Aircraft Deployment Statistics


Aircraft deployments 1
MAX Aircraft deployed
in single operation
1
(Duisburg, 21 May 1944)

These details were last updated: 22 April 2024


Note

this list is still being built and will take some time to complete
what is currently displayed is believed accurate but much more is still to be added

This note describes the options currently available to produce a smaller, more manageable list and also describes planned future enhancements to the reporting facility.


Return to the top of the page.